Installation Guide for Altronix models including: T3SSK75F28, T3SSK75F28D, 28 Door Kit with Fused Outputs, T3SSK75F28 28 Door Kit with Fused Outputs, T3SSK75F28 28 Door Kit
Altronix T3SSK75F28 28-Door Access and Power Integration Kit, Trove3SS3 with eFlow104NB, eFlow102NB, (3) ACM8, ACM4, (2) PD16W, RSB2 | 123 Security Products
Altronix T3SSK75F28D 28-Door Access and Power Integration Kit, Trove3SS3 with eFlow104NB, eFlow102NB, (3) ACM8CB, ACM4CB, (2) PD16WCB, RSB2 | 123 Security Products
File Info : application/pdf, 4 Pages, 921.25KB
DocumentDocumentAccess & Power Integration Altronix/Lenel-S2 (S2 Security Platform) Kits Models Include: T3SSK75F28 28 Door Kit with Fused Outputs Fully assembled kit includes: - Trove3 enclosure with TSS3 Altronix/Lenel-S2 (S2 Security Platform) backplane - One (1) eFlow104NB - Power Supply/Charger - One (1) eFlow102NB - Power Supply/Charger - Three (3) ACM8 - Fused Access Power Controllers - One (1) ACM4 - Fused Access Power Controller - Two (2) PD16W - Fused Power Distribution Module - One (1) RSB2* - Rocker Switch Bracket with Two (2) Rocker Switches (Not evaluated by UL) T3SSK75F28D 28 Door Kit with PTC Outputs Fully assembled kit includes: - Trove3 enclosure with TSS3 Altronix/Lenel-S2 (S2 Security Platform) backplane - One (1) eFlow104NB - Power Supply/Charger - One (1) eFlow102NB - Power Supply/Charger - Three (3) ACM8CB - PTC Access Power Controllers - One (1) ACM4CB - PTC Access Power Controller - Two (2) PD16WCB - PTC Power Distribution Module - One (1) RSB2* - Rocker Switch Bracket with Two (2) Rocker Switches (Not evaluated by UL) All components of this Trove kit are UL Listed sub-assemblies. Please refer to the included corresponding Sub-Assembly Installation Guides for further information. Installation Guide All registered trademarks are property of their respective owners. Rev. T3SSK_081220 More than just power.TM Installing Company: _________________________ Service Rep. Name: __________________________________________ Address: _________________________________________________________ Phone #: _________________________ Overview: Altronix T3SSK75F28 and T3SSK75F28D Trove S2 kits are pre-assembled and consist of Trove enclosures/backplanes with factory installed Altronix power supply/chargers and sub-assemblies. Both kits accommodate Lenel-S2 (S2 Security Platform) S2-INST Installation Kit for S2 Network Node for up to twenty-eight (28) (T2SSK7F8) doors in a single enclosure. 120VAC 60Hz Input Current (A) Power Supply Board Input Fuse Rating Power Supply Board Battery Fuse Rating Output Range (VDC) Output Range (VDC) Output Range (VDC) Output Range (VDC) Fail-Safe/Fail-Secure Outputs Additional Fused Outputs ACM8(CB) Board Input Fuse Rating ACM8 Board Output Fuse Rating ACM8CB Board Output PTC Rating ACM4(CB) Board Input Fuse Rating ACM4 Board Output Fuse Rating ACM4CB Board Output PTC Rating PD16W Board Output Fuse Rating PD16WCB Board Output PTC Rating Altronix Model Number T3SSK75F28 T3SSK75F28D Configuration Chart: Nominal DC Output Voltage Power Supply 1 [DC] [Aux] Power Supply 2 Maximum [DC] [Aux] Supply Current for Main and Aux. Outputs on Power Supply board and ACM8(CB) Access Power Controllers' outputs eFlow104NB 6.3A/ 250V 7.5 eFlow102NB 5A/ 250V 15A/ 20.17- 20.28- 9.7- 10.0332V 26.4 26.4 13.2 13.2 24VDC @ 9.4A 12VDC @ 10A 3.5A/ 3A/ 3.5A/ 28 16 10A/ 250V 250V 10A/ 32V 32V 250V 2.5A 2.5A 2.5A Installation Instructions: Wiring methods shall be in accordance with the National Electrical Code/NFPA 70/ANSI, and with all local codes and authorities having jurisdiction. Product is intended for indoor use only. 1. Remove backplane from enclosure. Do not discard hardware. 2. Mark and predrill holes in the wall to line up with the top two/three keyholes in the enclosure. Install two/three upper fasteners and screws in the wall with the screw heads protruding. Place the enclosure's upper keyholes over the two/three upper screws; level and secure. Mark the position of the lower three holes. Remove the enclosure. Drill the lower holes and install the three fasteners. Place the enclosure's upper keyholes over the two/three upper screws. Install the three lower screws and make sure to tighten all screws. 