User Manual for PYLONTECH models including: US3000 Rechargeable Li-ion Battery, US3000, Rechargeable Li-ion Battery, Li-ion Battery

基本 CMYK

Rechargeable Li-ion Battery US3000 Product Manual

1 / 23 19BQSV0102 1. Safety Precautions Reminding 1) It is very important and necessary to read the user manual carefully (in the accessories) before installing or using battery.

Pylontech


File Info : application/pdf, 27 Pages, 2.09MB

PDF preview unavailable. Download the PDF instead.

20221020132250 0142
Rechargeable Li-ion Battery US3000 Product Manual
Information Version: 2.1

This manual introduces US3000 from Pylontech. Please read this manual before you to install the battery and follow the instruction carefully during the installation process. Any confusion, please contact Pylontech immediately for advice and clarification.
Contents
1. SAFETY PRECAUTIONS........................................................................................................................... 1
1.1 Before Connecting...................................................................................................................1 1.2 In Using........................................................................................................................................1
2. INTRODUCTION ..................................................................................................................................... 3
2.1 features:.....................................................................................................................................3 2.2 Specifications ............................................................................................................................3 2.3 Equipment Interface Instruction .............................................................................................5 US3000 Product Front Interface ...................................................................................................5 Definition of RJ45 Port Pin ..............................................................................................................6 Definition of RJ11 Port Pin .............................................................................................................. 7 LED Indicators Instructions .............................................................................................................8
3. SAFE HANDLING OF LITHIUM BATTERIES GUIDE ...................................................................................9
3.1 Schematic Diagram of Solution ............................................................................................ 9 3.2 Explanation of Symbol .............................................................................................................9 3.3 Tools..........................................................................................................................................10 3.4 Safety Gear..............................................................................................................................10
4. INSTALLATION ..................................................................................................................................... 11
4.1 Package Items ........................................................................................................................11 Unpacking and check the Packing List ....................................................................................11 4.2 Installation Location ...............................................................................................................12 Installation ......................................................................................................................................13 A. Put battery modules into cabinet and connect the cables..........................................13 B. Power On ................................................................................................................................15 C. Installation with bracket .......................................................................................................16 D. Multiple Battery Groups CAN/RS485 Communication Cable Connection .................20
5. TROUBLE SHOOTING STEPS ................................................................................................................. 22
5.1 Problem determination based on: ......................................................................................22 5.2 Preliminary determination steps: ..........................................................................................22 5.3 The battery cannot be charged or discharged................................................................22
6. EMERGENCY SITUATIONS ................................................................................................................... 23

1. Safety Precautions
Reminding
1) It is very important and necessary to read the user manual carefully (in the accessories) before installing or using battery. Failure to do so or to follow any of the instructions or warnings in this document can result in electrical shock, serious injury, or death, or can damage battery, potentially rendering it inoperable.
2) If the battery is stored for long time, it is required to charge them every six months, and the SOC should be no less than 90%;
3) Battery needs to be recharged within 12 hours, after fully discharged; 4) Do not expose cable outside; 5) All the battery terminals must be disconnected for maintenance; 6) Please contact the supplier within 24 hours if there is something abnormal. 7) Do not use cleaning solvents to clean battery; 8) Do not expose battery to flammable or harsh chemicals or vapors; 9) Do not paint any part of battery, include any internal or external components; 10) Do not connect battery with PV solar wiring directly; 11) The warranty claims are excluded for direct or indirect damage due to items above. 12) Any foreign object is prohibited to insert into any part of battery.

Warning
1.1 Before Connecting
1) After unpacking, please check product and packing list first, if product is damaged or lack of parts, please contact with the local retailer;
2) Before installation, be sure to cut off the grid power and make sure the battery is in the turned-off mode;
3) Wiring must be correct, do not mistake the positive and negative cables, and ensure no short circuit with the external device;
4) It is prohibited to connect the battery and AC power directly;

19BQSV0102

1 / 23

5) The embedded BMS in the battery is designed for 48VDC, please DO NOT connect battery in series;
6) Battery system must be well grounded and the resistance must be less than 1 ; 7) Please ensured the electrical parameters of battery system are compatible to related
equipment; 8) Keep the battery away from water and fire.
1.2 In Using
1)If the battery system needs to be moved or repaired, the power must be cut off and the batteryis completely shutdown;
2) It is prohibited to connect the battery with different type of battery. 3) It is prohibited to put the batteries working with faulty or incompatible inverter; 4) It is prohibited to disassemble the battery (QC tab removed or damaged); 5) In case of fire, only dry powder fire extinguisher can be used, liquid fire extinguishers are
prohibited; 6) Please do not open, repair or disassemble the battery except staffs from Pylontech or
authorized by Pylontech. We do not undertake any consequences or related responsibility which because of violation of safety operation or violating of design, production and equipment safety standards.

