Instruction Manual for DATREND Systems models including: MN-150x Automated ESU Analyzer, MN-150x, Automated ESU Analyzer, ESU Analyzer, Analyzer

MN-150x 6100-205 vPad-ESU Operators Manual

Mark Miller

[PDF] MN-150x 6100-205 vPad-ESU Operators Manual - QRS Solutions

UL Std. No. 61010-1 (2 Edition) - Safety Requirements for Electrical ... File: CN1838 20151116 125648 P.txt. Date: 2015 Nov 16. Time: 12:56:48. vPad-ESU ...

vPad-ESU Operators Manual 2024-07-15

vPad-ESU - QRS Solutions


File Info : application/pdf, 95 Pages, 25.33MB

PDF preview unavailable. Download the PDF instead.

MN-150a-6100-205-vPad-ESU-Operators-Manual
vPad-ESUTM
Automated ESU Analyzer
App Version 5.00.X

MN-150a

Operating Manual

vPad-ESUTM
Automated ESU Analyzer
Operating Manual
© 2024 Datrend Systems Inc. Unit 130 - 4020 Viking Way Richmond, BC · CANADA · V6V 2L4 Tel: 800.667.6557 (North America only) or +1.604.291.7747 · Fax +1.604.294.2355 e-mail: customerservice@datrend.com

To order this manual, use Part Number 6100-205

Revision A

Revision History Description
Initial release

Date 2024-Apr-18

Copyright Datrend Systems Inc. ("DSI") agrees to a limited copyright release that allows you to reproduce manuals and other printed m aterials for use in service training programs and other technical publications. If you would like other reproductions or distributions, subm it a written request to Datrend Systems Inc.
Unpacking and Inspection Follow standard receiving practices upon receipt of the instrum ent. Check the shipping carton for dam age. If dam age is found, stop unpacking the instrum ent. Notify the freight carrier and ask for an agent to be present while the instrum ent is unpacked. There are no special unpacking instructions, but be careful not to damage the instrument when unpacking it. Inspect the instrum ent for physical dam age such as bent or broken parts, dents, or scratches.
C laim s Our routine m ethod of shipm ent is via com m on carrier. Upon delivery, if physical dam age is found, retain all packing m aterials in their original condition and contact the carrier im m ediately to file a claim . If the instrument is delivered in good physical condition but does not operate within specifications, or if there are any other problems not caused by shipping dam age, please contact your local sales representative or DSI im m ediately.
Standard Terms and Conditions
Refunds & Credits Please note only serialized products (products labelled with a distinct serial number) and accessories are eligible for partial refund and/or credit. Non-serialized parts and accessory items (cables, carrying cases, auxiliary m odules, etc.) are not eligible for return or refund. In order to receive a partial refund/credit, the product must not have been damaged, and must be returned com plete (m eaning all m anuals, cables, accessories, etc.) within 90 days of original purchase and in "as new" and resalable condition. The Return Procedure m ust be followed.
Return Procedure Every product returned for refund/credit must be accom panied by a Return Material Authorization (RMA) number, obtained from Datrend Custom er Service. All item s being returned must be sent prepaid (freight, duty, brokerage, and taxes) to our factory location.
Restocking Charges Products returned within 30 days of original purchase are subject to a m inim um restocking fee of 15%. Products returned in excess of 30 days after purchase, but prior to 90 days, are subject to a minimum restocking fee of 20%. Additional charges for dam age and/or m issing parts and accessories will be applied to all returns. Products which are not in "as new" and resalable condition, are not eligible for credit return and will be returned to the custom er at their expense.
Certification This instrum ent was thoroughly tested and inspected and found to m eet DSI's m anufacturing specifications when it was shipped from the factory. Calibration m easurem ents are traceable to the National Research Council of Canada (NRC) and/or the National Institute of Standards and Technology (NIST). Devices for which there are no NRC/NIST calibration standards are m easured against in-house perform ance standards using accepted test procedures.

Page i

W arranty
Warranty and Product Support
Datrend Systems Inc. ("DSI") warrants the Analyzer Base Unit of vPad-ESU (the "Datrend product") to be free from defects in materials and workmanship under normal use and service for one (1) year from the date of original purchase. This warranty will be autom atically extended to two (2) years from the date of original purchase, provided that calibration is perform ed on an annual basis by a Datrend Authorized Service Center*. During the warranty period DSI will, at our option, either repair or replace defects in m aterials and workmanship at no charge; provided the Datrend product is returned (shipping, duty, brokerage and taxes prepaid) to DSI. Any and all transportation charges incurred are the responsibility of the purchaser and are not included within this warranty. This warranty extends only to the original purchaser and does not cover dam age from abuse, neglect, accident or m isuse or as the result of service or m odification by other than DSI. IN NO EVENT SHALL DATREND SYSTEMS INC. BE LIABLE FOR CONSEQUENTIAL DAMAGES.
This warranty is subject to the following lim itations: ! Tablet PC: per tablet m anufacturer's original warranty ! Standard Accessories: 90 day limited warranty ! Dam age to instrum ent due to activation of an electrosurgical generator connected to FOOTSW ITCH; REM; ACTIVE;
DISPERSIVE; MA; and/or HF LEAKAGE term inals is not covered under the warranty ! Damage to tablet PC due to contact with an activated electrosurgical generator is not covered under warranty ! Re-calibration of the instrument, which has a recomm ended annual calibration frequency, is not covered under the
warranty.
No warranty shall apply when damage is caused by any of the following: ! Power failure, surges, or spikes, ! Dam age in transit or when m oving the instrum ent, ! Improper power supply such as low voltage, incorrect voltage, defective wiring or inadequate fuses, ! Accident, alteration, abuse or misuse of the instrument, ! Fire, water dam age, theft, war, riot, hostility, acts of God, such as hurricanes, floods, etc.
Only serialized products (those item s bearing a distinct serial num ber tag) and their accessory item s are covered under this warranty. PHYSICAL DAMAGE CAUSED BY MISUSE OR PHYSICAL ABUSE IS NOT COVERED UNDER THE W ARRANTY. Items such as cables and non-serialized modules are not covered under this warranty.
This warranty gives you specific legal rights and you m ay have other rights, which vary from province to province, state to state, or country to country. This warranty is limited to repairing the instrum ent to DSI's specifications.
W hen you return an instrum ent to DSI for service, repair or calibration, we recom m end shipm ent using the original shipping foam and container. If the original packing materials are not available, we recommend the following guide for repackaging: ! Use a double-walled carton of sufficient strength for the weight being shipped. ! Use heavy paper or cardboard to protect all instrument surfaces. Use non-abrasive material around all projecting parts. ! Use at least four inches of tightly packed, industrial-approved, shock-absorbent m aterial all around the instrum ent.
DSI will not be responsible for lost shipm ents or instrum ents received in dam aged condition due to im proper packaging or handling. All warranty claim shipments must be made on a prepaid basis (freight, duty, brokerage, and taxes). No returns will be accepted without a Return Materials Authorization ("RMA") number. Please contact Datrend (refer to Chapter 5 of this m anual) to obtain an RMA num ber and receive help with shipping/custom s docum entation.
* Subject to some exclusions, based on sales territory. Contact Datrend for details.
Page ii

Warranty Disclaimer Should you elect to have your instrum ent serviced and/or calibrated by som eone other than Datrend System s or an Authorized Service Centre, please be advised that the original warranty covering your product becom es void when the tam per-resistant Quality Seal is rem oved or broken without proper factory authorization. W e strongly recom m end, therefore, that you send your instrum ent to Datrend System s or an Authorized Service Centre for service and calibration, especially during the original warranty period. In all cases, breaking the tam per-resistant Quality Seal should be avoided at all cost, as this seal is the key to your original instrum ent warranty. In the event that the seal m ust be broken to gain internal access to the instrum ent (e.g., in the case of a custom er-installed firm ware upgrade), you must first contact Datrend System s at 1-604-291-7747. You will be required to provide us with the serial num ber for your instrum ent as well as a valid reason for breaking the Quality Seal. You should break this seal only after you have received factory authorization. Do not break the Quality Seal before you have contacted us! Following these steps will help ensure that you will retain the original warranty on your instrum ent without interruption.
W AR N IN G Unauthorized user m odifications or application beyond the published specifications m ay result in electrical shock hazards or im proper operation. Datrend System s will not be responsible for any injuries sustained due to unauthorized equipm ent m odifications.
DSI DISCLAIMS ALL OTHER WARRANTIES, EXPRESSED OR IMPLIED, INCLUDING ANY WARRANTY OF MERCHANTABILITY OR FITNESS FOR A PARTICULAR PURPOSE OR APPLICATION.
THIS PRODUCT CONTAINS NO USER-SERVICEABLE COMPONENTS. UNAUTHORIZED REMOVAL OF THE INSTRUMENT COVER SHALL VOID THIS AND ALL OTHER EXPRESSED OR IMPLIED WARRANTIES.
Note: Calibration of Datrend products typically involves adjustm ent of param eters stored in firm ware by proprietary software. Parties other than Datrend and its Authorized Service Centers are limited to verification of the status of the accuracy of the instrum ent. Do not confuse verification with calibration.
vPadTM, vPad-ESUTM, vPad-ESTM, vPad-353TM, vPad-ASTM, vPad-A3TM, vPad Record ManagerTM, vPad-RMTM, vPad-EQMTM, vPad-mTTM, vPad-CheckTM, vPad-CalTM, vPad-XPORTTM, vPad-AIMSTM, Datrend DocsTM and CMXTM are tradem arks of Datrend Systems Inc. AndroidTM is trademark of Google Inc. ValleylabTM, Force FXTM, Force EZTM and ForceTriadTM are trademarks of Medtronic - Covidien Ltd. System 5000TM is a trademark of CONMED Corporation
Page iii

Page iv

vPad-ESU OPERATORS MANUAL
Table of Contents
ABBREVIATIONS AND DEFINITIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . VII
SYMBOL DEFINITIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . IX
1 SPECIFICATIONS. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
1.1 Instrument Specifications.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1.1 Power Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1.2 RMS Current Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1.3 RMS Voltage Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1.4 Peak Voltage Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1.5 Crest Factor Measurement . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1 1.1.6 Instrument Bandwidth (-3dB) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1.7 Isolation, Earth to Measuring Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1.8 Variable Load. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1.9 RF Leakage Loads. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1.10 REM/CQM Test Resistance. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1.11 Footswitch Control . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 1.1.12 Operational Duty Cycle . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.1.13 HF Digital Oscilloscope . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.1.14 HF Spectrum Analyzer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3 1.1.15 Current Monitor Output . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
1.2 Measurement Terminals. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1.2.1 ACTIVE and DISPERSIVE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1.2.2 mA. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1.2.3 HF LEAKAGE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1.2.4 REM (CQM). . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4 1.2.5 FOOTSWITCH OUTPUT. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
1.3 User Interface. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5 1.4 Electrical Ratings. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 1.5 Fuses.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 1.6 Environment for Use. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 1.7 Dimensions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 1.8 Weight. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6 1.9 Standard Accessories. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 1.10 Optional Accessories. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 1.11 Compliance With Standards. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
2 OVERVIEW. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
2.1 RF Analyzer. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9 2.2 vPad-ESUTM App. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
3 SETUP. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Table of Contents # Page v

vPad-ESU OPERATORS MANUAL
4 OPERATION. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
4.1 HOME Screen. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15 4.2 Startup. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17 4.3 Main Menu. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18 4.4 Setup Menu. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
4.4.1 Report Title. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 4.4.2 List Editor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 19 4.4.3 AutoSequence Editor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21 4.4.4 Power Curve Test Editor. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23 4.5 HF Output Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 4.5.1 HF Test Setup.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 26 4.5.2 Test Warning. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 28 4.5.3 Continuous Monitoring of HF Output. . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29 4.5.4 Changing the Load.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30 4.5.5 Analyzer Setup.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31 4.6 HF Leakage Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 4.6.1 HF Leakage Setup. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41 4.6.2 HF Leakage Measurement. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44 4.7 REM (CQM) Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47 4.7.1 REM Test Setup. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 47 4.7.2 REM Test Procedure.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 48 4.7.3 Saving REM Test Results. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50 4.8 Viewing Test Results. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 51 4.9 Entering Equipment Information. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52 4.10 Creating a Test Record. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55 4.11 Automated Testing.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 4.11.1 Selecting and Starting a Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56 4.11.2 Test Execution. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 58 4.11.3 AutoSequence Programming. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 4.12 Power Curves. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 4.12.1 Selecting and Starting a Test. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62 4.12.2 Test Execution. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63 4.12.3 Power Curve Programming. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 66 4.13 Record Manager App.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 67
5 CALIBRATION AND MAINTENANCE. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
APPENDIX A. SAMPLE TEST RECORD. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71
Table of Contents # Page vi

vPad-ESU OPERATORS MANUAL

Abbreviations and Definitions

The following abbreviations, terms and acronyms are used throughout this manual:

A AAM I App CQM
DSP
DUT Earth ESU ESU Standard
GND or Ground HF
Hz IEC IM E kHz

Am pere
Am erican Association of Medical Instrum entation
Application software that causes a com puter to perform tasks for computer users.
Contact Quality Monitor. A monitoring system in an ESU which continuously tests for reliable and safe contact between a monopolar return electrode and the patient. A CQM system measures the im pedance across a split or dual-pad return electrode and will alarm and disable the generator in case of fault.
Digital Signal Processor. A specialized m icroprocessor with architecture optimized for the operational needs of digital signal processing, for exam ple, filtering or analyzing electrical signals represented as sampled data.
Device Under Test. The electrosurgical generator being tested.
See GND
Electrosurgical Unit. A high-frequency (HF) electrical generator used to cut or coagulate tissue in surgical procedures.
A standard established by a national or international agency which specifies safety and performance requirements for high-frequency m edical equipm ent such as ESUs. Recognized Standards Organizations include: AAMI - Association for Advancement of Medical Instrumentation IEC - International Electrotechnical Commission
The line (conductor) connected to a place that is m aintained at "Ground" or "Earth" voltage. Same as Protective Earth.
High Frequency; according to the ITU definition, a portion of the radio frequency spectrum occupying 3 to 30 Megahertz (MHz). W hen referring to ESUs or electrosurgical generators, "HF" im plies a frequency of operation somewhat below the ITU HF band, typically in the range of 0.2 to 2 MHz depending on generator make and model.
Hertz
International Electrotechnical Commission
Android input method (e.g. keyboard)
kilohertz

Definitions # Page vii

vPad-ESU OPERATORS MANUAL

Measurement Category (CAT) A method of classifying electrical connections used in measurement and testing, taking into account the total continuous energy available in the circuit. Categories range from CAT I (not for direct connection to AC mains) through CAT IV (continuous energy may exceed 110 kVA).

