User Guide for Tigo models including: TSS-200A-US-G Automatic Transfer Switch, TSS-200A-US-G, Automatic Transfer Switch, Transfer Switch, Switch
& ation | Tigo Energy
File Info : application/pdf, 2 Pages, 1.20MB
DocumentDocumentEI Residential Solar Solution Quick Start Guide EI ATS 200A Use this Quick Start Guide (QSG) in conjunction with the Tigo EI Inverter QSG. Detailed installation documentation for all Tigo products is available on the tigoenergy.com Downloads page. Order of Installation Install an EI system in this order: 1. Install TS4s and the Tigo Access Point (TAP) anytime before wiring the inverter. 2. Mount the ATS and connect it to the grid. To enable household power pending commissioning, use the ATS manual bypass feature described herein. Mount Enclosure 1. Locate the ATS enclosure: 2. In a well-ventilated, easily accessible location. 3. On a flat surface against a solid wall with 15° tilt. 4. Sheltered from direct sunlight and precipitation. >12in 15° 3. Mount the inverter and E-Stop rapid shutdown switch. 4. Place the battery. 5. Wire communications and power connections. You must install communications connections. 6. Commission the system. Ambient temperature should not exceed 50°C. 5. Away from antennas or other sources of strong electromechanical interference. 6. Above potential flooding. >12in >12in Power Connections Use non-fine-stranded wire with ferrules. Torque terminals to 22.5Nm. ATS to Load and Grid 1/0 4/0 AWG EI Inverter to ATS 8 6 AWG L1 L2 L1 L2 G N G N L1 N L2 ATS Inverter Connection Points Inverter communications terminals Manual bypass jumper Generator start signal terminals Inverter AC terminals Neutral busbar Ground busbar L1 L2 N G · All components must be installed and maintained by qualified personnel in accordance with applicable electrical codes. · Always wear appropriate PPE and use insulated tools. · Improper installation may cause damage not covered by the warranty. Manual bypass switch 200A service disconnect Generator and load terminals Grid terminals Neutral busbar Ground busbar Generator battery maintenance terminal ATS to Generator (TSS-200A-US-G only) 4 1/0 AWG L1 L2 G N L1 N G Whole home: to main panel Partial home: to essential loads panel Whole home: to grid Partial home: to main panel To generator battery charger (120VAC 12 10 AWG) To generator power EI Residential Solar Solution Quick Start Guide EI ATS 200A Communications Connections Inverter RS-485 RS-485 You must install the communication connection to the inverter. ATS ATS to Generator Start Switch TSS-200A-US-G only · All components must be installed and maintained by qualified personnel in accordance with applicable electrical codes. · Always wear appropriate PPE and use insulated tools. · Improper installation may cause damage not covered by the warranty. Status Indicators Use 2- and 3-pin plugs from the Accessories bag. If the left-most 2-pin socket is absent, disregard the 12V connection to ATS CN9 pins. Manual Bypass Switch Connects grid power to the home service panel while installing, servicing, or commissioning the system. To manually bypass the ATS: 1. Turn off TWO ATS breakers (service disconnect and inverter) and wait until no ATS LEDs show power. 2. Plug the 3-pin jumper (in the Accessories bag) with jumped pins 1 and 3 into the RSD+ and RSD- terminals. 3. Remove the black cover, turn the manual bypass switch to GRID, and restore power connections. To reverse the procedure, turn off all power connections, remove and save the jumper, and turn on the system. Do not manually turn the bypass switch back to INV. The switch resets automatically. For important detailed instructions, visit the Help Center How to Bypass the ATS 200A article. Commissioning Commission the system after double-checking all connections and installing the Tigo EI mobile app. 1. Turn on any disconnects and breakers between the grid and the ATS. 2. Ensure the E-Stop RSS initiator button is not engaged. 3. Turn the ATS Service disconnect and the inverter DC disconnect to ON. If the inverter does not start, force-start the battery by removing the start button cover and pressing until the green leaf status LED flashes rapidly. 4. Ensure Bluetooth is enabled on your mobile device, open the Tigo EI app, and tap + to create a new system. 5. Open Select Equipment, tap Scan, and select EI Inverter. This listing should match the CCA MAC ID serial number labeled on the left side of the inverter. 6. Complete the commissioning process in the Tigo EI app. For detailed instructions, visit the tigoenergy.com Help Center. Use 3-pin plug from the Accessories bag. Resources Symbol Action Continuous Grid Off Communications System Status Continuous Flashing .5s on/.5s off Continuous Flashing .5s on/.5s off Fault Off Flashing .5s on/.5s off 1s on/3s off Description Grid power on Grid power off Operating normally Error Operating on-grid Operating off-grid w/battery and/or generator Operating normally Fault present Loads > available power ©20230512 Tigo Energy, Inc. 002-00094-00 Rev. 6.3 Tigo Energy, Inc. 655 Campbell Technology Pkwy. Campbell, CA 95008 +1 408 402 0802 Help Center www.tigoenergy.com