Installation Guide for RENOGY models including: RBC30 50D1S Fuse, RBC30 Fuse, 50D1S Fuse
DCC30S 12V DC-DC MPPT On-Board Battery Charger | Renogy
WARNING Please follow this instruction before using. RBC30/50D1S Fuse Installation Instructions Diagram of Fuse Connection Starter battery House battery Fuse specification from house battery to the charger a 30A charger equipped with a 40A fuse a 50A charger equipped with a 60A fuse Fuse installation instructions Firstly, connect the negative terminal of the house battery to the OUTterminal of the charger, and make sure all the terminals are tight. Secondly, connect the positive terminal of the house battery to one end of the fuse box, and then connect the other end of the fuse box to the OUT+ terminal of the charger, and make sure all the terminals are tight. Finally, connect the negative terminal of the starter battery to the charger, and then connect the positive terminal of the starter battery to the charger, and make sure all the terminals are tight. NOTE The fuse must be installed on the positive side of the circuit. Fuse box operation diagram Installation tool description Prepare a No. 14 wrench (M8) for tightening copper ring terminals. Installation wire diameter instructions 30A charger: prepare a 10AWG wire for the output terminal, the length is 1-5m. 50A charger: prepare a 6AWG wire for the output terminal, the length is 1-5m. 2021.12.1Adobe PDF library 10.01