Installation Guide for Ultravation models including: UVC Monitor Radiometer, Monitor Radiometer, Radiometer
Commercial IAQ | Ultravation Commercial Indoor Air Quality Products
File Info : application/pdf, 1 Pages, 522.97KB
DocumentDocumentUVC Monitor installation instruction · The UV sensor must be mounted facing the lamp(s), approximately 3-10" (8-25 cm) away from the lamp(s). · If the radiometer displays "Sensor Saturated" the sensor has detected UV intensity greater than 21,300 W/cm2. Move the sensor away from the lamps until this condition is resolved. · Use supplied bracket assembly as shown. bracket assembly clips on to any SI rack system and places the sensor approximately 4" away from the UVC source. · If choosing to not use the supplied bracket, use two screws, mount the sensor on a flat, clean surface where no water will drip directly on the sensor. · For optimal performance be sure to keep the sensor clean. To clean the sensor, we recommend using a cotton swab and isopropyl alcohol with compressed air. Route RJ-11 supplied cable, connect each end. The UV Meter control box must be mounted on the exterior of the HVAC ductwork / equipment. Use Approved HVAC foil backed tape to cover any exposed wiring with unknown exposure limits to UVC including sensor cable. 18000 Hours T3 Enhanced UV Expandable Width Design for All rights reserved Ultravation, Inc. 2024 866-468-8247 Ultravation.com Sales@ultravation.com DC-IS-SI-meter brckt pplied for Easy Installation. 7 V Input Option Recommended installation point