MHz

Megahertz

PE

Protective Earth. The line (conductor) connected to a place that is

maintained at "Ground" or "Earth" voltage.

REM

Return Electrode Monitor. A monitoring system in an ESU which continuously tests for reliable and safe contact between a monopolar return electrode and the patient. A REM system m easures the im pedance across a split or dual-pad return electrode and will alarm and disable the generator in case of fault.

RMS V

Root-Mean-Square m easurem ent of a param eter (eg. V rms, A rms....) Volt

Vrms

Volts rms

W

W att

Definitions # Page viii

vPad-ESU OPERATORS MANUAL
Symbol Definitions
The following sym bols m ay be found on vPad-ESU:
CONSULT MANUAL FOR PROPER OPERATION
The operating m anual provides valuable inform ation on the proper use of vPad-ESU. It is highly recom m ended the operator read the instructions thoroughly before operating the device. It is possible to damage the Equipment Under Test (EUT) and/or cause harm to the operator if vPad-ESU is used incorrectly.

10KV MAX

This warning label appears between ACTIVE and DISPERSIVE term inals of the variable resistive load. The maximum peak instantaneous voltage which may be applied between ACTIVE and DISPERSIVE terminals is 10,000V when the load is set for m axim um resistance, or 5115 ohm s. As the load is reduced from 5115 to 3000 ohms, the m axim um input must be reduced in proportion, for exam ple, at 3000 ohm s the input voltage m ust not exceed 6000V. For loads less than 3000 ohm s, refer to voltage ratings specified in the table below.

Load 700 - 2995 ohms 150 - 655 ohms
40 - 145 ohms 5 - 35 ohms

Maxim um peak input 5000V 4000V 2000V 1000V

REFER TO USER MANUAL FOR LOAD RATINGS
This warning label appears below and to the right of the ACTIVE and DISPERSIVE term inals of the variable resistive load. Maxim um power input to ACTIVE and DISPERSIVE term inals depends on the resistance of the load and the duty cycle of the input. Refer to the specifications of section 1.1.8 in this manual.
CAUTION: Electrical Shock Hazard, Refer Servicing to Qualified Personnel CAUTION: Consult Accompanying Documents
These warnings appear on the serial num ber label of vPad-ESU. vPad-ESU contains hazardous electrical voltages internally which W ILL BE present when the covers are removed. The operator should read the Operating Manual to determ ine what actions to take in the event of failure of vPad-ESU. Refer to the Troubleshooting and Maintenance Section of the Operating Manual.

Definitions # Page ix

vPad-ESU OPERATORS MANUAL
W ARNING: OPENING THE vPad-ESU MAY COMPROMISE USER SAFETY. REFER SERVICING TO DATREND AUTHORIZED AGENT. vPad-ESU is a com plex instrum ent which contains internally distributed line voltages. Failure to observe appropriate m easures when the instrum ent has been opened, or failure to reassem ble correctly m ay com prom ise the safety of the user. W ARNING: GROUNDING CIRCUIT CONTINUITY IS VITAL FOR SAFE OPERATION. NEVER OPERATE THE vPad-ESU W ITH GROUNDING CONDUCTOR DISCONNECTED. Proper grounding is essential to ensure operator safety. Do not bypass the grounding provisions inherent in the design of vPad-ESU, otherwise, the operator m ay be subjected to an electrical shock risk. W ARNING: HAZARDOUS VOLTAGES OR CONDITIONS MAY EXIST DURING TESTS. CONSULT THE ACCOMPANYING DOCUMENTS FOR APPROPRIATE PRECAUTIONS. W hile testing an electrosurgical generator, high voltage may be present at the generator's output terminals which will thus be applied to test leads and term inals of vPad-ESU. In particular, the user m ay be exposed to a potential hazard of burns or electric shock from unterminated test leads which are required in testing of HF leakage. Follow testing instructions in this manual and as displayed by vPad-ESU, and exercise due care in operation of the generator under test. Refer to accompanying documents of the electrosurgical generator and follow all manufacturer's instructions, cautions and warnings in use and testing of the generator.
Definitions # Page x

vPad-ESU OPERATORS MANUAL
1 Specifications
Equipment Performance Specifications
1.1 Instrument Specifications
1.1.1 Power Measurement Range..................................................... 0 - 999.9 W (derived from current) Accuracy .............................................. ±(3 % of reading + 0.5W)
1.1.2 RMS Current Measurement Range..................................................... 0 to 5000 mA (internal load bank) 0 to 8500 mA (externally-connected load) Accuracy .............................................. ±(1 % of reading + 5 mA)
1.1.3 RMS Voltage Measurement Range.................................................... 0 - 999.9 V (derived from current) Accuracy ............................................. ±(1 % of reading + 1V)
1.1.4 Peak Voltage Measurement Range.................................................... 0 - 9999 V Accuracy ............................................. ±(1 % of reading + 10V)
1.1.5 Crest Factor Measurement Range.................................................... 1.0 - 999.9 Method................................................. Peak/RMS ratio, calculated using the larger of +/- peak values
Specifications/Chapter 1 # Page 1

vPad-ESU OPERATORS MANUAL

1.1.6 Instrument Bandwidth (-3dB)

250 Hz - 12 MHz

1.1.7 Isolation, Earth to Measuring Device

10 kV

1.1.8 Variable Load

Range..................................................... 0 - 5115 ohms

Resolution............................................. 5 ohms

Accuracy ............................................... ±1 % +0.5, -0 ohms

Power, 50% duty cycle........................ 200W @ 5 ohms

(20 sec on; 20 sec off)

400W @ 10 ohms

600W @ 20 ohms

600W @ 40 ohms

600W @ 80 ohms

600W @ 160 ohms

600W @ 320 ohms

600W @ 640 ohms

530W @ 1280 ohms

260W @ 2560 ohms

1.1.9 RF Leakage Loads

Resistance........................................... 2 x 200 ohms Accuracy ............................................ ±1 % Power, 100% duty cycle................... 16W

1.1.10 REM/CQM Test Resistance

Range.................................................. 0 - 1023 ohms Resolution.......................................... 1 ohm Accuracy ............................................ ±1 % +1, -0 ohms

1.1.11 Footswitch Control

Outputs.............................................. CUT, COAG and BIPOLAR Contacts............................................. N.O. SPST, 125VAC 0.5A

Specifications/Chapter 1 # Page 2

vPad-ESU OPERATORS MANUAL
1.1.12 Operational Duty Cycle Up to 100% in manually activated tests, 50% in automated footswitch activation, from 1 to 20 seconds
1.1.13 HF Digital Oscilloscope Vertical ranges................................... 0.125, 0.25, 0.75, 1.5, or 3A / division Vertical range relection.................... Manual or Automatic Horizontal ranges............................. 1.25, 2.5, 5, 10, 20 or 40 ìsec / division Trigger level....................................... Adjustable, +/- edge
1.1.14 HF Spectrum Analyzer Vertical ranges.................................. Normalized dB or linear Horizontal ranges............................. 62.5, 125, 250, 500, 1000, 2000 kHz / division Frequency resolution........................ 1.22, 2.44, 4.88, 9.77, 19.5, 39.1 kHz
1.1.15 Current Monitor Output Sensitivity............................................ 0.1V/A into 1 Megohm Bandwidth (-3dB).............................. 250 Hz - 12 MHz Accuracy.............................................. ±2%
Specifications/Chapter 1 # Page 3

vPad-ESU OPERATORS MANUAL
1.2 Measurement Terminals
All measurement terminals are rated Measurement Category I (CAT I): not suitable for direct connection to AC mains supply
1.2.1 ACTIVE and DISPERSIVE Maximum Voltage.............................. Flashover voltage depends on load resistance setting, as follows: 10 kV peak instantaneous at 5115 ohm 5 kV for loads of 700 to 2995 ohms 4 kV for loads of 150 to 655 ohms 2 kV for loads of 40 to 145 ohms 1 kV for loads of 5 to 35 ohms Maximum Current............................. 5 A RMS
1.2.2 mA Maximum Voltage............................. N/A (terminals short-circuited) Maximum Current............................. 8.5 A RMS
1.2.3 HF LEAKAGE Maximum Voltage............................. 56 V RMS Maximum Current............................. 0.28 A RMS
1.2.4 REM (CQM) Maximum Voltage............................. 16 V Maximum Current............................. 0.03 A
1.2.5 FOOTSWITCH OUTPUT Maximum Voltage............................. 125 VAC Maximum Current............................. 0.5 A
Connect measurement terminals ONLY as instructed in this manual. See Chapter 4, Operation
Specifications/Chapter 1 # Page 4

vPad-ESU OPERATORS MANUAL
1.3 User Interface
Display ............................................................ 10.1" colour LCD (minimum 1280 x 800 resolution) User Controls ................................................. Capacitive touchscreen Wired Connectivity ........................................ ìUSB 2.0 Device (shared with base unit)
ìUSB 2.0 Host XBUS Interface (RJ11-6) Wireless Connectivity ................................... 802.11 b/g/n Bluetooth 2.1+ EDR Memory, Internal ............................................ 16GB Maximum  Memory, Expansion ....................................... 16GB to 32GB Micro SD Card (optional) Modes of Operation ....................................... Manual (standard) Automatic (accessory option)
16 GB is the maximum amount of internal memory installed in the tablet. The internal memory is formatted similar to a hard disk to facilitate storage and access to data including the Operating System, Programs, and Data. The formatting process reduces that amount of storage available for use by the tablet. Additionally, the Operating System can consume up to 4 GB of storage. The nominal internal storage available for users is approximately 12 GB as shipped from Datrend. If additional storage is required, an SD card can be installed in the tablet. Upon initial installation of an SD card, check for proper operation and that the correct size is reported. It may be necessary to format your SD card. If so, ensure that the card is formatted for the FAT32 file system, and that the long format mode is used (do NOT use "quick format").
Specifications/Chapter 1 # Page 5

vPad-ESU OPERATORS MANUAL
Equipment Technical Specifications
1.4 Electrical Ratings
120 Volt power outlet .................................... 90 to 132 V ac rms, 47 to 63 Hz, 0.6 A max. 230 Volt power outlet .................................... 180 to 264 V ac rms, 47 to 63 Hz, 0.4 A max.
1.5 Fuses
Internal, not replaceable by user
1.6 Environment for Use
15 to 40 EC 10% to 90% RH Altitude: 2000m max. Indoor use only Pollution Degree 2
1.7 Dimensions
Base unit ......................................................... 8.5 x 11 x 13 in. (22 x 28 x 33 cm) Tablet PC (detachable) ................................. 10.5 x 6.7 x 0.5 in. (27 x 17 x 1.3 cm)
1.8 Weight
18 lb (8.2 kg)
Specifications/Chapter 1 # Page 6

vPad-ESU OPERATORS MANUAL

1.9 Standard Accessories

Power Cord (country specific) North America.................................................. Continental Europe.......................................... United Kingdom............................................... Australia..............................................................

P/N 3000-471 P/N 3000-006 P/N 3000-004 P/N 3000-005

Shorting Jumper (3 supplied)..................................... P/N 3220-600 ESU REM Test Cable, with pin................................... P/N 7200-570 Dispersive HF Test Lead, 30", without pin............. P/N 7200-572 Test lead, 30", Red, with 2 retractable sleeves.......... P/N 7200-574 Test lead, 30", Black, with 2 retractable sleeves....... P/N 7200-575 HF Leakage Jumper........................................................ P/N 7200-582 Kit, Banana Test Lead (green) w. Crocodile Clip..... P/N 7500-430

1.10 Optional Accessories
For a complete list of available accessories, visit www.datrend.com or contact Datrend Customer Service (see Chapter 5 for contact details)

1.11 Compliance With Standards
vPad-ESU is in compliance with these safety standards:
CAN/CSA-C22.2 No. 61010-1-(2nd Edition) - Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory Use, Part 1: General Requirements
UL Std. No. 61010-1 (2nd Edition) - Safety Requirements for Electrical Equipment for Measurement, Control, and Laboratory Use - Part 1: General Requirements
Following manufacture, all units are subjected to, and have passed the requirements of the `Routine Tests' defined in Annex F of the above Standard(s).

