1. Introduction

Dynamic Power Management (DPM) is a smart function that allows users to recharge their electric vehicle using only the power available at home. It modulates the charging power and prevents power outages. If other appliances are used during charging, the system can modulate the charging power to the car, even temporarily suspending the charging session. Charging resumes at maximum power once other domestic appliances are switched off.

Load unbalance detection is a specific function for power management. According to relevant country-specific standards, the current unbalance among phases must not differ by more than a fixed value. This function prevents single-phase onboard chargers from drawing unbalanced current from the grid higher than prescribed by local regulations.

Do not attempt to install the Power Meter if you are not qualified as a professional electrician. Such actions can cause serious danger and harm to yourself and others, or damage to property and animals.

The wallbox can operate without Dynamic Power Management. In this case, installing a dedicated PowerMeter is not necessary, but avoidance of blackouts is not guaranteed.

Please refer to local regulations and the user and wallbox installer manuals available at www.esolutions.free2move.com/document-library/ for more information about the installation process.

Only Power Meters provided by Free2move eSolutions S.p.A. are compatible. Installation must be performed by qualified personnel in accordance with local regulations.

2. Energy Meter Installation

During installation, always refer to the meter installation manual included in the package.

  1. Place the Power Meter provided after the main utility meter and before the power split.
  2. For three-phase or single-phase electrical connection, refer to the dedicated meter installation manual included in the Power Meter package.
  3. Feed the Modbus communication cables through the eProWallbox box sheath (C). Suggested cable: STP class 5E, 0.5 mm² section.
  4. Connect the communication cables from the PowerMeter to the eProWallbox using the following order, starting from the left on the eProWallbox RS485 output port CN12:

Gavazzi EM330 Connection:

RS485 Port CN12:

Gavazzi EM111 Connection:

RS485 Port CN12:

Finder 7M Connection:

RS485 Port CN12:

5. If included, connect the Current Transformers as indicated in the meter installation manual. Pay attention to drawing the line through the clamp according to the direction indicated on the sensor. The neutral cable must not be drawn through the clamp.

2.1 Energy Meter Configuration

For Gavazzi Meters:

  1. Enter the menu by tapping and holding the central display button (or the lower part of the display for single-phase) for 1.5 seconds until the password page is shown. Skip to the next page by pressing both left and right (or upper and lower) display buttons.
  2. Tap the left (or upper for single-phase) display button to navigate the menu.
  3. To configure the Gavazzi Meter, enter the parameters by tapping and holding the central (or lower for single-phase) display button. Change parameters using the left (or upper for single-phase) button:
    • System mode: 3Pn (For three-phase meter only)
    • Device address: 1
    • BaudRate: 38.4 kbps
    • Parity bit: Even

For Finder Meters:

  1. Select the COMMUNICATION command (COMM on single-phase meter), press and hold to enter the menu. Set the following parameters:
    • Device address: 001
    • Bits per second (baud): 38400 bit/s
    • Parity: Even
    • Stop bit: 1
  2. In addition to the configuration described in point 4, for three-phase Finder Meters only, select INSTALLATION, press and hold to enter the menu. Set:
    • Connection mode: 3L+N "Arithmetic"

Do not attempt to install the Power Meter if you are not qualified as a professional electrician. Such actions can cause serious danger and harm to yourself and others, or damage to property and animals.

2.2 Parameters Configuration (Installers Only)

The final wallbox configuration after installation should be done via the dedicated PowerUp app. PowerUp is a smartphone app for qualified installers only, available via Google Play® and App Store®. It can be used to configure, monitor, and set the wallbox via a Bluetooth connection. The wallbox cannot operate correctly if not configured via the app according to the following instructions.

Follow the instructions below to get started with the app:

DPM Configuration via PowerUp App:

DPM Enabling: Click the toggle to activate the functionality.

DPM Pmax: Use the scrolling button to set the value of the user's contractual power.

DPM Type Selection: Select the installed Power Meter model from the drop-down menu. Only Power Meters compatible with the wallbox installation type will be shown.

Transformer Ratio KI: Set the Current Transformer ratio according to the values printed on the installed sensors. For example, for 100/5 A, Ki = 20.

Once the functionality is enabled, restart the wallbox using the dedicated button on the homepage to make the changes effective.

3. DPM User Configuration

Download the eSolutions Charging app, available for Android and iOS, which allows you to configure your wallbox and monitor operating parameters.

  1. Log in to the App and associate the wallbox with your profile by scanning the personal QR code printed on your wallbox, on the back of the external cover.
  2. Select the wallbox connected to the PowerMeter and go to settings. Then click on 'Home Power'.
  3. Set your Contractual Power value in kW as indicated on your electricity bill by moving the scroll button. This parameter allows the wallbox to determine the power value not to exceed.
  4. Click on 'DPM' to enable the Home Power functionality.

4. Load Unbalance

To enable the load unbalance function and configure the maximum current phase unbalance according to local regulations. This configuration is mandatory in the following countries:

The functionality is off by default. To activate it, click on the drop-down menu and select the current value according to the maximum allowable current unbalance between the phases. This value is 20A for Germany and 16A for Austria, Switzerland, and Netherlands.

Once the functionality is enabled, restart the wallbox using the dedicated button on the homepage to make the changes effective.

Models: Annex ePro Wallbox, Annex, ePro Wallbox, Wallbox

File Info : application/pdf, 11 Pages, 1.53MB

PDF preview unavailable. Download the PDF instead.

Annex Advanced Functionalities

References

Adobe InDesign 17.0 (Windows) Adobe PDF Library 16.0.3

Related Documents

Preview eProWallbox Installation Manual Annex: Advanced Functionalities Setup
This manual provides detailed instructions for setting up advanced functionalities on the eProWallbox, including DPM, DPM 2.0, and Load Unbalance configurations via Bluetooth using the nRF Connect app.
Preview PowerMeter Installation and User Manual - Free2move eSolutions
Comprehensive guide for installing and configuring the PowerMeter by Free2move eSolutions, including Dynamic Power Management (DPM) features for electric vehicle charging.
Preview eProWallbox Move Safety and Installation Guidelines | Free2Move eSolutions
Essential safety instructions and installation guidelines for the Free2Move eSolutions eProWallbox Move EV charger. Covers electrical safety, qualified personnel, circuit protection, and proper disposal.
Preview ProWallbox Move User Manual - EV Charging Station Guide
Comprehensive user manual for the Free2move eSolutions ProWallbox Move electric vehicle charging station. Learn about installation, operation, features, and maintenance for safe and efficient EV charging.
Preview eProWallbox Safety Instructions for Installation and Maintenance
Essential safety instructions for installing and maintaining the eProWallbox EV charging solution. Covers electrical safety, qualified personnel, protection against overcurrent and overvoltage, and proper disposal.
Preview Supernova 60 & 180 Installation Guide
This guide provides comprehensive instructions for the installation of the Supernova 60 and 180 fast charging stations. It covers everything from initial setup, site preparation, mechanical and electrical installation, to final checks and safety precautions. Designed for electricians and certified professionals, this document ensures correct and safe installation of eSolutions DC Chargers.
Preview ProWallbox Move Safety Instructions
This document provides essential safety instructions for the installation and maintenance of the ProWallbox Move, ensuring safe operation and compliance with electrical standards.