SECTION B | INSTALLATION PART D – BLIND INSTALLATION STEP 1 – MARK &SECURE WIRE GUIDE FIXINGS AND TRIM WIRE TO SUIT Wire Centres BOX 19mm OPEN 18mm NOTE: Cut wire to assist installation (ensure wire is not cut too short, excess can be trimmed later)


File Info : application/pdf, 20 Pages, 1.20MB

PDF preview unavailable. Download the PDF instead.

Acmeda Wire Guide
N MANUAL m Up
Acmeda | WIRE GUIDE
INSTALLATION MANUAL

CONTENTS
SECTION A | TOOLS AND ADDITIONAL ITEMS REQUIRED 3
PART A ­ TOOLS REQUIRED ............................................................................................................................................ 3 PART B ­ ADDITIONAL ITEMS REQUIRED (NOT SUPPLIED).............................................................................................. 3 PART C ­ BLIND ITEMS REQUIRED................................................................................................................................... 3 PART D ­ BLIND ITEMS REQUIRED .................................................................................................................................. 4
SECTION B | INSTALLATION 5
PART A ­ PREPARING INSTALLATION SPACE ................................................................................................................... 5 PART B ­ BOX INSTALLATION.......................................................................................................................................... 6 PART C ­ OPEN BRACKET INSTALLATION ........................................................................................................................ 6 PART D ­ BLIND INSTALLATION....................................................................................................................................... 7 PART E ­ TENSION GUIDELINES .................................................................................................................................... 13
SECTION C | TROUBLESHOOTING 18

SECTION A | TOOLS AND ADDITIONAL ITEMS REQUIRED

PART A ­ TOOLS REQUIRED

·

Saw

·

Drill

·

Screw Driver ­ Philips Head & Flat Head

·

Jaw Pliers

·

Allen Key Set

·

Mallet

·

Scissors

·

Measuring Tape

·

Pencil

PART B ­ ADDITIONAL ITEMS REQUIRED (NOT SUPPLIED)

To assemble an Veue | Wire Guide, the following non-stocked items are required:

·

Fixings for Box/Open Brackets/Hardware (ensure appropriate fixings are used to suit application)

·

Trims to conceal packing (if required)

PART C ­ BLIND ITEMS REQUIRED

BOX

OPEN BRACKETS

or
NOTE: Store clip until required (can be left in adaptor as shown)
BLIND

Page. 3

SECTION A | TOOLS AND ADDITIONAL ITEMS REQUIRED
PART D ­ BLIND ITEMS REQUIRED
WIRE GUIDE AND FIXING HARDWARE
OPTION 1 ­ Hook Terminal

STRAP DOWN HARDWARE

SS SADDLE & SWIVEL EYE SHACKLE

DIAMOND EYE PAD

Page. 4

SECTION B | INSTALLATION
PART A ­ PREPARING INSTALLATION
STEP 1. - CHECK FOR OBSTRUCTIONS
Check for any obstructions that may interfere in installation.

STEP 2. - CHECK VERTICAL & HORIZONTAL INSTALLATION DIMENSIONS

VERTICAL DIMENSIONS

Check if top of installation space is level.
· If H1  H2, corrective actions may need to be considered prior to installation

HORIZONTAL DIMENSIONS

If W2  W1, W1=Blind Width (proceed to Part B)

Page. 5

If W2 < W1, by a value of: 0-20mm, Proceed to Part B (W1 = Blind Width) 20+, Consider corrective action to square installation space

SECTION B | INSTALLATION
PART B ­ BOX INSTALLATION
STEP 1 ­ INSTALL BOX TO WALL/CEILING
FACE FIX

SIDE FIX

TOP FIX

NOTE: Use appropriate fixings to suit application. Ensure Box is Aligned and Level. Ensure 2 fasteners are used per side.

PART D ­ OPEN BRACKET INSTALLATION

STEP 1 ­ INSTALL BRACKETS TO WALL/CEILING

FACE FIX

SIDE FIX

TOP FIX

NOTE: Use appropriate fixings to suit application. Ensure 2 fasteners are used per side. Ensure brackets are aligned and level. Measure brackets end to end to confirm measurement is correct.