Specifications/Chapter 1 # Page 7

vPad-ESU OPERATORS MANUAL
Specifications/Chapter 1 # Page 8

vPad-ESU OPERATORS MANUAL
2 Overview
vPad-ESU is a test instrument intended for measuring the output of electrosurgical generators, also known as electrosurgical units or "ESU's". Tests performed by vPad-ESU are based on measurement of high-frequency current delivered by the ESU to a preset load resistance. vPad-ESU comprises an RF Analyzer unit (right), and an Android tablet which provides a user interface by means of the vPad-ESUTM software or "app" installed on the tablet.
Fig ure 1
2.1 RF Analyzer
The RF Analyzer unit incorporates a high-powered load which is comprised of banks of ceramic power resistors. High-voltage RF relays are used to switch the resistor banks in and out, allowing the load to be varied from zero to 5115 ohms in 5 ohm steps. Two 90mm fans provide forced-air cooling of the load, enabling it to withstand inputs of 400W at 100% duty cycle for standard test loads of 100, 300 or 500 ohms. In addition to the variable test load, the RF Analyzer provides two low-powered, fixed loads which are used in measuring high-frequency leakage from the ESU under test. A variable resistance which can be set from zero to 1023 ohms in one-ohm steps is used in testing the Return Electrode Monitor (REM) or Contact Quality Monitor (CQM) of the ESU. A footswitch control output provides relay contacts to independently
Overview/Chapter 2 # Page 9

vPad-ESU OPERATORS MANUAL
activate "cut", "coag" and "bipolar" control inputs of the ESU, enabling various tests to be performed automatically under the control of the Android tablet.
In HF testing, a toroidal current transformer in the RF Analyzer senses high-frequency current in the load and produces a proportional signal which is conveyed to the Analyzer electronics. The electronics include a digital signal processor (DSP) which captures and analyzes the ESU signal in realtime. Periodically, the DSP sends data to the Android tablet where measurements of current, voltage and power are displayed by the vPad-ESU app.
2.2 vPad-ESUTM App
The vPad-ESU application software or "app" on the tablet enables biomedical engineering technicians to perform tests of ESU power output, HF leakage and REM/CQM alarm operation. Measurements obtained during manual testing may be saved ad-hoc, leading to creation of a test report document which may then be saved on the tablet. Alternatively, the vPad-ESU app provides automated testing of ESU's in the form of Power Curves and AutoSequences.
A Power Curve or "power distribution" is a test in which the ESU power is measured over a range of specified loads. A power distribution may by measured automatically, in which case the ESU under test is switched on and off by vPad-ESU via a footswitch control cable. A power distribution can also be measured semi-automatically, in which case the technician is prompted by vPad-ESU to activate the ESU by means of a footpedal or handswitch. During the test, results are tabulated and plotted on a graph of power versus resistance. Users may configure loads used in a test and timing associated with each power measurement. The setup for a Power Curve can also include pass/fail criteria in the form of upper limit and lower limit curves provided by the manufacturer or created by the user. Several examples of Power Curve setups are installed with the vPad-ESU app.
AutoSequences are automated sequences of measurements which can be integrated with user instructions, diagrams and an inspection checklist. vPad-ESU AutoSequences are ideally suited to preventive maintenance ("PM") inspection of ESUs in accordance with manufacturer specifications. An AutoSequence can guide a technician step-by-step through a PM inspection while automatically recording results to obtain a PM record or test report document on completion of the sequence. Automation of the PM procedure enables a PM to be completed more quickly and accurately, and with less prior experience or specific training on the part of the technician. Example AutoSequences installed with the vPad-ESU app enable technicians to perform PM inspections of major makes and models. vPad-ESU enables users to program their own AutoSequences to incorporate instructions, schematics, performance and safety measurements as specified in a manufacturer's service manual or in a PM procedure developed by their organization.
This manual provides instructions for setup and operation of vPad-ESU. Additional instructions may be found in "Help" menus and schematic diagrams of the vPad-ESU app. Further information on operation, setup and programming may be obtained by contacting Datrend Customer Service; see Chapter 5 in this manual for contact information.
Overview/Chapter 2 # Page 10

vPad-ESU OPERATORS MANUAL
3 Setup
Place the RF Analyzer unit on a strong, stable bench or table. To release the Android tablet from the RF Analyzer, push the top edge of the tablet straight down to compress the retaining tray which is below the tablet. Once the tablet has cleared the retaining arms at the top of the RF Analyzer, rotate the tablet toward you and remove it. Extend the stand on the rear of the tablet "boot" and place the tablet beside the Analyzer, either on its left or right side according to convenience.
Fig ure 2 As HF test leads must not be allowed to drape over the tablet screen, the tablet is usually placed to the side of the RF Analyzer which is opposite the electrosurgical generator under test.
Setup/Chapter 3 # Page 11

vPad-ESU OPERATORS MANUAL
Use the micro-USB cable (P/N 3140-478) provided with vPad-ESU to connect the port labelled "USB" on the tablet to the USB jack on the RF Analyzer. Do not connect the USB cable to the tablet port labelled "HOST"; this port is for connection of optional external devices such as USB flash drive, barcode scanner, keyboard and so on. The micro-USB to USB Type A adaptor provided with the tablet connects to the "HOST" port when needed for interface with an external device. Note that tablets are constantly evolving and the power and USB location(s) may change over time. If in doubt, consult your local Datrend representative or contact technical service on the Datrend website www.datrend.com .
Fig ure 3
Use the 5V power cable (P/N 3140-477) provided with vPad-ESU to connect the power jack on the tablet to the power jack on the RF Analyzer. Note there are different plugs on each end of this cable; the smaller plug connects to the tablet and the larger to the RF Analyzer. Use the line cord provided with vPad-ESU to connect the RF Analyzer to the AC mains supply. The receptacle for the line cord is located on the right side of the Analyzer. Use the ON/OFF switch located beside the line cord receptacle to power up the RF Analyzer. The power indicator on the front of the Analyzer should illuminate green, and the fans located on the left of the unit should begin to run at relatively low speed. Power up the tablet by pressing and holding the tablet's ON/OFF button, which is located immediately to the right of the power jack. Hold the button down until the tablet starts up, then release. After startup, the tablet should display the manufacturer logo and then, after a few seconds, the Android HOME screen.
Setup/Chapter 3 # Page 12

vPad-ESU OPERATORS MANUAL
Switch the tablet OFF when vPad-ESU is not in use. Press and hold the ON/OFF button until a confirmation message appears on the tablet screen. Select the appropriate response to complete the Power Off sequence. Note: Pressing and releasing the Power ON/OFF button momentarily will put the tablet in a `sleep'
mode. Press the ON/OFF button momentarily again to `wake' the tablet. This is NOT the same as OFF. To store or transport vPad-ESU, reverse the setup procedure. Note that the unit is moved or shipped with the tablet placed in the retaining tray at the front of the RF Analyzer such that the screen faces inward to the Analyzer.
Setup/Chapter 3 # Page 13

vPad-ESU OPERATORS MANUAL
Setup/Chapter 3 # Page 14

vPad-ESU OPERATORS MANUAL
4 Operation
This chapter explains how to use vPad-ESU to perform ESU testing. Test Record management is also covered in this chapter.
4.1 HOME Screen
The Android HOME screen is displayed approximately 20 seconds after switching the tablet ON.
Fig ure 4
Operation/Chapter 4 # Page 15

vPad-ESU OPERATORS MANUAL
Initiate actions on the tablet by pressing the corresponding icon or button. For example:
Press to launch the vPad-ESU application software, or "ap p ". Use this app to perform ESU testing.
Press to launch the vPad Record Manager app. Use this app to copy, print, convert or delete Test Records saved by vPad-ESU. This app can be launched from the HOME screen, or from within vPad-ESU by pressing the "Test Records" button.
Press to access Settings. Use this menu to configure sound, display, touchscreen, and wireless setup.
By default, vPad-ESU is supplied with both WiFi and Bluetooth connectivity d is ab le d . Use the Settings menu to enable wireless connectivity, in accordance with policies of your institution or organization.
At bottom center on the screen, press the Apps button to access more apps which are installed on the tablet. (Note: Android OS icons may change over time as the OS evolves)
At bottom left on the screen, press the Home button to return from an app to the Home screen. (Note: Android OS icons may change over time as the OS evolves)
At bottom left, press the Back button to navigate back one step, from the app or screen currently being displayed, to a previous one. For some apps, this button's function may be disabled. (Note: Android OS icons may change over time as the OS evolves)
At bottom left, press the Recents button to jump from the current app to a different app that was started earlier, but is currently on pause. (Note: Android OS icons may change over time as the OS evolves)
For more information on how to use the Android tablet, refer to the tablet operator manual supplied with vPad-ESU.
Operation/Chapter 4 # Page 16

vPad-ESU OPERATORS MANUAL
4.2 Startup
Press the vPad-ESU icon on the Android HOME screen to start the app. A splash screen will display the product name and the software version. The app will then connect to the RF Analyzer via USB, or alternatively by Bluetooth if wireless operation has been enabled under the app's Setup menu.
Fig ure 5 If the app is unable to connect to the RF Analyzer, a pop up menu is displayed with alternative connection options. You may attempt to retry connecting by the same or a different method.
Fig ure 6
Operation/Chapter 4 # Page 17

vPad-ESU OPERATORS MANUAL
If a connection is successfully made, the app will command the RF Analyzer to perform self-tests of the Digital Signal Processor (DSP) and fans. If a test fails, an alarm message is displayed and the app exits. If all self-tests pass, the main menu of the app is shown.
4.3 Main Menu
The main menu of the app is the starting point for navigation to manual tests (HF Output; HF Leakage; and REM (CQM) Test), automated tests (AutoSequences and Power Curves), and app settings.
Fig ure 7 The "Operator's Manual" button launches Acrobat Reader, passing the operator manual PDF to the Reader. If Acrobat Reader or this operator manual (MN-110) is not installed on the tablet, an error dialog is displayed. The "Test Records" button launches vPad Record Manager, passing the file folder path for vPad-ESU to the manager. See section 4.13 for more information on Record Manager.
Operation/Chapter 4 # Page 18

vPad-ESU OPERATORS MANUAL
4.4 Setup Menu
Application settings and user preferences are configured via the "Setup" menu. To view or change the application settings, press the "Setup" button on the main menu of the app.
Fig ure 8 4.4.1 Report Title The "Test Report Title" on the Setup menu is inserted, center-justified, at the start of each Test Record file. Change this title to the name of your hospital or organization, if desired. 4.4.2 List Editor The "Edit List" button of the Setup menu displays a pop-up that allows the user to select one of the list files for editing. A "list" is a list of items which the user may select from to streamline input of certain types of information during a test, for example, ESU make and model, hospital locations, ESU waveforms and resistance values which are used in testing the REM/CQM function of the ESU.
Operation/Chapter 4 # Page 19

vPad-ESU OPERATORS MANUAL
Fig ure 9 To edit the list of ESU manufacturers and models, press "Edit List" and then select "Makes/Models". This will display the ESU manufacturer and model list in an editor dialog. As noted at the top of this dialog, when editing or adding new ESU's you must place a semicolon between the make and model on each line. During a test, the ESU pick list is presented in the order shown; therefore, you may prefer to delete irrelevant models from the list and reorganize it with most frequently-selected items first.
Fig u re 10 Select one of the other radio buttons to view or modify one of the other lists. For example, the figure below shows the ESU waveform list in the editor dialog. During a test, the list of waveforms is presented in the order shown; therefore, you may prefer to delete irrelevant waveforms from the list and reorganize it with most frequently-selected items first.
Operation/Chapter 4 # Page 20

vPad-ESU OPERATORS MANUAL
Fig u re 11 Press the "Exit" button to close the list editor without making changes to the file. Press the "Save and Exit" button to update and then return to the Setup menu. 4.4.3 AutoSequence Editor To make changes to an AutoSequence, press the "Edit AutoSequences" button on the Setup menu. This will display the AutoSequence selector menu.
Fig u re 12 Press a row of the list to select the corresponding AutoSequence file and pass it to a text editor app. When this is done for the first time, you will be prompted to select an app to open the file with. The user can choose to use the selected editor one time only or always.
Operation/Chapter 4 # Page 21

vPad-ESU OPERATORS MANUAL
Fig u re 13 AutoSequences are script-based programs which are written in the vPad "RFA" language. Refer to the RFA Programmer's Guide for vPad-ESU for information on creating automated test sequences and preventive maintenance inspection procedures for vPad-ESU.
Operation/Chapter 4 # Page 22

vPad-ESU OPERATORS MANUAL
4.4.4 Power Curve Test Editor To modify a Power Curve test or create a new one, press the "Edit Power Curve" button on the Setup menu. This will display a selector for Power Curve tests. Choose the test you wish to view or change to open it in an editor UI.
Fig u re 14 When a row of the selector is pressed, the corresponding ".pc" file for the test is passed to the power curve editor UI. The UI provides controls for editing the parameters of the power curve test setup.
Fig u re 15
Operation/Chapter 4 # Page 23