3. Mount included UL Listed tamper switches (Altronix Model TS112 or equivalent) in desired Fig. 1 locations, opposite hinge. Slide the tamper switch bracket onto the edge of the enclosure approximately 2" from the right side (Fig. 1, pg. 2). Connect tamper switch wiring to the Access Control Panel input or the appropriate UL Listed reporting device. Enclosure To activate alarm signal open the door of the enclosure. 4. Mount S2-INST Installation Kit to backplane, refer to page 3. Edge of Enclosure 5. Refer to the eFlow Power Supply/Charger Installation Guide for eFlow102NB and eFlow104NB and corresponding Sub-Assembly Installation Guides for ACM4(CB), ACM8(CB) and PD16W(CB) for further installation instructions. Tamper Switch (provided) Hardware: To Access Control Panel or UL Listed Reporting Device Lock Nut - 2 - Trove3 S2 Kits Installation Guide Fig. 2a Pem Lock nut Backplane - 3 - Trove3 S2 Kits Installation Guide S PP N N S PP N N Altronix PD16W(CB) Altronix PD16W(CB) INTERFACE NO C NC +INP- T + RET- TRIGGER INPUT IN GND IN GND IN GND IN GND IN GND IN GND IN GND IN GND 1 2 3 4 5 6 7 8 FACP TRG ON ON 1234 1234 FACP Altronix ACM8(CB) MAIN 10A 250V NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM OUTPUT 1 OUTPUT 2 OUTPUT 3 OUTPUT 4 OUTPUT 5 OUTPUT 6 OUTPUT 7 OUTPUT 8 INTERFACE NO C NC +INP- T + RET- TRIGGER INPUT IN GND IN GND IN GND IN GND IN GND IN GND IN GND IN GND 1 2 3 4 5 6 7 8 FACP TRG ON ON 1234 1234 FACP Altronix ACM8(CB) MAIN 10A 250V NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM OUTPUT 1 OUTPUT 2 OUTPUT 3 OUTPUT 4 OUTPUT 5 OUTPUT 6 OUTPUT 7 OUTPUT 8 -+-+ Power Control -+-+ Power Control Altronix ACM4(CB) TRIGGER INPUT TRG IN GND IN GND IN GND IN GND 1 2 3 4 NC C NO COM NC C NO COM NC C NO COM NC C NO COM OUTPUT 1 OUTPUT 2 OUTPUT 3 OUTPUT 4 MAIN ACM4 ACCESS POWER CONTROLLER -- + -- + POWER CONTROL NO C NC FACP +INP- T +RETINTERFACE INTERFACE NO C NC +INP- T + RET- TRIGGER INPUT IN GND IN GND IN GND IN GND IN GND IN GND IN GND IN GND 1 2 3 4 5 6 7 8 FACP TRG ON ON 1234 1234 FACP Altronix ACM8(CB) MAIN 10A 250V NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM NC C NO COM OUTPUT 1 OUTPUT 2 OUTPUT 3 OUTPUT 4 OUTPUT 5 OUTPUT 6 OUTPUT 7 OUTPUT 8 + AUX - 2 hr disable TRIGGER EOL NO GND SUPERVISED RESET BAT FAIL AC FAIL NC C NO NC C NO L G N AC DC 1 min enable AC1 Altronix - eFlow102NB --- BAT + --- DC + S2-INST Installation Kit For S2 Network Node -+-+ Power Control RSB2 S2-INST Installation Kit For S2 Network Node N L G Altronix - eFlow104NB BAT + DC + T3SSK75F28(D): Access Controller Position Chart for the S2-INST Installation Kit: 1. Align S2-INST mounting holes with pems on TSS3 (Fig. 2, pg. 3). 2. Attach S2-INST to backplane with lock nuts (provided) (Fig. 2a, pg. 3). 3. Mount backplane to enclosure with hardware. 4. Fasten TSS3 backplane to Trove3 enclosure utilizing hardware (provided). Fig. 2 2.00" (50.8mm) Trove3 Enclosure Dimensions (H x W x D approximate): 36.12" x 30.125" x 7.06" (917.5mm x 768.1mm x 179.3mm) 2.00" (50.8mm) 1.25" (31.8mm) 7.12" (222.3mm) 9.5" (241.3mm) 9.5" (241.3mm) 1.78" (45.2mm) 1.55" (39.4mm) 1.25" (31.8mm) 1.07" (27.2mm) 30.12" (768.1mm) 14.01" (355.9mm) 14.01" (355.9mm) 2" (50.8mm) 1.10" (27.9mm) G G 10.75" (273.1mm) 10.75" (273.1mm) 10.62" (269.8mm) 36.12" (917.5mm) 33.63" (854.2mm) 10.62" (269.8mm) 10.75" (273.1mm) 10.75" (273.1mm) 1.25" (31.8mm) 2" 8.75" (222.3mm) (50.8mm) 8.62" (219mm) 8.75" (222.3mm) 7.06" (179.3mm) 1.25" (31.8mm) Altronix is not responsible for any typographical errors. 140 58th Street, Brooklyn, New York 11220 USA | phone: 718-567-8181 | fax: 718-567-9056 web site: www.altronix.com | e-mail: info@altronix.com | Lifetime Warranty IITrove3 SS Kits I23U MEMBER - 4 - Trove3 S2 Kits Installation Guide