PRO Engineers 360° Rotating Dual-Camera Endoscope System
Catalogue and Quick Start Guide
Introduction
Please read the manual carefully before operating the system. Please charge the battery before using.
This document provides essential information for the PRO Engineers 360° rotating dual-camera endoscope system, including safety guidelines, parts identification, and initial setup instructions.
Safety and Notice
Warning: To avoid electrical shock, use the item indoors when charging. ⚠️
Warning: Use only the specified AC 110~240V input, DC 12.6V output charger. This system requires the original charger and lithium battery. Charging time is approximately 5 hours. Ensure the battery is charged before first use.
- Upon receipt, please check the appearance and functionality of the goods. Report any damaged or missing items with images within 3 working days to ensure after-sales service.
- The camera system operates optimally within a working environment of -10°C to 50°C (14°F to 122°F) with up to 95% relative humidity. The storage environment should be between -20°C to 70°C (-4°F to 158°F) with up to 95% relative humidity.
- The warranty is void if physical damage occurs due to user mishandling, force majeure, system disassembly, or the use of non-factory parts.
- Utilize only original accessories to mitigate potential risks to health and property and to comply with all applicable legal regulations.
- Keep the controller dry.
- Avoid dropping, knocking, or shaking the inspection system. Improper handling can damage internal electronic components or the lens shape.
- Confirm all accessories are securely connected before powering on the system.
- Do not remove or install the camera while the machine is powered on. If camera replacement is necessary, ensure the unit is powered off first.
Parts List
Accessories
Item | Description | Optional |
---|---|---|
Camera Head |
| Standard |
Controller |
| Standard |
Sun visor |
| Standard |
Hose line |
| Standard |
Charger |
| Standard |
Waterproof Ring |
| Standard |
Manual | User Manual | Standard |
Suitcase |
| Standard |
Controller Layout
The controller unit features a 7-inch display and various control buttons for operation.
Button # | Function |
---|---|
1 | 7-inch display |
2 | Pan-left ⬅️ |
3 | Pan-right ➡️ |
4 | On/Off ⏻ |
5 | Power-on indicator |
6 | Dual camera switching |
7 | Down ⬇️ |
8 | Menu ☰ |
9 | Image flip |
10 | Light brightness up ?⬆️ |
11 | Light brightness down ?⬇️ |
12 | UP ⬆️ |
13 | DC JACK |
Quick Start Guide
2.1. Battery Charging
Follow these steps to charge the controller battery:
- Remove all accessories from the packaging.
- Connect the AC adapter to a compatible 100-220V power outlet.
- Connect the charger's plug to the controller's DC jack.
- The charging indicator light will turn green upon completion of the charging cycle.
2.2. Connection
Connect the system components as follows:
- Connect the hose line's aviation connector to the designated socket on the controller.
- Securely install the camera head onto its corresponding connector.
- Attach the sunshade to the controller's display for improved visibility.
Important Precautions:
- Verify the integrity of the camera's waterproof ring before installation. ✔️
- Avoid gripping the rotatable part of the camera when installing it. ❌
2.3. Starting Up
- Power On/Off: Press and hold the power button for approximately 3 seconds to turn the system on or off.
- Camera Panning: Use the left and right pan controls to maneuver the camera head.
- Camera Switching: Press the C1 and C2 buttons to toggle between the front-facing and side-facing cameras.
- Adjusting Light: Utilize the dedicated buttons to control the illumination level of the camera's LEDs.
Contact Information
PRO Engineers
Address: B604, Viceroy, S.N. Dube Road, Dahisar East, Mumbai 400068, Maharashtra, India.
Phone: 022-4960-3019 | Mobile: +91-97684322828 / +91-9136198760
Email: sales@proengineers.in
Website: www.proengineers.in