vPad-ESU OPERATORS MANUAL
The name of the power curve test, which is the same as its filename on the tablet, is displayed as the "Test Title" at the top of the editor UI. This field cannot be edited. To create a new power curve test, press the "Save As New" button of the editor. You will then be prompted to enter a filename for the new power curve file.
Except for the loads used during the test, the power curve settings are self-explanatory. The setup includes choices for ESU output under test (CUT; COAG; or Bipolar), method of ESU activation (automatic via footswitch control, or semi-automatic based on prompting the user to activate the ESU by footpedal or handswitch); and the ESU on/off duty cycle. Waveform and power settings are used when displaying setup instructions to the user on initiation of the test.
Test loads of the power curve setup are specified with a CSV format. Loads may be specified individually as a simple list, for example: 50,100,200,500,1000 (ohms). Loads may be specified as a range with an implicit step interval equal to one-tenth of the range, for example: 100-1000 means 100 to 1000 ohms in steps of 100 ohms (10 readings). Loads may be specified as a range with an explicit step interval, for example, 200-1000/200 means 200 to 1000 ohms in steps of 200 ohms (5 readings). Loads may also be specified using any combination of these methods, and do not need to be listed in ascending order. For example: 50,1500-5000/500,100-1000,10 will cause power measurements to be acquired for loads of 10, 50, 100, 200, 300... 900, 1000, 1500, 2000... 4500 and 5000 ohms (20 readings). When the test is executed, the load list is read, parsed and sorted in ascending order. The loads are quantized down to the nearest 5 ohms to suit the resolution of the variable load in the RF Analyzer.
A power curve test can optionally provide for automatic pass/fail of results based on a list of upper and lower power limits in a CSV-formatted text file. The limits filename is arbitrary but is typically chosen to describe the power curve. As a convention, the filename should be given a CSV extension. Each line in the CSV file specifies a load and the minimum and maximum power levels which are acceptable for this load. An example of a power curve limits file follows:
50,35.2,52.8 100,97.6,146.4 200,168.8,253.2 300,240,360 400,227.2,340.8 500,166.4,249.6 600,129.6,194.4 700,103.2,154.8 800,72.8,109.2 900,62.4,93.6 1000,55.2,82.8
In the above example, for a 50 ohm load the output of the ESU must fall between 35.2 and 52.8 watts for the power measurement to be assigned a "pass". Pass/fail specifications for loads of 100, 200, 300... ohms are expressed similarly, up to the highest load of the test (1000 ohms) for which the measured power must range from 55.2 to 82.8 watts to be assigned a "pass".
Operation/Chapter 4 # Page 24

vPad-ESU OPERATORS MANUAL
Such limits may be derived from power curve diagrams which are provided in the operator manual of a ESU. This can be done by assigning a tolerance (e.g. ±20%) to the nominal power read from the curve for a given load. Alternatively, a manufacturer may provide power curve specifications which include tolerance information. If limits have been specified in a power curve test, the limits are referenced at the end of the test after all measurements have been completed. The list of limits is searched to find loads which match the loads in the acquired test data. If a match is found, the measured power for that load is compared to the specified limits. If all such comparisons are within range, the test is automatically assigned a "PASS" or otherwise a "FAIL". Specification of limits in a power curve test is optional. If no limits have been specified in the setup, the user will assign the final test result manually, by means of PASS/FAIL buttons which are displayed below the results on completion of the test.
Operation/Chapter 4 # Page 25

vPad-ESU OPERATORS MANUAL
4.5 HF Output Test
The HF Output test is used primarily for measurement of RMS current and power delivered to a set load by the ESU under test. 4.5.1 HF Test Setup Start a HF Output test by pressing the "HF Output" button on the main menu of the app.
Fig u re 16 The HF Output test begins by displaying the test setup.
Fig u re 17
Operation/Chapter 4 # Page 26

vPad-ESU OPERATORS MANUAL
The displayed schematic shows how to connect the device under test or "DUT" to the RF Analyzer. Different schematics are shown depending on the buttons selected (monopolar or bipolar ESU output; and internal load, external load, or combination internal plus external load). Prior to starting the test, connect the ESU to the RF Analyzer as shown in the schematic. Test leads shown are included with vPad-ESU. Note the dispersive HF test lead without pin (P/N 7200-572) is used to connect the neutral or return port of the DUT to the current monitor of vPad-ESU. The shorting jumper shown in the schematic is P/N 3220-600, and the red jumper lead is P/N 7200-574. Optionally, vPad-ESU may be set up to activate and deactivate the ESU remotely from the tablet. To do so, connect the appropriate footswitch control cable between the FOOTSWITCH OUTPUT jack of the RF Analyzer and the footswitch control inputs of the ESU. Available as accessories for vPad-ESU, footswitch control cables can be obtained for Covidien/Valleylab ForceTriad (P/N 7200-557), Covidien/Valleylab Force FX (P/N 7200-559), ConMed System 5000 (P/N 7200-558) as well as other makes and models.
Fig u re 18
Press the "Help" button on the menu to view instructions on setup and operation of the HF Output test. Press the "Footswitch Setup" button to configure automatic control of the ESU via a footswitch cable such as the one illustrated in the schematic above. More details on footswitch setup and control are provided in a discussion of the HF Output menu to follow. To change the load resistance for the test, press the "HF Load" text box and input the value via the Android soft keyboard. To make the entered value a startup default, check the "Save as default" box. The new default will then be stored when the "Start Test" button is pressed.
Operation/Chapter 4 # Page 27

vPad-ESU OPERATORS MANUAL
4.5.2 Test Warning Once all required connections to the DUT have been made, press the "Start Test" button on the HF Test Setup menu to begin testing. The first time this button is pressed, you will see a "KEEP LEADS AWAY..." warning.
Fig u re 19 Once shown, this warning is never displayed again as long as the app is not exited. The warning is displayed one time only, each time the app is run. Regardless of whether or not you see this warning at the start of a test, always follow this instruction when using vPad-ESU. Test leads which are conducting high-power, high-frequency energy can cause the touchscreen to behave erratically if such leads are draped over the tablet, or brought close to it.
Operation/Chapter 4 # Page 28

vPad-ESU OPERATORS MANUAL
4.5.3 Continuous Monitoring of HF Output On starting a HF Output test, readouts of power, current and voltage are displayed. Provided no ESU signal is present when the test is started, the load will then be set to the resistance specified on the HF Test Setup screen.
Fig u re 20 If an ESU signal is present when the HF Output menu is entered, the app will not set the load. This is a protective measure to prevent damage or unnecessary wear of the control relays in the load array. If ESU activity is detected at test startup, an alarm message will be displayed instructing you to switch the ESU off. Deactivate the ESU, then press "Continue" on the alarm dialog to dismiss it and proceed with the test. When the app is in the state shown above, the RF Analyzer is continuously monitoring for an ESU signal. Measurements of power, current, voltage and crest factor are displayed when a signal is detected. In this mode, vPad-ESU acts similarly to a True RMS instrument which provides continuous monitoring of ESU output as long as the input signal is detected. Forced air cooling of the load is automatic and self-adjusts according to the power measured. At higher power levels, operational duty cycle restrictions should be observed (see section 1.1.8 for load power ratings).
Operation/Chapter 4 # Page 29

vPad-ESU OPERATORS MANUAL
Fig u re 21 While measurements are being displayed, they can be saved to a test data buffer and thereby a record of the measurements can be created. This may be done by pressing the "Save Data" button while readouts are active. Data recording may also be accomplished automatically by having vPad-ESU control the ESU, or semi-automatically when activating the ESU by means of a footpedal or handswitched "test pencil". Refer to sections 4.5.8, 4.5.9 and 4.5.10 which follow for more details. 4.5.4 Changing the Load Press the "Test Setup" button on the HF Output menu to display the HF Test Setup menu, described earlier. Reasons for entering the setup menu are to refer to the schematic, and to change the load resistance. Note the current setting of the load is displayed above the "Test Setup" button. The ESU must be deactivated when leaving the Setup menu to return to HF Output measurement; if it is not, the load will not be set and an alarm dialog will be displayed as described in the previous section.
Operation/Chapter 4 # Page 30

vPad-ESU OPERATORS MANUAL
4.5.5 Analyzer Setup Press the "Analyzer Setup" button to display a menu for configuring the Digital Signal Processor (DSP) of the RF Analyzer.

Fig u re 22

"Measurement Range" of the Analyzer may be set to ±0.5, 1, 3, 6 or 12 amperes full scale, or to "Autoranging". The factory default is Auto-ranging and should be left at this setting unless greater stability of the measurement is desired, which can be achieved through appropriate selection of one of the fixed ranges.

"Signal averaging" is the amount of time the DSP spends accumulating and analyzing signal data for calculation of RMS and peak values. Options for this setting are:

· Normal

RMS value is calculated by the DSP over 560 milliseconds; in this mode, vPad-ESU emulates the response of an analog test instrument such as a RF millivoltmeter

· Slow

RMS value is calculated over 1680 milliseconds; in this mode, vPad-ESU emulates the response of a thermal power meter such as a RF bolometer

The factory default setting for "Signal Averaging" is "Normal", and this should be used in most test situations. The "Slow" setting may be helpful for improving stability of measurements for ESU signals that are amplitude-modulated at frequencies in the 100 to 1000 Hz range.

Referring to Fig u re 22, "Trigger level" is the signal threshold above/below which the DSP is triggered and begins to capture data for analysis. It is represented as a percentage of the full-scale of the selected range.

Operation/Chapter 4 # Page 31

vPad-ESU OPERATORS MANUAL
The factory default is 5%. If set higher than 5%, vPad-ESU may not measure if the ESU power output is small. "Trigger edge" sets the triggering polarity to rising or falling edge of the ESU signal. The factory default is rising edge. This feature is provided mostly for the benefit of the HF digital oscilloscope, described in the following section. Analyzer settings may be changed and then applied via the "Apply" button. These changes will be temporary and will be reset to previously-set defaults if the HF Output test is exited. To save current settings as the defaults, check the "Save as default setup" box then press the "Apply" button.
4.5.6 HF Digital Oscilloscope The HF Output test includes an HF digital oscilloscope function which is entered by means of the "Scope" button on the menu.
Fig u re 23 In oscilloscope mode, each time the RF Analyzer is triggered by an ESU signal, a waveform is recorded by the Digital Signal Processor (DSP) for a duration of 0.0125 to 0.4 milliseconds, depending on the choice of horizontal scale. Concurrently with and subsequent to acquisition of the waveform sample, the DSP accumulates and analyzes ESU signal data for RMS and peak value measurements over a much longer interval, nominally equal to 560 milliseconds when the Analyzer's signal averaging is set to "Normal". The waveform sample captured by the DSP is shown on the scope with vertical scale set according to the measurement range in use (0.5, 1, 3, 6 or 12 amps). The waveform is plotted in a chart at the left of the screen, with corresponding "meter" values (power, RMS current and voltage) indicated to the right of the chart.
Operation/Chapter 4 # Page 32

vPad-ESU OPERATORS MANUAL
The horizontal span of the scope depends on the range chosen by the user under "Analyzer Setup". This may be set to 1.25, 2.5, 5, 10, 20 or 40 microseconds per division respectively. The choice of horizontal scale corresponds to a sampling rate used by the DSP to record the waveform. This variable sampling rate is used for waveform capture only; measurement of RMS and peak value over the "Signal averaging" time is always performed at the maximum sampling rate of the Analyzer.
Fig u re 24 A "Scope: TRIGGERED" message is used to represent presence of an input signal. Failure to receive a trigger within a set timeout causes the "Scope: TRIGGERED" message to change to "Scope: on hold" and the last recorded waveform to be redrawn in a different colour. In this way, the app emulates a normally-triggered oscilloscope.
Fig u re 25
Operation/Chapter 4 # Page 33

vPad-ESU OPERATORS MANUAL
When the oscilloscope is placed "on hold", power, current and voltage measurements are blanked as interruption of the input signal during the RMS averaging time usually results in readings that do not correspond to the waveform seen within the first 0.0125 to 0.4 msec following the trigger. In oscilloscope mode, button functions at the bottom of the HF Output menu remain the same as when meters are being displayed. An exception is the "Scope" button which is re-labelled "Meter", which if pressed hides the oscilloscope and restores the RMS current and power meters. Oscilloscope displays may be saved on the tablet as PNG image files and then tied to a Test Record of the corresponding test results. Refer to section 4.5.9 for further details. 4.5.7 HF Spectrum Analyzer In oscilloscope mode, the frequency spectrum of the input signal may be observed by checking the "Spectrum" box.
Fig u re 26 In "spectrum mode", each time waveform data is received from the DSP it is further processed by the app and the result is plotted on the chart. Therefore, the spectrum follows the input signal in realtime. When the ESU is deactivated, the spectrum display is placed "on hold" as previously described for the oscilloscope.
Operation/Chapter 4 # Page 34

vPad-ESU OPERATORS MANUAL

vPad-ESU derives the spectrum by Fast Fourier Transform (FFT) of the captured waveform. The magnitude of the spectrum is obtained and then normalized to the peak value before plotting on a linear or "dB" vertical scale. The resulting display is useful for checking harmonic distortion in the ESU output as well as relative levels of sidebands and spurious signals.
The horizontal span of the spectrum and the frequency resolution are directly related to the horizontal scale of the oscilloscope as selected under "Analyzer Setup". These relationships are described by TABLE 4.5.7-1 following.

TABLE 4.5.7-1: Scope and Spectrum Analyzer Settings

Scope horizontal (ìsec/div)

Scope time span
(ìsec)

Spectrum horizontal (MHz/div)

Spectral range (MHz)

Spectral resolution
(kHz)

1.25

12.5

2

20

39.1

2.5

25

1

10

19.5

5

50

0.5

5

9.77

10

100

0.25

2.5

4.88

20

200

0.125

1.25

2.44

40

400

0.0625

0.625

1.22

Similar to oscilloscope displays, spectra may be saved on the tablet as PNG image files and then tied to a Test Record of the corresponding test results. Refer to section 4.5.9 for details.