2 / 23

19BQSV0102

2. Introduction
US3000 lithium iron phosphate battery is one of new energy storage products developed and produced by Pylontech, it can be used to support reliable power for various types of equipments and systems. US3000 is especially suitable for application scene of high power, limited installation space, restricted load-bearing and long cycle life. US3000 has built-in BMS battery management system, which can manage and monitor cells information including voltage, current and temperature. What's more, BMS can balance cells charging and discharging to extend cycle life.
Multiple batteries can connected in parallel to expand capacity and power in parallel for larger capacity and longer power supporting duration requirements.
2.1 features: The whole module is non-toxic, non-polluting and environmentally friendly;
Cathode material is made from LiFePO4 with safety performance and long cycle life;
Battery management system (BMS)has protection functions including over-discharge, over-charge, over-current and high/low temperature;
The system can automatically manage charge and discharge state and balance current and voltage of each cell;
Flexible configuration, multiple battery modules can be in parallel for expanding capacity and power
Adopted self-cooling mode rapidly reduced system entire noise; The module has less self-discharge, up to 6 months without charging it on shelf, no memory effect, excellent performance of shallow charge and discharge;
Working temperature range is from -10 to 50 , (Charging 0~50 ; discharging -10~50 ) with excellent discharge performance and cycle life;
Small size and light weight, standard of 19-inch embedded designed module is comfortable for installation and maintenance;

19BQSV0102

3 / 23

2.2 Specifications

Basic Parameters Nominal Voltage (V) Nominal Capacity (Wh) Usable Capacity (Wh) Dimension (mm) Weight (Kg) Discharge Voltage (V) Charge Voltage (V) Recommend rat e Pow er(kW)/ Current (A) Max. Pow er(kW)/ Current (A) Peak Pow er(kW)/ Current (A) Bat t ery Max. Fault y Current (A) Communication
Working Temperature
Shelf Temperature Protective class Cooling type IP rating of enclosure Humidity Certification Design life Cycle Life Reference to standards
*The Scope of Product Certification does not include external cabinets.
4 / 23

US3000 48
3552 3200 442*420*132
32 45 ~ 53.5 52.5 ~ 53.5 1.8 / 3 7 3 .5 5 / 74 4 .8 / 10 0 @15 S
3200 RS485, CAN 0~50 Charge -10~50 Discharge -20~60
IP20 Natural Cooling
IP20 5% ~ 85% IEC62619/ CE / UN38.3 10+ Years (25/77) >6,000 25 IEC62619, IEC62040, IEC62477-, IEC61000-6-2,IEC61000-3,
UN38.3, UL1973
19BQSV0102

2.3 Equipment Interface Instruction This section details the front and back panel of the interface functions.
US3000 Product Front Interface

Power Switch Power Switch: to turn ON/OFF the whole battery BMS standby, no power output.
ON/OFF ON/OFF light: green LED lighting to show the Power Switch is ON, and the BMS has electricity (No power output).
RUN
RUN light: green LED lighting to show the battery running status
Alarm Alarm light: red LED flashing to show the battery has alarm, and lighting to show the battery is under protection.

SOC SOC light: 6 green LEDs to show the battery's current capacity.

Start Start Button: press more than 0.5s to start the battery module, Power output ready.

ADD Switch

ADD Switch: 4 ADD switches, Dip1 to definite different baud rate (0 is 115200,

1

1 is 9600). "0"and"1", refer to picture right. "0XXX" setup the baud rate

0 115200, and "1XXX" setup the baud rate 9600. The settings will be active

only after restart the battery.