Page. 6

SECTION B | INSTALLATION
PART D ­ BLIND INSTALLATION
STEP 1 ­ MARK &SECURE WIRE GUIDE FIXINGS AND TRIM WIRE TO SUIT

BOX OPEN

Wire Centres

19mm 18mm

NOTE: Cut wire to assist installation (ensure wire is not cut too short, excess can be trimmed later)

FLOOR FIX

FACE/SIDE FIX

FLOOR FIX
(OPTIONAL FOR SECURING TO MASONRY)

NOTE: Ensure fasteners suit substrate application Max fastener size #10, Max Dynabolt Size: M6
Page. 7

SECTION B | INSTALLATION
PART D ­ BLIND INSTALLATION
STEP 2 ­ INSERT SPRING ONTO WIRE
STEP 3 ­ ATTACH WIRE AND SPRING TO BRACKET
OPTION 1 ­ HOOK TERMINAL
NOTE: Tube hardware not shown for clarity of wire installation
Page. 8

SECTION B | INSTALLATION
PART D ­ BLIND INSTALLATION
STEP 4 ­ INSERT BLIND INTO BOX

STEP 5 ­ INSERT WIRE THROUGH WEIGHT BAR END CAP FLOATS

NOTE: · ·

Insert control end first Ensure blind is secure

STEP 6 ­ INSERT CLIP INTO IDLER ADAPTER
IDLER END

Page. 12

Ensure pin is clipped in securely

Tighten the Screw Page. 9

SECTION B | INSTALLATION
PART D ­ BLIND INSTALLATION
STEP 7 ­ FEED THROUGH MOTOR CABLE (FOR MOTOR ONLY)
STEP 8 ­ RUN BLIND DOWN + CENTRE
Page. 10

SECTION B | INSTALLATION
PART D ­ BLIND INSTALLATION
STEP 9 ­ TEST BLIND OPERATION
For motor operation, ensure wiring is correct and motor is operating correctly. For gear operation, ensure operation is smooth. Once blind is operating correctly, proceed to next steps.
Page. 11

SECTION B | INSTALLATION
PART D ­ LOCK OFF SS SADDLES & ATTACH DIAMOND EYE PAD
CLIPs ­ IF ORDERED STEP 1 ­ UNLOCK SADDLES AND SLIDE TO REQUIRED POSITION (SUGGESTED 100MM NOMINAL FROM END CAP), LOCK BOTH SADDLES TO THE BOTTOM RAIL
STEP 2 ­ ATTACH THE DIAMOND EYE PAD DIRECTLY BELOW SWIVEL EYE SHACKEL WITH APPROPRIATE SCREWS

SS SADDLE & SWIVEL EYE SHACKLE

DIAMOND EYE PAD

Page. 12

SECTION B | INSTALLATION
PART E ­ TENSION GUIDELINES
STEP 1 ­ SLIDE ADJUSTING SLEEVE THEN WIRE TERMINAL ONTO WIRE AND TIGHTEN UP OUT OF THE WAY
NOTE: Use 2mm Allen Key
Page. 13

SECTION B | INSTALLATION
PART E ­ TENSION GUIDELINES

STEP 2 ­ PULL WIRE STRAIGHT AND ALIGN TERMINAL FLANGE WITH M4 GRUB SCREW, CLAMP TO WIRE

FLOOR FIX

FACE/SIDE FIX

STEP 3 ­ TIGHTEN REMAINING GRUB SCREWS ON WIRE (TIGHTEN 3X GRUB SCREWS PER WIRE)

FLOOR FIX

FACE/SIDE FIX

NOTE: Use 2mm Allen Key

NOTE: Use 2mm Allen Key

STEP 4 ­ LOWER ADJUSTING SLEEVE INTO COLLAR TO TENSION WIRE
FLOOR FIX

FACE/SIDE FIX

Page. 14

SECTION B | INSTALLATION
PART E ­ TENSION GUIDELINES

STEP 5 ­ SCREW IN ADJUSTING SLEEVE UNTIL WIRE BEGINS TO TENSION

FLOOR FIX

FACE/SIDE FIX

STEP 6 ­ TO APPLY MIN REQUIRED TENSION, TIGHTEN WITH 5X TURNS USING ALLEN KEY

FLOOR FIX

FACE/SIDE FIX

STEP 7 ­ ONCE TENSIONED, SCREW IN GRUB SCREW TO PREVENT LOSING TENSION

FLOOR FIX

FACE/SIDE FIX

NOTE: Use 2mm Allen Key Page. 15

SECTION B | INSTALLATION
PART E TENSION GUIDELINES
STEP 1 ­ SWING BOX COVER INTO BOX TOP AND CLIP INTO PLACE
STEP 2 ­ SECURE COVER AT BOTH ENDS
Note: It is recommended that the Box Cover be fixed to ensure it is not accidentally dislodged. Page. 16