Operation/Chapter 4 # Page 35

vPad-ESU OPERATORS MANUAL
4.5.8 Footswitch Setup Press the "Footswitch Setup" button to display a menu for configuring automatic or semi-automatic footswitch control of the ESU under test.
Fig u re 27 Radio buttons at the top of the menu select which of three ESU outputs will be activated when the "Footswitch ON" button of the HF Output test is pressed. As shown, CUT, COAG or Bipolar output of the ESU may be remotely activated by vPad-ESU. "Footswitch ON-time" is the length of time the ESU is activated, in seconds. It may be set between 1 and 20 seconds. The factory default setting for ON-time is 3 seconds. "Measurement delay" is a trigger hold-off delay between activating the ESU and enabling the DSP of the RF Analyzer to start measuring. This delay is intended to allow the ESU to stabilize before measurement of its output commences. Note the measurement delay is restricted to the following range:
0 <= Measurement delay <= (Footswitch ON-time - 500 msec) The factory default setting for measurement delay is 300 msec.
Operation/Chapter 4 # Page 36

vPad-ESU OPERATORS MANUAL
The "Manually-operated foot/handswitch" checkbox enables an alternative method of testing where, as opposed to being automatically controlled by the FOOTSWITCH OUTPUT port of vPad-ESU, the ESU is manually controlled by the technician using a footpedal, or alternatively a hand-operated switch such as a "test pencil". Settings on the "Footswitch setup" menu may be changed and then applied via the "Apply" button. These changes will be temporary and will be reset if the HF Output test is exited. To save current settings as the defaults, check the "Save as default setup" box then press the "Apply" button. Note that on return to the HF Output test, if the "Manually-operated..." checkbox is not checked, the ESU output under control and the ON-time are displayed above the "Footswitch Setup" button. If the "Manually-operated..." checkbox is checked, only the ON-time will appear above the "Footswitch Setup" button.
4.5.9 Automated Measurement with Data Recording To measure HF output automatically, press the "Footswitch ON" button to activate ESU CUT, COAG or Bipolar as indicated above the "Footswitch Setup" button. Provided an ESU is connected to vPad-ESU, measurements of power, current and voltage will be displayed during the footswitch "ON" time. While in progress, the measurement may be optionally aborted by pressing the "Footswitch OFF" button.
Fig u re 28 After the ESU has been activated, a timer above the "Footswitch ON/OFF" button counts down in seconds. When the timer reaches zero, the ESU is deactivated and the measurement results are forwarded to the "Save HF Test Result" dialog. After ESU deactivation, the "Footswitch ON/OFF" button will be locked out for duration equal to the ON-time, thereby maintaining a 50% operational duty cycle.
Operation/Chapter 4 # Page 37

vPad-ESU OPERATORS MANUAL
Fig u re 29 The "Save HF Test Result" dialog enables you to save the measurement results and thereby create a record of tests performed on the ESU. However, saving measurements while testing in this way is optional. If you do not wish to save the displayed measurements, simply press the "Cancel" button to dismiss the "Save..." dialog and return to testing. Optionally, measurement results can be saved with a corresponding description of the ESU waveform that produced them. To include a waveform description with the result, press the "Waveform" selector and choose an item from the displayed pick list.
Fig u re 30
Operation/Chapter 4 # Page 38

vPad-ESU OPERATORS MANUAL
For the "Test Result", select PASS, FAIL or INFO ONLY as appropriate, which will then enable the "Save" button on the dialog. Enter "Notes" if desired, then press "Save". Results saved to the test data buffer may be viewed using the "View Data" button on the HF Output menu.
If the HF Output test is set to oscilloscope mode, when the "Save HF Test Result" dialog appears the menu will include a "Save scope screenshot" checkbox. If this box is checked and the "Save" button then pressed, a PNG image of the oscilloscope screen is saved to a file with an auto-generated filename:
wfm_YYYYmmDD_hhMMss.png for waveforms fft_YYYYmmDD_hhMMss.png for spectra
The resulting PNG file is saved in a temporary folder on the tablet. If a Test Record is eventually saved, the temporary folder is renamed with the equipment ID or control number of the ESU under test. Images saved during tests of HF Output and other tests may be found in the vPad-ESU file folder on the tablet.
Test results saved to the data buffer may be viewed with the "View Data" button on the HF Output menu. A Test Record file of the results may be saved from the "View Data" menu if a control number has been entered via the "Equipment Information" menu. For further details, refer to sections 4.8 and 4.9 respectively.
4.5.10 Semi-Automated Measurement with Data Recording
Automated measurement and data recording requires a footswitch control cable to interface the FOOTSWITCH OUTPUT of vPad-ESU to footswitch control inputs of the ESU.
As an alternative, the ESU may be activated manually but the measurement result is recorded automatically after a predetermined ON-time. This alternative mode is enabled by selecting the "Manually-operated..." checkbox on the "Footswitch Setup" menu. With this option, the "Footswitch ON/OFF" button of the HF Output test will be greyed out.
When "Manually-operated..." of the "Footswitch Setup" is enabled and the HF Output menu restored, a pop-up message is displayed for a few seconds. The pop-up message displays "Activate CUT", "Activate COAG" or "Activate BIPOLAR", depending on the radio button selected on the "Footswitch Setup" menu. The first time this prompt appears, it is accompanied by a bell tone. On subsequent appearances, the popup is displayed silently.
Operation/Chapter 4 # Page 39

vPad-ESU OPERATORS MANUAL
Fig u re 31 When you see this prompt, activate the corresponding output of the ESU manually, using the ESU's footpedal control or a handswitched device such as a "test pencil". If and when an ESU signal is detected, a timer posted above the disabled "Footswitch ON" button is initialized with the ON-time specified on the "Footswitch Setup" menu. The timer then starts counting down to zero. When the timer reaches zero, a pop-up is displayed which says "Switch RF off!". The "off" message is always accompanied by an alert tone. As instructed, switch the ESU off immediately. As the "Switch RF off" prompt is being displayed, the measurement results are forwarded to the "Save HF Test Result" dialog as described in the previous section. Select a "Test Result" and save the measurement, or alternatively discard the data by pressing the "Cancel" button on the dialog.
Operation/Chapter 4 # Page 40

vPad-ESU OPERATORS MANUAL
4.6 HF Leakage Test
The HF Leakage test is used to measure high-frequency current or power from specific ESU output terminals to protective earth or "ground". Leakage measurements are compared to a maximum limit defined in a standard or by the ESU manufacturer. 4.6.1 HF Leakage Setup Start an HF Leakage test by pressing the "HF Leakage" button on the main menu of the app.
Fig u re 32 The HF Leakage test begins by displaying the test setup.
Fig u re 33
Operation/Chapter 4 # Page 41

vPad-ESU OPERATORS MANUAL
Use the "Previous Test" / "Next Test" buttons to select one of seven possible test configurations. Choose the test to suit the ESU characteristics (isolated or ground-referenced) and the generator output to be tested (monopolar or bipolar). ESU, test and load descriptions are shown on the left and a corresponding wiring diagram for the test is shown on the right. Below the wiring diagram is a reference to the 60601-2-2 standard which provides the testing specifications. As selected by "Previous / Next Test" buttons, the leakage tests are as follows:
Test #1: for isolated monopolar output, measuring HF current from the active terminal of the generator to earth through a 200-ohm load. Note jumper P/N 7200-582 is used in this test.
Test #2: for isolated monopolar output, measuring HF current from the dispersive or neutral terminal of the generator to earth through a 200-ohm load (rated 16 watts).
Test #3: for earth-referenced monopolar output, measuring HF current from the dispersive terminal of the generator to the earth while the generator drives a specified load connected between active and dispersive terminals.
Test #4: for earth-referenced monopolar output, measuring HF current from the dispersive terminal of the generator to the earth while the generator drives a specified load connected between the active terminal and earth.
Test #5: for isolated bipolar output, measuring HF current from bipolar output terminal #1 to the earth through a 200-ohm test load. In this test, the monopolar dispersive terminal of the generator is also connected to the earth through a load.
Test #6: for isolated bipolar output, measuring HF current from bipolar output terminal #2 to the earth through a 200-ohm test load. In this test, the monopolar dispersive terminal of the generator is also connected to the earth through a load.
Test #7: cross-coupling test, measuring HF current from an unused output of the ESU while a different, independent output is activated to deliver power to a specified load resistance. Note this test does not appear in the IEC60601-2-2 standard, but is required by certain manufacturers for specific ESU models.
Operation/Chapter 4 # Page 42

vPad-ESU OPERATORS MANUAL
WARNING: HIGH VOLTAGE
Some HF leakage tests may require connection of an unterminated lead to the DUT. Place the free end of the unterminated lead safely out of harm's way for the test. To avoid RF burns, exercise caution while testing is in progress. The use of automated footswitch control and data recording per section 4.5.9 is recommended for performance of HF leakage tests, unless the manufacturer's test instructions specify otherwise.
Tests #2 through #7 require a load to be specified. Enter the required value into the "DUT Load" box beneath the test description. The default load is 200 ohms, as specified in the IEC standard. A manufacturer may specify a different load depending on the model; consult ESU accompanying documents or the manufacturer's service manual for the generator if necessary.
Fig u re 34 Enter the pass/fail limit for leakage into the "Leakage Limit" box below the schematic. Initially, a default limit of 150 mA is set, which is the value specified in the IEC standard. You may choose either milliamps (mA) or watts (W) as the units of measure by means of radio buttons below the wiring diagram. Initially, the default units of measure is "mA" per the IEC standard. Alternatively, a manufacturer may specify the limit in watts; consult the service manual of the ESU for test specifications. The "Help" button displays detailed instructions for setup and use of the leakage test. These instructions should be consulted before and during the test. The "Footswitch Setup" configures footswitch control of the DUT; refer to section 4.5.8 for instructions. Once the appropriate test has been selected and the generator connected as shown in the diagram, press the "Start Test" button to run the test.
Operation/Chapter 4 # Page 43

vPad-ESU OPERATORS MANUAL
4.6.2 HF Leakage Measurement When the HF Leakage menu is entered, a meter which measures in milliamps or watts is shown, depending on the units of measure selected on the test setup menu. The HF load will be set to the specified resistance, if a DUT load is required to perform the test. If a load is used, fans are set to maximum accordingly. If a DUT load is not used, fans operate at a lower RPM.
Fig u re 35
If an ESU signal is detected when the HF Leakage test is entered, the app will not be able to set the load. In this case, an alarm dialog is displayed. Switch the ESU off, then press "Continue" to dismiss the dialog and proceed with the test. The "Analyzer Setup" button displays a menu for configuring the DSP of the RF Analyzer. This is the same menu as used in the HF Output test; see section 4.5.5 for instructions. The "Test Setup" button of the HF Leakage test displays the HF Leakage setup menu, described in the previous section. Return to the setup menu to refer to the schematic or to choose a different test configuration. On exiting the setup menu, the HF load will not be set if the ESU is running. The "Footswitch Setup" button displays a menu for configuring the footswitch control relays of the RF Analyzer. This is the same menu as used in the HF Output test; see section 4.5.8 for instructions. The "Footswitch ON" button activates the ESU output shown above the "Footswitch Setup" button. The operation of this button is the same as the "Footswitch ON/OFF" button of the HF Output test. Refer to sections 4.5.9 and 4.5.10 for details.
Operation/Chapter 4 # Page 44

vPad-ESU OPERATORS MANUAL
When HF leakage is detected, the value is displayed in the readout and is compared to the maximum limit specified in the test setup. Depending on the result, "PASS" or "FAIL" is then shown below the readout accordingly.
Fig u re 36 According to standards, the leakage value should never exceed 150 mA or 4.5W. The rating of the leakage test load is 16W, which corresponds to 283 mA. If a leakage measurement exceeds 245 mA or 12W, the test is stopped, an alarm dialog is displayed, and a repeating alarm tone is emitted. If this alarm is seen, switch the ESU off immediately and check the test connections. Once the problem has been corrected, press the "Continue" button on the alarm dialog to dismiss it and return to testing. Provided there is no leakage alarm, the user may press the "Save Data" button to copy the leakage reading to the "Save HF Leakage" menu. As described in section 4.5.9, optionally select the ESU waveform in use from the pick list, enter "Notes" if desired, and press the "Save" button to copy the leakage measurement to the test data buffer. There is no need to manually choose a pass or fail result since it is automatically assigned based on the limit.
Operation/Chapter 4 # Page 45

vPad-ESU OPERATORS MANUAL
Fig u re 37 If the "Save Data" button is pressed before a reading has been seen, the "Save HF Leakage" menu is displayed but the "HF Leakage" value is set to zero. This enables a user to record a specific case where the ESU under test produces little or no detectable leakage, thereby resulting in a test "PASS". This type of result may be encountered when testing cross-coupled leakage between ESU outputs (leakage test #7). If CUT, COAG or BIPOLAR footswitch control is in use, the leakage is captured and the "Save HF Leakage" dialog is shown automatically when the footswitch timer reaches zero count. This is similar to automated measurement and data recording in the HF Output test (see section 4.5.9). If no leakage has been detected by the time the footswitch timer reaches zero, the "Save HF Leakage" dialog is still displayed but the "HF Leakage" result is set to zero and the test result is assigned a "PASS". Similarly, if measuring semiautomatically as described in section 4.5.10, when the "Switch RF off" prompt appears there may be no detectable leakage and thus the "Save HF Leakage" dialog will show a measurement of zero and test result of "PASS". Accept the result by pressing the "Save" button on the dialog, or press "Cancel" to discard and then retest. Leakage results saved to the test data buffer may be viewed with the "View Data" button. A Test Record file of the results may be saved from the "View Data" menu if a control number has been entered via the "Equipment Information" menu. For further details, refer to sections 4.8 and 4.9 respectively.
Operation/Chapter 4 # Page 46

vPad-ESU OPERATORS MANUAL
4.7 REM (CQM) Test
The REM (CQM) test is used to verify the Return Electrode Monitor (REM) or Contact Quality Monitor (CQM) function of the ESU. The test is performed by varying a resistance which is connected to the REM or CQM port of the ESU. The test procedure involves setting the resistance to specified values and observing the corresponding response of the ESU's REM or CQM alarm indicator. Typically, you will need to follow a specific test procedure provided by the manufacturer of the ESU. 4.7.1 REM Test Setup Start a REM (CQM) test by pressing the "REM (CQM) Test" button on the main menu of the app.
Fig u re 38 Set up the test as shown in the following diagram.
Fig u re 39
Operation/Chapter 4 # Page 47