19BQSV0102

5 / 23

The slave battery's address will be assigned automatically. 1 master battery can supervise 7

slave batteries (maximum 8 batteries in each battery group). Multiple battery groups should

setup the master batteries' ADD switch. (Refer to Chapter 4 / D)

Dip2 Dip3 Dip4

Group Address Number

0

0

0 0th: Single battery group's master battery should setup as this.

1

0

0 1st: 1st battery group's master battery should setup as this.

0

1

0 2nd: 2nd battery group's master battery should setup as this.

1

1

0 3rd: 3rd battery group's master battery should setup as this.

0

0

1 4th: 4th battery group's master battery should setup as this.

1

0

1 5th: 5th battery group's master battery should setup as this.

0

1

1 6th: 6th battery group's master battery should setup as this.

1

1

1 7th: 7th battery group's master battery should setup as this.

Console Console Communication Terminal: (RJ11 port) follow RS232 protocol (Baud Rate: 1200), for manufacturer or professional engineer to debug or service.

CAN CAN Communication Terminal: (RJ45 port) follow CAN protocol (Baud Rate: 500K), for output batteries information.

RS485 R485 Communication Terminal: (RJ45 port) follow RS485 protocol (Baud Rate: 9600 or115200), for output batteries information.

Link Port 0, 1

Link Port 0, 1 Communication Terminal: (RJ45 port), for communication between multiple

parallel batteries.

Definition of RJ45 Port Pin

No.

RS485Pin

1

RS485 B

2

RS485 A

3

--

4

--

5

--

6

GND

7

RS485A (recommend)

8

RS485B (recommend)

CAN Pin --
GND --
CANH CANL
----

6 / 22

19BQSV0102

Definition of RJ11 Port Pin
No. 1 2 3 4

232 Pin GND TXD RXD GND

Power Terminals Power cable terminals: there are two pair of terminals with same function, one connect to equipment, the other one paralleling to other battery module for capacity expanding. For each single module, each terminal can achieve charging and discharging function. For power cables uses water-proofed connectors. It must keep pressing this Lock Button while pulling out the power plug. Dry Contact Terminal
Dry Contact Terminal: provided 1 way input and 3 ways output dry contact signal.
LED Status Indicators
RUN Lamp (No.6 Figure 2-1): green, long lighting when charging and flash when discharging;
ALM Lamp (No.7 Figure 2-1 7): red, flashes when alarm and long bright if equipment failure or protected;
Battery capacity indicator (No.8 Figure 2-1): 6 green lamps, each light represent 16.6% capacity.

19BQSV0102

7 / 23

LED Indicators Instructions

Condition

RUN ALR 1

2

3

4

5

6

Power off

-

-

-

-

-

-

-

-

Power on

Idle/Normal

-

-

-

-

-

-

-

Charge

Show soc; highest LED flash -
on: 0.5s; off 0.5s

Discharge

Show soc

Alarm

ALR: ; Other LEDs are same as above.

System -
error/Protect

-

-

-

-

-

/

ON

flash, on: 0.3s; off: 3.7s

/

flash, on:0.5s; off: 1.5s

BMS function:
Protection and Alarm Charge/Discharge End Charge Over Voltage Discharge Under Voltage Charge/Discharge Over Current High/Low Temperature(cell/BMS)
Short Circuit Power Cable Reverse

Management and Monitor Cells Balance
Intelligent Charge Model Charge/Discharge Current Limit Capacity Retention Calculate
Administrator Monitor Operation Record

8 / 23

19BQSV0102

3. Safe handling of lithium batteries Guide
3.1 Schematic Diagram of Solution

PV ARRAY

INVERTER (1)

(2)
Public Grid

BATTERY MODULE

Local Load

3.2 Explanation of Symbol

* Do not disconnect or disassemble by non-professional personnel. * Do not drop, deform, impact, cut or spearing with a sharp object. * Do not place at a children or pet touchable area. * Do not place near open flame or flammable material. * Do not cover or wrap the product case. * Do not sit or put heavy things on battery. * Do not touch the leaking liquid. * Avoid of direct sunlight. * Avoid of moisture or liquid. * The product Ingress Protection (IP) class is IP20. * Make sure the grounding connection set correctly before operation. * Follow the product manual to make wiring connection. * If leaking, fire, wet or damaged, switch off the breaker on DC side and
stay away from battery. * Contact your supplier within 24 hours if anything failure happens.