SECTION B | INSTALLATION
PART E­ TENSION GUIDELINES BOX
OPEN
Page.17

MOTORISATION For motorised awnings you may need a qualified electrician to trim and attach plug to the lead or hardwire. Program motor as per instructions: https://www.betta-blinds.com.au/installations.html A Cassette/Pelmet is recommended with motorised awnings to protect the motor from the elements. If no cassette has been ordered the awning will need to be installed where the motor can be protected from the elements. Motor warranty does not cover water damage.
Installing a Automate Rechargeable Battery Pack
The rechargeable Lithium-Ion battery pack enables Automate DCFT motor to operate wirelessly and without the constraints of traditional battery wands with disposable batteries.
FEATURES: Provides up to 6-12 months on a single charge (depends on shade size, fabric weight& usage) Battery pack fully recharges in ~ 7 hours. Battery health status reported in Automate Pulse App.
NOTE: If using a compatible external battery, please use the below steps. Battery must only be charged by Rollease Acmeda battery charger. Battery charger LED status: RED = Charging GREEN = Idle NOTE: Battery pack will only charge between 0-45°C Battery pack must be installed out of direct sunlight. Recommended to install the battery in a horizontal orientation to minimize the risk of water ingress. Ensure the battery is positioned away from direct contact with water or exposure to adverse weather conditions during installation.
1. First decide the best place to mount the battery pack, remembering to not install the pack in direct sunlight, horizontal position is recommended if possible.
2. Mark and drill 4mm holes for the battery pack clips, ideally space them 465mm apart.
3. Attach clips and click battery pack in place. 4. Drill a 14mm hole for motor cable. We recommend you have the motor cable come out of the side end plate, at the
back or the top of the casstte depending on the fit of the awning and where the battery is postioned. Page.18

5. Join motor cable and battery pack together, you are now ready to set the limits, please see instructions on setting limits.
Program motor as per instructions: https://www.betta-blinds.com.au/installations.html Mounting Options
Battery pack must be installed out of direct sunlight. Caution: Like all outdoor blinds, it is prudent to retract the blind in the presence of strong winds. Page.19

NO.

PROBLEM

Ripples along sides of fabric 1

2

Blind does not fully open / jams

Ripples along sides of fabric 3

CAUSE Blind rolled up for an extended period of time.

SOLUTION
This occurrence is inherent to roller systems and is more prevalent in some fabrics. Leave blind down for 1 ­ 4 hours; most ripples should disappear.

Not enough weight in weight bar.

Refer to Product Specs. Add ballast.

Installation is not square.

Check blind roll is installed level.

Fabric permanently damaged due to inadequate handling during assembly, transportation, installation or use.
Position of wire guides at base is incorrect.
Incorrect motor stop limits used.

Replace fabric and ensure it is handled with care.
Check if wire guide fixing at floor/base are positioned in line with the Top Terminal. If fixing is too far inwards of the terminal then reposition. Refer to Part C, Step 1 of this document for wire guide positioning details.
Refer to motor instructions to reset stop limits.

Blind roll is not level, thus weight bar ap- pears uneven.

Ensure blind is installed level.

Blind has been operated in excessive wind conditions.

Check blind roll when the blind is fully raised. If ripples are evident on roll, open blind fully (without the presence of wind) to allow the blind to track down evenly. Raise and lower blind a number of times to check operation.

Fabric is not installed straight.

Ensure fabric is assembled straight onto tube and weight bar.

4

Locks go out of sync

Locks are not level Uneven Weight Bar (see above)

Lower blind until fabric is slack then lift one side so that the lock disengages

Obstruction preventing weight bar lowering through lock

Remove obstruction to allow weight bar to reach its low- est point.