vPad-ESU OPERATORS MANUAL
As shown, use a REM test cable to connect the REM (CQM) jacks of vPad-ESU to the REM or CQM port of the device under test (DUT). For the majority of ESU models, to connect vPad-ESU and the ESU you will use a REM test cable with a pin on the rectangular plug (P/N 7200-570). This cable is provided with vPad-ESU as a standard accessory. With some ESUs, for example Olympus ESG-400, a REM test cable without pin must be used. This cable is available as an optional accessory (P/N 7200-571). Some manufacturers specify a test procedure in which both cables will be needed to completed all steps of the test
(e.g. Covidien or Valleylab Force FX).
4.7.2 REM Test Procedure The REM test menu provides a user interface for varying the resistance across the REM (CQM) jacks. The resistance can be varied between zero and 1023 ohms with a precision of one ohm.
Fig u re 40
Use any of the following methods to vary the resistance: · Drag the slider control below the resistance readout. · Increment or decrement the resistance in one ohm steps by pressing the  or  button. · Increase the resistance continuously by pressing and holding the  button, or by pressing the "Sweep Up" button. Discontinue the automatic sweep by pressing the "Stop Sweep" button. · Decrease the resistance continuously by pressing and holding the  button, or by pressing the "Sweep Down" button. Discontinue the automatic sweep by pressing the "Stop Sweep" button. · Press the "Set" button and input a specific resistance value using the keyboard, or choose a resistance from a list of favourites.
Operation/Chapter 4 # Page 48

vPad-ESU OPERATORS MANUAL
Fig u re 41 On the "Set Resistance" dialog, press the "Choose" button to display a pick list of preset resistance values. The list of presets can be modified by the user; see section 4.4.2 for editing instructions.
Fig u re 42 The resistance is set to a default value when the REM test is started. To change the default, press the "Set" button then enable the "Save as default" checkbox on the "Set Resistance" dialog. Enter the desired startup value then press "Done" on the keyboard.
Operation/Chapter 4 # Page 49

vPad-ESU OPERATORS MANUAL
When testing the REM or CQM alarm function of the DUT, follow the test procedure of the ESU manufacturer. Set or sweep the test resistance and confirm the ESU produces a REM alarm, or clears the alarm, at the specified values of resistance. 4.7.3 Saving REM Test Results The "Save Data" button on the REM test menu may be pressed at any time to record a test result.
Fig u re 43 Select alarm "ON" or "OFF" according to the current status of the DUT for the resistance value displayed. Then, choose a "Test Result" depending on how the DUT should be responding to the resistance according to the manufacturer's specifications. Choose "INFO ONLY" if there is no specified DUT response for the set resistance but the value is being recorded to show compliance with the testing procedure. Once a "Test Result" is selected, press the "Save" button to copy the result to the test data buffer. REM test results saved to the data buffer may be viewed with the "View Data" button. A Test Record file of the results may be saved from the "View Data" menu if a control number has been entered via the "Equipment Information" menu. For further details, refer to sections 4.8 and 4.9 respectively.
Operation/Chapter 4 # Page 50

vPad-ESU OPERATORS MANUAL
4.8 Viewing Test Results
The "View Data" button may be pressed to view the current contents of the Test Record data buffer.
Fig u re 44 On this menu, "Clear Last" erases the most recently-recorded measurement from the buffer. "Clear All" clears the entire buffer. A confirmation prompt is displayed if "Clear All" is pressed. "Enter Equipment Information" opens the equipment information menu, which is described in section 4.9. Once an equipment ID or control number has been entered via the "Equipment Information" menu, the "Create Record" button will be enabled which allows results in the data buffer to be permanently saved as a Test Record file on the tablet. Refer to section 4.10 for details on creating a Test Record.
Operation/Chapter 4 # Page 51

vPad-ESU OPERATORS MANUAL
4.9 Entering Equipment Information
The Equipment Information menu is used to enter details about the ESU under test. This menu can be entered from the "View Data" menu (see section 4.8). The menu is also displayed when an automated test is started.
Fig u re 45 As shown above, the menu provides fields for manual input of control number, serial number, description, manufacturer, model, location, facility and technician. Of these, only the Control Number m u s t be entered to enable saving of a Test Record file. To enter information, press the corresponding field to display the Android soft keyboard. Buttons are provided on the menu for erasing selected fields of the information: control and serial number only; make and model only; or all fields on the menu. Facility and technician fields are "sticky" and are maintained in a file on the tablet. If the description field is blank when the menu is opened, it is auto-populated with "Electrosurgical generator" by default. The "Choose Device" button displays a pick list of ESU makes and models; use the pick list to streamline input of manufacturer and model fields of the information.
Operation/Chapter 4 # Page 52

vPad-ESU OPERATORS MANUAL
Fig u re 46 Similarly, use the "Choose" (location) button to select from a list of hospital locations. The lists of ESU models and hospital locations may be modified by the user; see section 4.4.2 for editing instructions.
Fig u re 47
Operation/Chapter 4 # Page 53

vPad-ESU OPERATORS MANUAL
Pressing the control number "Search" button causes the app to search for an equipment.csv file on the tablet, and if such a file is found, the file is then searched for a match to the ID in the control number field. If a match is found, the information fields on the menu are then automatically populated from the CSV file.
Fig u re 48
There are several ways a user may create or obtain a CSV file of ESU equipment. The most direct but perhaps least efficient way is to create the file with a spreadsheet program, entering the equipment information manually and then saving the spreadsheet in CSV format. Alternatively, it may be possible to create an equipment.csv file as an export from your Computerized Maintenance Management System (CMMS). With these approaches, the resulting equipment.csv file should be copied to the Datrend/vPad-ESU folder on the tablet so that the vPad-ESU app can find it. Alternatively, an equipment.csv file can be created by the vPad-EQMTM Equipment Manager app, or imported to the tablet from a CMMS by the vPad-mTTM medTester Emulator app. If vPad-ESU does not find an equipment.csv file in its own folder, it will try to find it in folders used by the vPad-EQM and vPad-mT apps. If an equipment.csv file cannot be found when the "Search" button is pressed, the error is reported by means of a dialog. The first line of the equipment.csv file specifies the data columns and subsequent lines contain the equipment data. Below is an example showing how to format the equipment.csv file:
ControlNumber,SerialNumber,Description,Manufacturer,Model,Location,Facility,NextDate CN11705,13DGP121,Electrosurgery Unit,CONMED,System 5000,OR 6,Anytown General Hospital,2016-Jul-14 CN13041,V312-006-2,Electrosurgery Unit,VALLEYLAB,Force FX,OR 2,Anytown General Hospital,2016-Sep-8 CN13042,V318-011-2,Electrosurgery Unit,VALLEYLAB,Force FX,OR 3,Anytown General Hospital,2016-Sep-8 ... CN200452,4953001498,Electrosurgery Unit,OLYMPUS,ESG-400,OR 9,Anytown General Hospital,2016-Dec-4
Operation/Chapter 4 # Page 54

vPad-ESU OPERATORS MANUAL
4.10 Creating a Test Record
Once measurement data has been recorded and a control number has been input via the "Equipment Information" menu (section 4.9), it becomes possible to create a Test Record of the measurements. To do so, press the "Create Record" button on the "View Data" menu (see section 4.8). The Test Record filename is auto-generated based on the control number as shown in the example below.
Fig u re 49 Optionally, enter technician labour time in minutes or hours and a due date for the next test of the ESU. To streamline input of a due date, press "1 year" to generate a default equal to today plus 12 months. To view Test Records which have been saved by vPad-ESU, press the "Test Records" button on the main menu of the app. This will launch the vPad Record Manager app which will allow such Records to be converted from the native format to PDF, printed, transmitted to a PC by Bluetooth or through the internet, or copied to a USB flash drive connected to the tablet. Refer to section 4.13 for details on the Record Manager.
Operation/Chapter 4 # Page 55

vPad-ESU OPERATORS MANUAL
4.11 Automated Testing
Automated test sequences or "AutoSequences" are based on manual tests described in the preceding sections. In addition to test measurements, AutoSequences can be programmed to include procedural instructions, drawings or schematics, and inspection checkpoints. AutoSequences are ideal for performing preventive maintenance (PM) inspections of electrosurgical equipment in accordance with manufacturer's specifications. 4.11.1 Selecting and Starting a Test An automated test or PM procedure is selected by pressing the "AutoSequences" button on the main menu of the app.
Fig u re 50 Each automated test corresponds to a ".rfa" file in the vPad-ESU file folder on the tablet. The AutoSequence selector menu displays the filenames in ascending alphabetical order, but without the ".rfa" file extension.
Operation/Chapter 4 # Page 56

vPad-ESU OPERATORS MANUAL
Fig u re 51 Select the desired test by pressing a row of the "Select Autosequence" menu. If the "KEEP LEADS AWAY..." warning has not yet been displayed, it is shown now. See section 4.5.2 for further information on this important warning. As a first step, you are prompted to input information about the ESU under test. Fill in the information then press "Next Step" to proceed. For more details on the "Equipment Information" menu and the equipment "Search" function, refer to section 4.9.
Fig u re 52
Operation/Chapter 4 # Page 57

vPad-ESU OPERATORS MANUAL
Entering equipment information at this stage is optional. To skip the information input, simply press "Next Step" to begin the test immediately. At the end of the test, you will be prompted to enter an equipment control number as this is the minimum information required to create and save a Test Record file.
4.11.2 Test Execution
After inputting or skipping the equipment information, the automated test is executed as a series of steps which are performed sequentially, one after the other.

Fig u re 53
Press the "Next Step" button to increment to the next step of the sequence. Press the "Previous Step" button to review prior instructions or results. To abort the test and discard acquired results, press the "Quit Test" button. You will be prompted to confirm the abort in this case.
During a PM inspection, a fault in the equipment may be encountered which cannot be corrected at time of test. In this case, press "Finish Test" to create a Test Record of results acquired up that point in the procedure1. Repair the fault then repeat the AutoSequence/PM from the beginning.
Follow instructions as these are displayed during the procedure. Certain steps may require you to examine a schematic or photograph. Press the "Show Picture" button when such steps are encountered. If necessary, pinch-zoom and drag gestures may be used to expand specific areas of displayed images.

1

Since the PM is incomplete, the Test Record will be assigned a "FAIL". A record of failed equipment may not seem

particularly helpful, however, provided faulty equipment is identified and quarantined for repair, the Test Record

provides evidence that the PM completion requirement of the equipment management system has been addressed.

Operation/Chapter 4 # Page 58

vPad-ESU OPERATORS MANUAL

Fig u re 54

Fig u re 55

To exit the image viewer, press the BACK button procedure.

, then press "Next Step" to continue with the

Inspection steps or "checks" will require you to examine the ESU and select "PASS", or otherwise an alternative result such as "FAIL", "SERVICE", "INFO" or "N/A" (not applicable). If you choose "PASS", the sequence advances to the next step automatically. If you choose a result other than "PASS", the app will prompt you for a rationale for that result and will display the keyboard so you can enter it. For results other than "PASS", you must enter a reason after which the sequence will be permitted to move on with the next step. For these inspection steps, the results can be entered automatically by using a barcode scanner to scan preprinted "PASS", "FAIL" or "SVC" (service) barcodes.

Fig u re 56
Operation/Chapter 4 # Page 59

vPad-ESU OPERATORS MANUAL
Test steps will measure HF Output, HF Leakage or REM (CQM) alarm response. These steps operate similarly to their manual counterparts as described in preceding sections of this manual. Each test step includes pass/fail limits for the measurement result. If the measurement falls within the specified limits, the sequence advances to the next step automatically after a short delay.
Fig u re 57 If instead of "PASS" the measurement is a "FAIL", the sequence stops at the current step which enables you to correct the problem and repeat the measurement. At the end of the sequence, you are shown a summary of the results and you are then prompted to create a Test Record. The Test Record filename is auto-generated based on the control number as shown in the example below.
Fig u re 58
Operation/Chapter 4 # Page 60

vPad-ESU OPERATORS MANUAL
If you did not enter a control number at the start of the test, you will be prompted to enter it now by means of a dialog. Press "Continue" to dismiss the dialog and view the "Equipment Information" menu. Input the required control number which will then enable you to save the Test Record. On "Create Record" dialog, optionally enter the technician labour time in minutes or hours and a due date for the next test of the ESU. To streamline input of a due date, press "1 year" to generate a default equal to today plus 12 months. When the Record is saved, you will be returned to the main menu of the app. To view Test Records which have been saved by vPad-ESU, press the "Test Records" button on the main menu of the app. This will launch the vPad Record Manager app which will allow such Records to be converted from the native format to PDF, printed, transmitted to a PC by Bluetooth or through the internet, or copied to a USB flash drive connected to the tablet. Refer to section 4.13 for details on the Record Manager.
4.11.3 AutoSequence Programming Example AutoSequences are provided with the vPad-ESU app. The example AutoSequences include PM inspection procedures for ConMed, Covidien, Olympus and Valleylab ESU models. The PM procedures provided with vPad-ESU may be copied and used as templates to write new PM procedures for other ESU models. Note that AutoSequences provided with vPad-ESU are based on manufacturer's information available at the time the sequences were created and are subject to change without notice. Datrend provides the procedures as examples only and they should be reviewed and approved before use. AutoSequences are script-based programs which are written in the vPad "RFA" language. Minor changes and updates to RFA scripts can be accomplished on the tablet using an editor app (see section 4.4.3). Programming of RFA scripts from scratch is more easily accomplished on a desktop or laptop computer, using a chroma-coded editor intended for writing program code or alternatively by using the Datrend v Pad IDETM software for MS WindowsTM. Refer to manual MN-151 RFA Pro g ram m e r's Gu id e fo r v Pad -ESU for more information on creating automated test sequences and preventive maintenance inspection procedures for vPad-ESU.
Operation/Chapter 4 # Page 61

