User Manual for Onumen Technology models including: EP2, EP2 Mobile LED Screen, Mobile LED Screen, LED Screen, Screen

移动精灵EP2 说明书(英文版)

Manual of EP2 Liftable and Lowerable LED Display Kit

Catalogs and Manuals of LED Display Screens

PDF preview unavailable. Download the PDF instead.

EP2 Manual 1695db47-0473-4eb5-b2d3-b3a4d5fc7ab9 ?v=1678246594
Mobile LED Screen


Product overview ............................................................................................. 02 Configuration and parameters ....................................................................... 03-04 Interface identification diagram .................................................................... 05 Physical dimension .......................................................................................... 06 Erect installation steps .................................................................................... 07-14 Flat lay installation steps ................................................................................. 15-19 Remote control operation ............................................................................... 20 Built-in asynchronous card ............................................................................. 21 Nova system operation .................................................................................... 22-24 Use precautions ................................................................................................ 25
01


Product Introduction he EP2 is a new generation of intelligent folding display launched by Onumen Technology, It supports up to 2 meters high and can be infinitely spliced horizontally. Indoor and outdoor optional For indoor,P3.9 and P5.2 available.For outdoor,P7.8 with high brightness available. Product Application
Widely used indoor and outdoor advertising and rental events.
Product Features Small volume, fast retracting; Convenient and fast, saving labor and transportation space; Single person takes 5mins to build one set screen by 3 steps. Patent EP2 have obtained many domestic and international certifications and patents: RoHS, CE, FCC, TUV, etc.
02

Configuration Parameter

The whole parameter

Size Weight Input Voltage Max Power Consumption Storage temperature Storage humidity Protection level

1390mm*409mm*323mm 62kg
AC1100-240V 50/60Hz 1000W
-40-80 0%-95% RH indoor IP43 Outdoor IP65

Screen Parameter

Screen body

Indoor: P3.9, P5.2, 850NITS, IP43 OutdoorP5.2, P7.8,6000NITS, IP65

Weight of the screen body Screen size

12kg/sqm 1mWx2mH

Work voltage

DC24V

RemarkThere is one screen in one flight case,screen size is 1mWx2m H.

03

Configuration Parameter

Parameter for electric lifting rod

Weight Load-bearing Working Voltage Working Current Stretch speed Mode of operation

5.5kg 50kg
DC24V 1A The Max. 1A Up to 17mm/second Remote control

Parameter for control box

Asynchronous card Nova T1,wifi, Control up to 650,000 pixels

Power Supply

Meanwell RSP1000W-24

External battery or DC power supply

DC24V

Reciveing card

Nova A4S

Signal output interface for screen body

2+13*4pcs

Motor interface for Pushrod

2PIN Plug

Weight

8kg

Remark One control box in one flight case

04

Interface labeling diagram
05

Physical Dimention
1390 409 323
06

Erect installation steps
1 Open flight case.

lifting rod and beam kit

accessory

screen
supporting beam control box

2 Open the buckles at both sides of the electric lifting rod.

07

Erect installation steps
3 Erect the electric lifting rod and take out the screen box and all accessories.
4 Lie down the electric lifting rod and fasten the buckle, and open the front support feet to the maximum extent.
08

Erect installation steps
5 Erect flight case, pull out the control lines, plug in the main power cable and press the "power" switch.
6 Hang the screen on the electric lifting rod,push the remote control switch to rise screen above the flight case, press pause.
09

Erect installation steps
7 Fasten one end of the back pull wire rope to the screen hanger,and put the wire rope to the back of flight case.
8 Continue to rise the screen before the third screen height, adjustable hook at the bottom end of the back wire can adjust the verticality of the lifting rod.
10

Erect installation steps
9 Turn the remote control switch to"F"to turn off, turn off the"Power"switch on the control box, and turn off the main power.Connect the screen control cables in turn, from left to right OUT1~OUT4.
10 Plug in the power cable to light up screen (single unit installation completed).
11

Erect installation steps
11 When splicing multiple sets, take out the splicing connecting pieces and buckle the connecting piece into the hook at the screen splicing.
screen clamp
screen connecting piece 12

Erect installation steps
12 The screen is spliced with four corner connectors, one for each two lines.
13

Erect installation steps
13 Multiple splicing completed.
14

Flat lay installation steps

1 Open flight case.

lifting rod and beam kit

accessory

screen
supporting beam control box

2 Open the buckles at both sides of the electric lifting rod.

15

Flat lay installation steps
3 Erect the electric lifting rod and take out the screen box and all accessories.
4 Move the screen to the front and take out the two flat support rods. One end is fixed on the electric lifting rod and the other end is fixed on both sides of the box.
16

Flat lay installation steps
5 Hang the screen on the bearing frame.
6 Plug in power cable to feed power,press the "power" switch of the electric lifting rod and the red light will be on.
17

Flat lay installation steps
7 Take out two wire ropes and connect them into one, One end of which is buckled on the screen hanger and the other end is buckled into the box ring buckle.
Wire length can be adjusted manually to ensure that the lifting rod does not bend vertically
8 Take out the remote control and pull out the antenna, push the remote control switch to "N" and press "" key to raise the screen completely.
2 1
18

Flat lay installation steps
9 Turn off the "Power" switch of electric lifting rod, the red light is off,cut off the main power supply.

