Installation Guide for Yakka Gear models including: 6.6m Reach, 8.6m, 6.6m Reach Aluminium Mobile Scaffold, 6.6m, Reach Aluminium Mobile Scaffold, Aluminium Mobile Scaffold, Mobile Scaffold, Scaffold
6.6m Reach Aluminium Mobile Scaffold | Yakka Gear Australia
Installation and User Guide Aluminium Wide Scaffolding: 2.5m x 1.3m & Aluminium Long Scaffold: 2.5m x 0.74m Applies to 2.5m x 1.3m Wide Scaffolding models purchased after 16 May 2024 1. Component introduction a) Brace: Distinguish by color of the hook. b) Toeboard: 2.5m and 1.3m for Wide, 2.5m and 0.7m for Long c) Platform: d) Frame wide: 0.7m for Long, 1.3m for Wide e) Adjustable Stabiliser f) Caster wheel: g) Ladder: h) Adjustable Ladder support 2. Installation Process for Wide Scaffold (Installation of Long Scaffold is similar) 2.1. Make sure the wheel brake is engaged before installation. Inset the 8 inches caster wheels (4 off) to 2.0m frame (2 off). Adjust the thread rod nut for desired wheel height. 2.2. Install the Horizontal brace (Blue) (2 off) to the bottom row of the frame. 2.3. Attach the Bottom brace (Black) (1 off) on top of the horizontal brace. 2.4. Install the Diagonal brace (Red) (2 off) to each side of the frame. Attach one end to the 4th row of the frame, and the other end to the 2nd row of the frame. Opposite on the other side. 2.5. Assemble 2.0m frame (2 off) and 2.0m frame (2 off) to 4.0m frame (2 off), and install on top of the existing frame and lock with D-pin. 2.6. Install the Diagonal braces (Red) (2 off). One end on the 7th row, the other on the 5th row. 2.7. Install the 2.5m platforms (2 off) to the 8th row. 2.8. Attach the Stabiliser to the vertical member (between the 5th and 6th row) of the frame (2 off for 6.6m and 4 off for 8.6m). Tighten the nut on the Locking bracket to secure the stabiliser to the frame. Adjustable leg for height adjustment. 2.9. Installed the Extendable ladder (1 off) into one of the openings on the platform. Hook the top on the 11th row of the frame. The ladder can be extended by pulling out the handle and slide. 2.10. Attach the Ladder support (1 off) with one end on the 2nd row, and the other end on the 3rd row of the ladder. Ladder support is extendable and can be locked by D-pin. 2.11. Installed the 2.5m Toeboard (1 off) around the platform. The board can be easily slot in place. 2.12. 2.13. Install additional Diagonal brace (Red) (2 off) to the frame, with one end on 9th row, and the others on 11th row. Install the Horizontal Brace (Blue) (4 off) to the 9th and 10th row of the frame. 2.14. 2.15. Install additional Diagonal brace (Red) (4 off) to the frame, with one end on 12th row, and the others on 14th row. Add the 1.2m Frame (2 off) on top. 2.16. Install the 2.5m Platform (2 off) to the 4th row from top. 2.17. Attach Extendable ladder (1 off) to the top row and ladder support to the 9th row of the frame. 2.18. Install the 2.5m Toeboard (1 off) 2.19. Install the Horizontal Brace (Blue) (4 off) to the top and 3rd from top row of the frame. 2.20. Finish by installing the Diagonal brace (Red) (2 off) connecting the top and 3rd from top row. 3. Installation Process for Long Scaffolding 3.1. Make sure the wheel brake is engaged before installation. Inset the 8 inches caster wheel (4 off) to the base of the 2.0m frame (2 off). Adjust the thread rod nut for desired wheel height. 3.2. Install the Horizontal brace (Blue) (2 off) to the first row of the frame. 3.3. Attach the Bottom brace (Black) (1 off) on top of the horizontal brace. 3.4. Install the Diagonal brace (Red) (2 off) to each side of the frame. Attach one end to the 5th row of the frame, and the other end to the 2nd row of the frame. Opposite on the other side. 3.5. Assemble 2.0m frame (2 off) and 1.2m frame (2 off) to 3.2m frame (2 off). Installed on top of the existing frame and lock with D-pin. 3.6. Install the 2.5m Platform (1 off) to the 6th row of the frame. 3.7. Attach the Stabiliser to the vertical member (between the 6th and 7th row) of the frame (2 off). Tighten the nut on the Locking bracket to secure the stabiliser to the frame. Adjustable leg for height adjustment. 3.8. Install the Diagonal braces (Red) (2 off). One end on the 8th row, the other on the 5th row. 3.9. Install the 2.5m Platform (2 off) to the 4th from top row. 3.10. Install the 2.5m Toeboard (1 off). 3.11. Install the Horizontal Brace (Blue) (4 off) to the top and 3rd from top row of the frame. WARNING Do NOT push or move the mobile scaffold when the wheels are locked. Doing so poses a severe risk to the user and can cause significant damage to the wheels. This action may also void the warranty. Do NOT place the mobile scaffold directly on inclined surfaces. Doing so poses a severe risk to the user and can cause significant damage to the wheels. This action may also void the warranty. Instead, fill the ground under the wheels to level the surface.Canva Canva