vPad-ESU OPERATORS MANUAL
4.12 Power Curves
A power curve test is a special kind of automated test sequence in which ESU output power is measured while the load is varied over a range of preset resistance values. The test may be completely automated, in which vPad-ESU switches the ESU on and off by means of a footswitch control cable. Alternatively, the test may be semi-automated in which case the technician is prompted by vPad-ESU to activate the generator by means of a footpedal or handswitch device. 4.12.1 Selecting and Starting a Test A power curve test is selected by pressing the "Power Curves" button on the main menu of the app.
Fig u re 59 The selector menu displays the power curve tests which are currently stored on the tablet.
Fig u re 60
Operation/Chapter 4 # Page 62

vPad-ESU OPERATORS MANUAL
Select the desired test by pressing a row of the "Select Power Curve Test" menu. If the "KEEP LEADS AWAY..." warning has not yet been displayed, it is shown now. See section 4.5.2 for further information on this important warning. 4.12.2 Test Execution A Power Curve test begins by displaying the test setup instructions. The instructions are derived from settings which are contained in the power curve setup.
Fig u re 61 Connect the ESU to be tested to vPad-ESU as shown in the diagram. Set the ESU power, mode and waveform to the settings specified in the instructions. If the test is fully automated, you will be required to connect a footswitch control cable from the FOOTSWITCH OUTPUT of vPad-ESU to corresponding footswitch inputs of the DUT. Available as accessories for vPad-ESU, footswitch control cables can be obtained for Covidien/Valleylab ForceTriad (P/N 7200-557), Covidien/Valleylab Force FX (P/N 7200559), ConMed System 5000 (P/N 7200-558) as well as other makes and models.
Operation/Chapter 4 # Page 63

vPad-ESU OPERATORS MANUAL
Fig u re 62 Once the ESU has been set up and connected to vPad-ESU as required, press the "Start Test" button to run the test sequence.
Fig u re 63 Status of the test sequence is displayed near the top of the screen. For tests where the generator is activated manually (footswitch control not is use), obey the prompts which are displayed at the top of the screen and switch the ESU on or off when instructed to do so.
Operation/Chapter 4 # Page 64

vPad-ESU OPERATORS MANUAL
According to the test setup, at each step of the test sequence: a. The resistance of the HF load is set. b. For fully-automated tests, the specified footswitch control is activated; for manual tests, the user is
prompted to activate the generator. c. The power is measured and is displayed in the status area near the top of the screen. For manual tests,
a "Save Data" button is shown below the data table on the right and becomes enabled when the ESU signal is detected. Press the "Save Data" button to save the power measurement to the data table. e. The data table scrolls down automatically as power measurements are added to it, and the power graph is updated. f. For a manual test, the user is prompted to switch off the ESU once the data table and graph have been updated. vPad-ESU waits until the ESU signal disappears, then clears the prompt from the status area. g. Once the ESU has been de-activated, vPad-ESU delays for a period of time that is determined from the duty cycle specified in the test setup. During the delay, a countdown timer is shown in the status area. After the "off" delay, the next load is read from the test setup and the process repeats, beginning with step (a.) above. The test sequence stops when all loads have been tested. A "Save Test" button then appears at far right, below the data table. Test result buttons appear on the left. To save the test, select a result and press the "Save Test" button.
Fig u re 64
Operation/Chapter 4 # Page 65

vPad-ESU OPERATORS MANUAL
If a "limits" CSV file has been specified in the test setup, upper and lower limit curves as read from the file will be shown in red on the chart. At the end of the test sequence, the acquired power measurements are compared to the limits from the CSV file. A "PASS" or "FAIL" result is automatically assigned based on the limit comparisons. To save the results, simply press the "Save Test" button.
Fig u re 65 A "Save graph" checkbox is displayed on completion of the test sequence. If this box is checked and the "Save Test" button then pressed, a PNG image of the power graph is saved to a file with an auto-generated filename:
pwr_YYYYmmDD_hhMMss.png The PNG image is saved to a temporary folder on the tablet. If a Test Record is eventually saved, the temporary folder is renamed with the equipment ID of the Test Record. Images saved during power curve and other tests may be found in the vPad-ESU file folder on the tablet. Refer to section 4.10 for details on saving a Test Record. 4.12.3 Power Curve Programming Example Power Curve tests are provided with the vPad-ESU app. These may be used as templates to create new tests. Refer to section 4.4.4 for programming instructions.
Operation/Chapter 4 # Page 66

vPad-ESU OPERATORS MANUAL
4.13 Record Manager App
vPad Record Manager is an app which is installed on the Android tablet and which may be run independently of, or simultaneously with, the vPad-ESU app.
Record Manager may be used to copy, print, and/or delete Test Record files saved by vPad-ESU. Record Manager can also be used to convert Test Records to Adobe PDF documents. Note that PDF is a format which enables vPad Record compatibility with other Android apps, for example, e-book readers and document printing apps.

Press

on the Android HOME screen to launch the Record Manager app.

Fig u re 66 Refer to MN-087a 6100-081 v Pad -RM O p e rato rs Man u al for further information on use of the Record Manager.
Operation/Chapter 4 # Page 67

vPad-ESU OPERATORS MANUAL
Operation/Chapter 4 # Page 68

vPad-ESU OPERATORS MANUAL
5 Calibration and Maintenance
Calibration of vPad-ESU by a Datrend Authorized Service facility is recommended on an an n u al basis, and is re q u ire d to extend the product warranty. The basic one (1) year warranty on the RF Analyzer can be extended to a maximum of two (2) years provided that annual calibration is performed by a Datrend Authorized Service Center on an an n u al basis. Refer to the Calibration Decal applied to the rear panel of the unit to determine calibration status of your vPad-ESU.
vPad-ESU contains no user serviceable parts. Failure of vPad-ESU will require return of the unit to an authorized service facility for repair. O p e n in g th e c as e o f v Pad -ESU fo r an y re as o n w ill v o id th e w arranty and m ay c o m p ro m ise use r safe ty.
Service must be performed by a factory trained, authorized service agent. This unit contains hazardous voltages which may cause injury if correct service procedures are not followed.
For calibration or service assistance, contact Datrend for a Return Materials Authorization (RMA) number and the location of the nearest Service Facility.
Datrend Systems Inc. Unit 130 - 4020 Viking Way Richmond, BC · CANADA · V6V 2L4 Tel: 800.667.6557 (North America only) or +1.604.291.7747 · Fax +1.604.294.2355 e-mail: customerservice@datrend.com
www.datrend.com
vPad-ESU may be cleaned with a soft, lint free, damp cloth using a mild detergent. Use of other cleaning agents on the touchscreen may result in scratching, discolouration, streaking or even failure.
Electrical safety protection of the operator may be compromised if the instructions in this manual are not followed, or if vPad-ESU is used for a purpose not specified in this manual.
Maintenance/Chapter 5 # Page 69

vPad-ESU OPERATORS MANUAL
Maintenance/Chapter 5 # Page 70

vPad-ESU OPERATORS MANUAL

APPENDIX A. Sample Test Record
This appendix provides an example of a vPad-ESU Test Record, illustrating the data representation for HF output, HF leakage and REM (CQM) tests as well as equipment inspection tasks. The following was obtained by running the "ConMed System 5000 PM Inspection" AutoSequence provided with vPad-ESU. This AutoSequence includes all steps of the preventive maintenance inspection procedure specified by the manufacturer in the ConMed 5000 service manual (CONMED Manual No. 60-8-17-ENG Rev. S, 2010).

Biomedical Engineering Dept. St. Joseph's Hospital 1234 Main Street MyTown MyState 98765
Phone: 123-456-7890 Ext. 123

File: CN1838_20151116_125648_P.txt Date: 2015 Nov 16 Time: 12:56:48 vPad-ESU: VRF15010100

Equipment Information...

Control Number: CN1838

Description:

Electrosurgical unit

Manufacturer: ConMed

Model:

System 5000

Serial Number: 13DGP121

Location:

OR14

Facility:

St. Joseph's Hospital

Technician ID: RWJ Tech Time (hrs): 2.50

Overall Result: PASS Next Test Due: 2016 Nov 16

Signature:______________________________ Date:__________

Detailed Test Data...
AutoSequence: ConMed System 5000 PM Inspection.rfa Test Run-Time: 109 minutes ____________________________________________________________
Task: Perform POWER-ON test. Confirm: audio tones emitted; all displays operational; and no error codes displayed after self-test.
Result: PASS

Appendix A # Page 71

vPad-ESU OPERATORS MANUAL
____________________________________________________________
Task: Check operation of CUT footswitch control Result: PASS ____________________________________________________________
Task: Check dispersive alarm indicators and sound Result: PASS ____________________________________________________________
Task: Verify keypad operation for Pure Cut Mode Result: PASS ____________________________________________________________
Task: Verify keypad operation for: BLEND 1, 2 & 3; COAG Pinpoint, Standard & Spray; BIPOLAR Micro & Macro; PULSE Cut & Coag; FLUIDS & LAP modes
Result: PASS ____________________________________________________________
Task: Verify keypad operations associated with Specialty Modes (Fluids & Lap)
Result: PASS ____________________________________________________________
Task: Check operation of BIPOLAR footswitch control Result: PASS ____________________________________________________________
Task: Connect forceps or jumper lead to front-panel Bipolar receptacle. Check activation of Bipolar output.
Result: PASS ____________________________________________________________
Task: Confirm Single and Dual Dispersive Electrode Status/Alarm indicators are alternately flashing red
Result: PASS ____________________________________________________________
Task: Check operation of dispersive receptical and single-pad indicator
Result: PASS ____________________________________________________________
Task: Depress CUT treadle of monopolar footswitch. Confirm yellow Cut Activation indicator lights up and cut activation sound is heard.
Result: PASS ____________________________________________________________
Task: Check operation of COAG footswitch control Result: PASS ____________________________________________________________
Task: Use hand-controlled accessory or test pencil to verify handswitch operation of both monopolar receptacles
Result: PASS
Appendix A # Page 72

vPad-ESU OPERATORS MANUAL

____________________________________________________________

Task: Disconnect dispersive electrode and confirm generator beeps three times and Single and Dual Dispersive Electrode Status/Alarm indicators alternately flash red
Result: PASS ____________________________________________________________

REM (CQM) TEST...

Resistance Limit(s) REM

Test

(ohms)

(ohms) Alarm Result

158

158+/-0

ON

PASS

140

140+/-0

OFF

PASS

15

15+/-0

OFF

PASS

7

7+/-0

OFF

PASS

____________________________________________________________

HF OUTPUT TEST: Load=300 ohms

Result: PASS

ESU settings: Bipolar MACRO, 10W

Power (watts): 10.0, limit=7.0-13.0

Current (mA): 183.5, limit=153.0-208.0

Voltages (V): Vrms=54.8, Vpk=96.6, Vp-p=173.4; CF=1.76

____________________________________________________________

HF OUTPUT TEST: Load=300 ohms

Result: PASS

ESU settings: Bipolar MACRO, 20W

Power (watts): 19.9, limit=17.0-23.0

Current (mA): 258.4, limit=238.0-277.0

Voltages (V): Vrms=77.1, Vpk=135.1, Vp-p=243.6; CF=1.75

____________________________________________________________

HF OUTPUT TEST: Load=300 ohms

Result: PASS

ESU settings: Bipolar MACRO, 90W

Power (watts): 89.0, limit=81.1-98.8

Current (mA): 546.1, limit=520.0-574.0

Voltages (V): Vrms=163.0, Vpk=281.0, Vp-p=512.5; CF=1.72

____________________________________________________________

HF OUTPUT TEST: Load=50 ohms

Result: PASS

ESU settings: Bipolar MICRO, 10W

Power (watts): 10.4, limit=7.0-13.0

Current (mA): 457.3, limit=374.0-510.0

Voltages (V): Vrms=22.7, Vpk=39.1, Vp-p=73.3; CF=1.72

____________________________________________________________

HF OUTPUT TEST: Load=50 ohms

Result: PASS

ESU settings: Bipolar MICRO, 25W

Power (watts): 25.7, limit=22.0-28.0

Current (mA): 718.6, limit=663.0-748.0

Voltages (V): Vrms=35.7, Vpk=60.4, Vp-p=114.6; CF=1.69

____________________________________________________________

HF OUTPUT TEST: Load=50 ohms

Result: PASS

ESU settings: Bipolar MICRO, 50W

Power (watts): 51.1, limit=45.0-55.0

Current (mA): 1013.7, limit=949.0-1049.0

Voltages (V): Vrms=50.4, Vpk=83.0, Vp-p=159.4; CF=1.65

Appendix A # Page 73

vPad-ESU OPERATORS MANUAL

____________________________________________________________

HF LEAKAGE: Isolated active lead

Result: PASS

ESU load: None

Conditions: Bipolar R, MACRO 90W

Leakage: 40.7 mA

Limit:

67.0 mA

____________________________________________________________

HF LEAKAGE: Isolated active lead

Result: PASS

ESU load: None

Conditions: Bipolar L, MACRO 90W

Leakage: 38.1 mA

Limit:

