Instruction Manual for Schreder models including: CLB1, CLB2, CLB1 Circle LED Base, CLB1, Circle LED Base, LED Base, Base
File Info : application/pdf, 3 Pages, 2.67MB
DocumentDocument98mm Copyright © Schréder S.A. 2024 - Executive Publisher: Stéphane Halleux - B-4000 Liége, Rue de Mons 3 (Belgium) - The information, descriptions and illustrations herein are only of an indicative nature and subject to changes without notice. CIRCLE LED BASE 1&2 for VALENTINO ENG INSTALLATION INSTRUCTIONS DEU INSTALLATIONSANLEITUNG FRA INSTRUCTIONS DE MONTAGE SRP UPUTSTVA ZA INSTALACIJU ITA POL SPA ARA ISTRUZIONI DI INSTALLAZIONE INSTRUKCJE MONTAU INSTRUCCIONES DE INSTALACIÓN NLD RUS POR INSTALLATIE INSTRUCTIES DAN INSTALLATIONSVEJLEDNING RON INSTRUCIUNI DE INSTALARE INSTRUÇÕES DE INSTALAÇÃO SWE INSTALLATIONSANVISNING HUN TELEPÍTÉSI ÚTMUTATÓ CHI UKR All the tightening torques values are given for assemblies without the addition of a grease decreasing friction. X PZ2 VALENTINO WITH CLB1* 141.8mm 132mm 319mm 182mm 319mm 302.6mm 193.9mm 302.6mm 94.1mm 193mm 243mm *CLB2 is also available for VALENTINO, with the same adaptation plate size dimensions (only the cut-out being different) 03-77-296 | rev A | 04-2024 www.schreder.com 1/3 1 2 X Disconnect the luminaire from network and clean the surface Open the luminaire for gear compartment and light source access 3 4 Copyright © Schréder S.A. 2024 - Executive Publisher: Stéphane Halleux - B-4000 Liége, Rue de Mons 3 (Belgium) - The information, descriptions and illustrations herein are only of an indicative nature and subject to changes without notice. Disconnect mains and remove connectors from cables KEEP THESE FOR LATER USE! 5 PZ2 Disconnect HID cables 6 4xM5 Remove screws holding the optical compartment. KEEP THESE FOR LATER USE! Remove optical compartment 03-77-296 | rev A | 04-2024 www.schreder.com 2/3 Copyright © Schréder S.A. 2024 - Executive Publisher: Stéphane Halleux - B-4000 Liége, Rue de Mons 3 (Belgium) - The information, descriptions and illustrations herein are only of an indicative nature and subject to changes without notice. 7 8 PZ2 4xM5 Remove gearplate 9 Place and fasten the adaptation plate into position in the luminaire body with the previously removed screws (tightening torque: 2Nm) 10 b. a. a. PZ2 1xM5 Put connectors on mains cable and CLB cable a. Connect earthing cable of the adaptation plate to luminaire body b. Connect mains cable to CLB unit 11 12 X Close the luminaire 03-77-296 | rev A | 04-2024 Connect the assembly back on network www.schreder.com 3/3