19BQSV0102

9 / 23

3.3 Tools The following tools are required to install the battery pack

Wire cutter

Crimping Modular Plier

Screw Driver

NOTE Use properly insulated tools to prevent accidental electric shock or short circuits. If insulated tools are not available, cover the entire exposed metal surfaces of the available tools, except their tips, with electrical tape.

3.4 Safety Gear It is recommended to wear the following safety gear when dealing with the battery pack

Insulated gloves

Safety goggles

Safety shoes

10 /23

19BQSV0102

4. Installation
4.1 Package Items Unpacking and check the Packing List 1) For battery module package: Two power cables and one communication cable for each battery package:
180
180
210
Grounding cable: 1000
Grounding cables use 10AWG yellow-green cables. US3000 modules' grounding is based on metal directly touch between the module's surface and rack's surface. So it needn't grounding cables at all. If uses normal rack, it can remove the paint at the corresponding place.
Or install a grounding cable to the grounding point of the modules.

19BQSV0102

11 / 23

2) For Battery system connects to inverter: Two long power cables (current capacity 120A) and one communication cable for each energy storage system:
2000
2000
3500
NOTE These three long cables are belonging to External Cable Kit, NOT in battery package. They are in another extra small cable box. If there is anything missed please contact dealer.

12 / 23

19BQSV0102

4.2 Installation Location
Make sure that the installation location meets the following conditions: The area is completely water proof. The area is flat and level with a maximum altitude of 2000m. There are no flammable or explosive materials. The ambient temperature is within the range from 0°C to 50°C. The temperature and humidity is maintained at a constant level. There is minimal dust and dirt in the area. The distance from heat source is mo. re than 2 meters The distance tfrom air ou.tlet of inverter is more than 0.5 meters. The M inimum clearance t o bat t ery module(rack) is more t han 0 .5 met ers. Do not place at a children or pet touchable area. The installation area shall avoid of direct sunlight. There is no mandatory ventilation requirements for battery module,but please avoid of installation in confined area.The aeration shall avoid of high salinity, humidity or temperature.
CAUTION If the ambient temperature is outside the operating range, the battery pack stops operating to protect itself. The optimal temperature range for the battery pack to operate is 0°C to 50°C. Frequent exposure to harsh temperatures may deteriorate the performance and life of the battery pack.
Installation
A. Put battery modules into cabinet and connect the cables:

19BQSV0102

13 / 23

Put the battery into the cabinet; (the cabinet is optional item for installation) Drive the 4 pcs screws; Connect the cables between battery modules Connect the cables to inverter
NOTE
In Aust ralia an overcurrent and DC isolat ion device is required f or bot h posit ive and negat ive
conduct ors bet w een invert er and bat t ery.

14 / 23

19BQSV0102

B. Power on Double check all the power cable and communication cable. (1) Switch power on Switch on all the battery modules:
(2) The one with empty Link Port 0 is the Master Battery Module, others are slaves (1 master battery configure with maximum 7 slave batteries):

19BQSV0102

15 / 23

(3) Press the red button of master battery to power on, all the battery LED light will be on one by one from the Master battery:

If all the battery LED lights on, and then off, which means the battery system is good and working.
Power off
1 Turn external power source off. 2) Press Red SW switch of master battery. Then all batteries will off. 3) Switch Power switch OFF.
C. Installation with bracket:

16 / 23

19BQSV0102

19BQSV0102

17/ 23

Aim at the 4 pare of Location Pin and Location Hole, stack the batteries together. And hasp the 4 agraffes together.

18 / 23

19BQSV0102

Maximum 4 batteries can be athwart stacked One or two batteries can be sidelong stacked

Cables connection and batteries system start are same as cabinet installation.