67.0 mA

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PURE CUT, 10W

Power (watts): 11.1, limit=7.0-13.0

Current (mA): 149.7, limit=118.0-161.0

Voltages (V): Vrms=74.4, Vpk=108.0, Vp-p=213.6; CF=1.45

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PURE CUT, 20W

Power (watts): 21.6, limit=16.9-23.8

Current (mA): 208.4, limit=184.0-218.0

Voltages (V): Vrms=103.7, Vpk=150.0, Vp-p=296.6; CF=1.45

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PURE CUT, 50W

Power (watts): 52.3, limit=45.0-55.1

Current (mA): 324.4, limit=300.0-332.0

Voltages (V): Vrms=161.3, Vpk=232.5, Vp-p=460.3; CF=1.44

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PURE CUT, 100W

Power (watts): 103.1, limit=89.9-110.0

Current (mA): 455.2, limit=424.0-469.0

Voltages (V): Vrms=226.4, Vpk=328.4, Vp-p=649.9; CF=1.45

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PURE CUT, 200W

Power (watts): 204.1, limit=180.0-219.8

Current (mA): 640.6, limit=600.0-663.0

Voltages (V): Vrms=318.6, Vpk=462.3, Vp-p=915.0; CF=1.45

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PURE CUT, 300W

Power (watts): 305.2, limit=270.1-329.7

Current (mA): 783.4, limit=735.0-812.0

Voltages (V): Vrms=389.6, Vpk=568.4, Vp-p=1123.1; CF=1.46

____________________________________________________________

Appendix A # Page 74

vPad-ESU OPERATORS MANUAL

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 1, 10W

Power (watts): 11.4, limit=7.0-13.0

Current (mA): 151.2, limit=118.0-161.0

Voltages (V): Vrms=75.2, Vpk=133.1, Vp-p=265.4; CF=1.77

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 1, 20W

Power (watts): 21.8, limit=16.9-23.8

Current (mA): 209.5, limit=184.0-218.0

Voltages (V): Vrms=104.2, Vpk=185.0, Vp-p=369.2; CF=1.78

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 1, 50W

Power (watts): 52.9, limit=45.0-55.1

Current (mA): 326.1, limit=300.0-332.0

Voltages (V): Vrms=162.2, Vpk=287.5, Vp-p=574.5; CF=1.77

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 1, 100W

Power (watts): 103.9, limit=89.9-110.0

Current (mA): 457.0, limit=424.0-469.0

Voltages (V): Vrms=227.3, Vpk=401.9, Vp-p=803.7; CF=1.77

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 1, 200W

Power (watts): 205.3, limit=180.0-219.8

Current (mA): 642.5, limit=600.0-663.0

Voltages (V): Vrms=319.5, Vpk=564.8, Vp-p=1128.9; CF=1.77

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 2, 10W

Power (watts): 11.1, limit=7.0-13.0

Current (mA): 149.6, limit=118.0-161.0

Voltages (V): Vrms=74.4, Vpk=166.4, Vp-p=329.8; CF=2.24

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 2, 20W

Power (watts): 21.5, limit=16.9-23.8

Current (mA): 207.9, limit=184.0-218.0

Voltages (V): Vrms=103.4, Vpk=231.9, Vp-p=459.7; CF=2.24

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 2, 50W

Power (watts): 52.2, limit=45.0-55.1

Current (mA): 323.8, limit=300.0-332.0

Voltages (V): Vrms=161.1, Vpk=358.3, Vp-p=712.5; CF=2.22

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 2, 100W

Power (watts): 102.9, limit=89.9-110.0

Current (mA): 454.8, limit=424.0-469.0

Voltages (V): Vrms=226.2, Vpk=501.2, Vp-p=998.9; CF=2.22

Appendix A # Page 75

vPad-ESU OPERATORS MANUAL

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 2, 200W

Power (watts): 204.3, limit=180.0-219.8

Current (mA): 640.9, limit=600.0-663.0

Voltages (V): Vrms=318.7, Vpk=689.0, Vp-p=1375.2; CF=2.16

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 3, 10W

Power (watts): 11.1, limit=7.0-13.0

Current (mA): 149.1, limit=118.0-161.0

Voltages (V): Vrms=74.2, Vpk=211.5, Vp-p=408.2; CF=2.85

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 3, 20W

Power (watts): 21.4, limit=16.9-23.8

Current (mA): 207.4, limit=184.0-218.0

Voltages (V): Vrms=103.2, Vpk=299.1, Vp-p=574.0; CF=2.90

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 3, 50W

Power (watts): 52.0, limit=45.0-55.1

Current (mA): 323.4, limit=300.0-332.0

Voltages (V): Vrms=160.8, Vpk=472.7, Vp-p=902.5; CF=2.94

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 3, 100W

Power (watts): 102.7, limit=89.9-110.0

Current (mA): 454.5, limit=424.0-469.0

Voltages (V): Vrms=226.0, Vpk=652.2, Vp-p=1245.9; CF=2.89

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar BLEND 3, 200W

Power (watts): 204.2, limit=180.0-219.8

Current (mA): 640.8, limit=600.0-663.0

Voltages (V): Vrms=318.7, Vpk=827.7, Vp-p=1651.1; CF=2.60

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar SPRAY coag, 10W

Power (watts): 11.3, limit=7.0-13.0

Current (mA): 150.9, limit=118.0-161.0

Voltages (V): Vrms=75.0, Vpk=811.8, Vp-p=1347.0; CF=10.82

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar SPRAY coag, 20W

Power (watts): 21.6, limit=16.9-23.8

Current (mA): 208.6, limit=184.0-218.0

Voltages (V): Vrms=103.8, Vpk=1016.9, Vp-p=1569.5; CF=9.80

____________________________________________________________

Appendix A # Page 76

vPad-ESU OPERATORS MANUAL

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar SPRAY coag, 50W

Power (watts): 52.5, limit=45.0-55.1

Current (mA): 325.0, limit=300.0-332.0

Voltages (V): Vrms=161.6, Vpk=1363.6, Vp-p=2103.2; CF=8.44

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar SPRAY coag, 80W

Power (watts): 84.4, limit=71.8-88.2

Current (mA): 411.8, limit=379.0-420.0

Voltages (V): Vrms=204.8, Vpk=1516.8, Vp-p=2525.1; CF=7.40

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar STANDARD coag, 10W

Power (watts): 11.1, limit=7.0-13.0

Current (mA): 149.5, limit=118.0-161.0

Voltages (V): Vrms=74.4, Vpk=441.4, Vp-p=677.6; CF=5.93

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar STANDARD coag, 20W

Power (watts): 21.7, limit=16.9-23.8

Current (mA): 208.9, limit=184.0-218.0

Voltages (V): Vrms=103.9, Vpk=616.1, Vp-p=951.2; CF=5.93

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar STANDARD coag, 50W

Power (watts): 53.1, limit=45.0-55.1

Current (mA): 326.6, limit=300.0-332.0

Voltages (V): Vrms=162.4, Vpk=930.3, Vp-p=1449.6; CF=5.73

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar STANDARD coag, 100W

Power (watts): 105.2, limit=89.9-110.0

Current (mA): 459.9, limit=424.0-469.0

Voltages (V): Vrms=228.8, Vpk=1308.0, Vp-p=2036.0; CF=5.72

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar STANDARD coag, 120W

Power (watts): 126.0, limit=108.1-132.1

Current (mA): 503.4, limit=465.0-514.0

Voltages (V): Vrms=250.4, Vpk=1430.8, Vp-p=2229.6; CF=5.71

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PINPOINT coag, 10W

Power (watts): 11.5, limit=7.0-13.0

Current (mA): 151.9, limit=118.0-161.0

Voltages (V): Vrms=75.5, Vpk=340.7, Vp-p=585.6; CF=4.51

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PINPOINT coag, 20W

Power (watts): 22.2, limit=16.9-23.8

Current (mA): 211.1, limit=184.0-218.0

Voltages (V): Vrms=105.0, Vpk=465.9, Vp-p=812.9; CF=4.44

Appendix A # Page 77

vPad-ESU OPERATORS MANUAL

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PINPOINT coag, 50W

Power (watts): 53.9, limit=45.0-55.1

Current (mA): 329.0, limit=300.0-332.0

Voltages (V): Vrms=163.7, Vpk=699.9, Vp-p=1266.1; CF=4.28

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PINPOINT coag, 100W

Power (watts): 106.2, limit=89.9-110.0

Current (mA): 462.2, limit=424.0-469.0

Voltages (V): Vrms=229.9, Vpk=955.5, Vp-p=1760.9; CF=4.16

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Monopolar PINPOINT coag, 120W

Power (watts): 127.5, limit=108.1-132.1

Current (mA): 506.4, limit=465.0-514.0

Voltages (V): Vrms=251.9, Vpk=1027.1, Vp-p=1927.0; CF=4.08

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Mono PULSED STANDARD coag, 10W

Power (watts): 10.6, limit=7.0-13.0

Current (mA): 146.2, limit=118.0-161.0

Voltages (V): Vrms=72.7, Vpk=612.5, Vp-p=944.7; CF=8.42

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Mono PULSED STANDARD coag, 20W

Power (watts): 20.9, limit=16.9-23.8

Current (mA): 205.1, limit=184.0-218.0

Voltages (V): Vrms=102.0, Vpk=840.0, Vp-p=1308.0; CF=8.23

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Mono PULSED STANDARD coag, 60W

Power (watts): 62.1, limit=54.1-65.9

Current (mA): 353.4, limit=329.0-363.0

Voltages (V): Vrms=175.8, Vpk=1443.8, Vp-p=2252.0; CF=8.21

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Mono PULSED SPRAY coag, 10W

Power (watts): 10.7, limit=7.0-13.0

Current (mA): 146.5, limit=118.0-161.0

Voltages (V): Vrms=72.9, Vpk=1025.6, Vp-p=1581.7; CF=14.08

____________________________________________________________

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Mono PULSED SPRAY coag, 20W

Power (watts): 20.6, limit=16.9-23.8

Current (mA): 203.5, limit=184.0-218.0

Voltages (V): Vrms=101.2, Vpk=1253.8, Vp-p=1901.7; CF=12.39

____________________________________________________________

Appendix A # Page 78

vPad-ESU OPERATORS MANUAL

HF OUTPUT TEST: Load=500 ohms

Result: PASS

ESU settings: Mono PULSED SPRAY coag, 40W

Power (watts): 41.1, limit=35.9-44.1

Current (mA): 287.5, limit=268.0-297.0

Voltages (V): Vrms=143.0, Vpk=1518.2, Vp-p=2523.6; CF=10.62

____________________________________________________________

HF LEAKAGE: Isolated neutral lead

Result: PASS

ESU load: None

Conditions: RETURN; Foot ctl; Std COAG 120W

Leakage: 66.5 mA

Limit:

100.0 mA

____________________________________________________________

HF LEAKAGE: Isolated neutral lead

Result: PASS

ESU load: None

Conditions: RETURN; Foot ctl; Pure CUT 300W

Leakage: 73.5 mA

Limit:

100.0 mA

____________________________________________________________

HF LEAKAGE: Isolated neutral lead

Result: PASS

ESU load: None

Conditions: DISPERSIVE; L.Hand ctl; Std COAG 120W

Leakage: 88.3 mA

Limit:

100.0 mA

____________________________________________________________

HF LEAKAGE: Isolated neutral lead

Result: PASS

ESU load: None

Conditions: DISPERSIVE; R.Hand ctl; Std COAG 120W

Leakage: 88.1 mA

Limit:

100.0 mA

____________________________________________________________

HF LEAKAGE: Isolated active lead

Result: PASS

ESU load: None

Conditions: R.HAND OUTP; R.Hand ctl; Std COAG 120W

Leakage: 70.7 mA

Limit:

100.0 mA

____________________________________________________________

HF LEAKAGE: Isolated active lead

Result: PASS

ESU load: None

Conditions: L.HAND OUTP; L.Hand ctl; Std COAG 120W

Leakage: 70.1 mA

Limit:

100.0 mA

____________________________________________________________

HF LEAKAGE: Isolated active lead

Result: PASS

ESU load: None

Conditions: FS OUTPUT; Foot ctl; Std COAG 120W

Leakage: 68.4 mA

Limit:

100.0 mA

____________________________________________________________

HF LEAKAGE: Cross-coupling test

Result: PASS

ESU load: 200 ohms

Conditions: BIPOLAR to FS OUTPUT; MACRO 90W

Leakage: 0.0 mA

Limit:

20.0 mA

____________________________________________________________

Appendix A # Page 79

HF LEAKAGE: Cross-coupling test

Result: PASS

ESU load: 200 ohms

Conditions: BIPOLAR to L.HAND; MACRO 90W

Leakage: 0.0 mA

Limit:

20.0 mA

____________________________________________________________

HF LEAKAGE: Cross-coupling test

Result: PASS

ESU load: 200 ohms

Conditions: BIPOLAR to R.HAND; MACRO 90W

Leakage: 1.4 mA

Limit:

40.0 mA

____________________________________________________________

HF LEAKAGE: Cross-coupling test

Result: PASS

ESU load: 200 ohms

Conditions: L.HAND to FS OUTPUT; Std COAG 120W

Leakage: 11.1 mA

Limit:

50.0 mA

____________________________________________________________

HF LEAKAGE: Cross-coupling test

Result: PASS

ESU load: 200 ohms

Conditions: R.HAND to FS OUTPUT; Std COAG 120W

Leakage: 10.4 mA

Limit:

50.0 mA

____________________________________________________________

HF LEAKAGE: Cross-coupling test

Result: PASS

ESU load: 200 ohms

Conditions: R.HAND to L.HAND; Std COAG 120W

Leakage: 13.5 mA

Limit:

50.0 mA

____________________________________________________________

HF LEAKAGE: Cross-coupling test

Result: PASS

ESU load: 200 ohms

Conditions: R.HAND to L.BIP.; Std COAG 120W

Leakage: 32.1 mA

Limit:

48.0 mA

____________________________________________________________

HF LEAKAGE: Cross-coupling test

ESU load: 200 ohms

Conditions: R.HAND to L+R.BIP.; Std COAG 120W

Leakage: 1.5 mA

Limit:

48.0 mA

Result: PASS

END OF RECORD



References

Corel PDF Engine Version 15.0.0.431 PrintServer150