2

OUT1

OUT2

OUT3

OUT4

1

10 Plug in the power cable to light up screen.

1 2
19

Remote Control Operation
Code matching button and remote control picture

Control box

Remote control code button

--------(up) --------Pause --------(down

The operations are as follows:

Remote control

Clearing Methond : Code matching method: Press the learning button once, the indicator light flashes slowly, immediately press the "A" button on the remote control, flashing 4-5 times quickly,It indicates that the "A" key has been successfully learned. Press the "B" key twice to learn and the blinking pattern is the same as above (Note: The remote controller does not have a learning value as a stop function in the "interlock" mode. The learning waiting time is about 6S. Automatically exit the learning mode after success)

Code method Turn on the power , press the code button on the receiver board ,then the indicator light is always on, then start to press the remote control to perform the code. Press the remote control A ( up ) button first , the receiver indicator will flash four times , then Press the remote B (down) button, the indicator light flashes four times, complete the code. At this point, the remote control can control the operation.

Add remote control : If add more than one remote controller on the basis of the original remote controller, just follow the steps of the code matching method.Adding the remote controller does not need to clear the code! The receiver can code 18 remote controls with different codes. If there are more than 18 remote controls, the first remote control will automatically fail! There are countless remote controls of the same code.

Pushrod remote suppots the following function:
One remote control to control a lifting rod One remote control controls multiple lifting rod Multiple remote controls for one lifting rod Multiple remote controls for multiple lifting rod

20

Built-in asynchronous card
Use built-in asynchronous card
Pull out the network cable when using asynchronously
When using asynchronous, connect the asynchronous signal cable to one of the signal ports.
Not use built-in asynchronous card
Connect the network cable when using synchronously
When asynchronous is not used, unplug the asynchronous signal cable.
21

The Operation Of Nova System
1This product is equipped with Nova system, you can go to Nova official website for related information. www.novastar-led.cn
2This product is equipped with Nova T1 multimedia player card. For related functions and operations, please view the TB1 specification download . in the official website www.novastar-led.cn. www.novastar-led.cn
3 Please Download software NovaLCT V5.2.0 for configuration parameter, The parameter setting of the product has been debugged at the factory.When the customer is in use, generally only need to use: parameter sending
22

The Operation Of Nova System

input parameter file

Send after the parameter input
Final curing

23

The Operation Of Nova System
Brightness adjustment
24

The Operation Of Nova System
send
Final curing
For detailed operation, please refer to the NovaLCT V5.2.0 user manual. If you still have any problems, please consult our technical staff. For video transmission software, please download ViPlex, video transmission support PC transmission and mobile phone transmission ( Mobile version of Viplex Handy and PC version of Viples Express, please download and install). For details, please refer to the ViPlex Express user manual. If you still have any problems, please consult our Technical staff  Asynchronous playback also supports Nova's remote VNOX cloud release, which enables remote management of products through the Internet, and chang es to broadcast programs. For details, please view the webiste http://www.vnnox.com, Vplayer Software Download The user manual can be viewed directly on the download page. Nova's remote cloud release is currently a paid service. Need permission and annual fee to use. If necessary, please contact us directly or contact Nova directly.
25

EP2 use precautions
1Screen a.The power must be turned off before connecting and unplugging the control cables b.When hanging the screen, be sure to hang the hook to avoid the hook off the screen. 2Remote control operation a.There is a switch on the right side of the remote control. When using it, pull it to "N". When not in use, pull it to "F". Please don't keep it on, avoiding misuse! b.Always pay attention to the operation of the remote control during lifting, and let the lifting rod stop when encountering abnormal conditions! c.When using the "1 control multi", the remote control recommends pressing 2-3 times each time. Avoid individual products that are not receiving information in time without being controlled! d.After each rise and fall, you should press the "" stop button on the remote control again! e.If you find that the remote control cannot control the rise or fall, immediately turn off the main power supply, then power on and try to check the cause! f.When the remote control is found to be less sensitive or often uncontrolled, the remote control battery may be insufficient or the remote control may be damaged,pls replace in time! 3Electric lifting a.The "POWER" button on the control box is to control lifting rod. It can only turn off lifting rod, cannot turn off the screen. It only opens when the lifting rod is required to be lifted and lowered. Please turn it off when not in use to avoid accidents caused by accidentally pressing the remote control! b.The lifting should be completed several times in sections. During the lifting process, pay attention to the lifting rod, back pull wire rope, screen body, Cables, etc. will not got stuck, always pay attention to stop lifting! c.After fully lowering, the back pull wire rope should be taken off to avoid accidents when it rises again! 4Installation a.After the supporting frame is installed, first check whether the lifting rod is stable, whether the top rack is loose, and the support fixing components on the lifting rod are firmly installed! b.The front support legs of the frame should be opened to the maximum in an "eight" shape.
26


Adobe PDF library 15.00 Adobe Illustrator CC 2015 (Windows)