19BQSV0102

19/ 23

NOTE After installation, do not forget to register online for full warranty:
http://www.pylontech.com.cn/service/support
NOTE To avoid current pulse of the inverter add on the battery bank. Shall start inverter first or switch on breaker between battery and inverter after all connected batteries turned on. Between battery bank and inverter should install breaker to protect system safety. All the installation and operation must follow local electric standard.
D. Multiple Battery Groups CAN/RS485 Communication Cable Connection

20 / 23

19BQSV0102

19BQSV0102

21 / 23

5. Trouble Shooting Steps
5.1 Problem determination based on: 1) Whether the battery can be turned on or not; 2) If battery is turned on, check the red light is off, flashing or lighting; 3) If the red light is off, check whether the battery can be charged/discharged or not.
5.2 Preliminary determination steps: 1) Battery cannot turn on, switch on the lights are all no lighting or flashing. If the battery external switch is ON, the RUN light is flashing, and the external power supply voltage is 48V or more, the battery still unable to turn on, please contact distributor.
2) The battery can be turned on, but red light is lighting, and cannot charge or discharge. If the red light is lighting, that means system is abnormal, please check values as following:
a) Temperature: Above 50 or under -10 , the battery could not work. Solution: to move battery to the normal operating temperature range between -10 and 50
b) Current: If current is greater than 100A, battery protection will turn on. Solution: Check whether current is too large or not, if it is, to change the settings on power supply side.
c) High Voltage: If charging voltage above 54V, battery protection will turn on. Solution: Check whether voltage is too high or not, if it is, to change the settings on power supply side.
d) Low Voltage: When the battery discharges to 44.5V or less, battery protection will turn on. Solution: Charge the battery for some time, the red light turn off
Excluding the four points above, if the faulty is still cannot be located, turn off battery and repair.
5.3 The battery cannot be charged or discharged 1) Cannot be charged: Disconnect the power cables, measure voltage on power side, if the voltage is 53~54V, restart the battery, connect the power cable and try again, if still not work, turn off battery and contact distributor . 2) Unable to discharge: Disconnect the power cables and measure voltage on battery side, if it is under 44.5V, please charge the battery; if voltage is above 48V and still cannot discharge, turn off battery and contact distributor.

22 / 23

19BQSV0102

6. Emergency Situations
1) Leaking Batteries If the battery pack leaks electrolyte, avoid contact with the leaking liquid or gas. If one is exposed to the leaked substance, immediately perform the actions described below. Inhalation: Evacuate the contaminated area, and seek medical attention. Contact with eyes: Rinse eyes with flowing water for 15 minutes, and seek medical attention. Contact with skin: Wash the affected area thoroughly with soap and water, and seek medical attention. Ingestion: Induce vomiting, and seek medical attention. 2) Fire NO WATER! Only dry powder fire extinguisher can be used; if possible, move the battery pack to a safe area before it catches fire. 3) Wet Batteries If the battery pack is wet or submerged in water, do not let people access it, and then contact Pylontech or an authorized dealer for technical support. 4) Damaged Batteries Damaged batteries are dangerous and must be handled with the utmost care. They are not fit for use and may pose a danger to people or property. If the battery pack seems to be damaged, pack it in its original container, and then return it to Pylontech or an authorized dealer.
NOTE Damaged batteries may leak electrolyte or produce flammable gas. In case a damaged battery needs recycling, it shall follow the local recycling regulation (ie. Regulation (EC) Nº 1013/2006 among European Union) to process, and using the best available techniques to achieve a relevant recycling efficiency.
Any further questions, please contact Pylontech: service@pylontech.com.cn

19BQSV0102

23 / 23

7. Remarks
Recycle and disposal.
In case a battery (normal condition or damaged) needs disposal or needs recycling, it shall follow the local recycling regulation (i.e. Regulation (EC) Nº1013/2006 among European Union) to process, and using the best available techniques to achieve a relevant recycling efficiency.
Storage, Maintenance and Expansion
1) It is required to charge the battery at least once every 6 months, for this charge maintenance make sure the SOC is charged to higher than 90%
2) Every year after installation. The connection of power connector, grounding point, power cable and screw are suggested to be checked. Make sure there is no loose, no broken, no corrosion at connection point. Check the installation environment such as dust, water, insect etc. make sure it is suitable for IP20 battery system. 3) A new battery module can be added onto an existing system at any time. Please make sure the new battery is acting as the master. The new module, due to a higher SOH may have a difference on SOC with existing system, but it will not affect the parallel connection system performance.
32

Pylon Technologies Co., Ltd. No. 73, Lane 887, ZuChongzhi Road, Zhangjiang Hi-Tech Park Pudong, Shanghai 201203, China T +86-21-51317699 | F +86-21-51317698 E service@pylontech.com.cn W www.pylontech.com.cn



References

Acrobat Distiller 9.3.3 (Windows)