User Guide for owon models including: 80A-120A-200A-500A-750A, PC311-Z-TY Single-Phase Power Clamp, PC311-Z-TY Power Clamp, PC311-Z-TY Clamp, Power Clamp, Clamp, PC311-Z-TY, Single-Phase Power Clamp

Download of Manual

China Tuya ZigBee Two PhaseS Power Meter PC 311-Z-TY (80A/120A/200A/500A/750A) factory and manufacturers | Owon Technology

PC311-Z-TY Single-Phase Power Clamp - OWON Smart

3 1 Get to know your device Reset Button The terminal corresponds to the color of the connected wire L: Connect to Red wire of AC cable N: Connect to Black wire of AC cable 1-: Connect to Black wire of CT1 2-: Connect to Black wire of CT2 1 : Connect to White wire of CT1 2 : Connect to White wire of CT2 CT: Current Transformer LED indicator CT1 CT2 AC cable

[PDF] PC311-Z-TY Single-Phase Power Clampwww.owon-smart.com › uploads

PDF preview unavailable. Download the PDF instead.

Quick-Start-Guide-PC311-Z-TY-Single-Phase-Power-Clamp-230629
Smart Life App
PC311-Z-TY Single-Phase Power Clamp
Quick Start Guide

Technical Specifications

Wireless Connectivity

ZigBee

· 3.0

RF Characteristics

· Operating frequency: 2.4GHz · Internal antenna

Physical Specifications

Operating Voltage

· 90~250 Vac 50/60 Hz

·  100W ( Within ±2W ) Calibrated Metering Accuracy · >100W ( Within ±2% )

Reporting Cycle

· Every one minute

Operating environment

· Temperature: -20 ~ +55  · Humidity:  90% non-condensing

Dimension

· 51.6(L) x 23.3(W) x 46(H) mm

2

1 Get to know your device

CT: Current Transformer

LED indicator

Reset Button

AC cable

CT1

CT2

The terminal corresponds to the color of the connected wire

N: Connect to Black wire of AC cable

L: Connect to Red wire of AC cable

1-: Connect to Black wire of CT1 1+: Connect to White wire of CT1 2-: Connect to Black wire of CT2 2+: Connect to White wire of CT2
3

Mounting bracket

Reset Button · Reset. Press and hold the reset button for 5 seconds until the LED indicator flashes Red 3 times quikly to clear network information (energy data will not be cleared). After that, the LED indicator will blink Red and wait for joining ZigBee network. · Clear Energy Data. Reset the Power Clamps twice consecutively The interval between two reset must be less than 10S. After successful operation, the indicator light will flashe alternately red and green 3 times.

LED indicator The LED status gives the following information of the power clamp:

LED Status Green LED solid on

What it means Device has joined a ZigBee network.

Red LED blinking

Device has not joined a ZigBee network.

4

Get started: Please make sure the main main breaker is off before installing! 1. Open the clamp to see the arrow (P1P2) or (KL) or you can find it on the sticker on the outside of the clamp. This is the direction of CT. The CT support bi-directional sensing. If the direction of the CT is opposite to the direction of the current, the power will be negative.
2. Connect AC Input cable to a socket near the Electrical Box to power on the Power Clamp according to the wiring diagram. And apply the CT on the electric cable and ensure the direction of CT is correct when installing in different scenarios:
5

·To measure energy consumption
The arrow on the clamp should face to the correct direction of the electricity current flows like CT1 in the wiring diagram. In this case, the power will be positive, and the energy consumption will be accumulated.

Circuit Breaker

PC311
Circuit 1 Circuit 2 N L 1- 1+ 2- 2+

Load

L

N

Load

L

N

L N
Wiring diagram
Note: When installing, please ensure that the circuit measured by CT is in the same phase as the circuit powered by PC311.
6

·To measure energy generation
The arrow on the clamp should face to inverter like CT2 in the wiring diagram. In this case, the direction of the current is opposite to that of the CT. The power will be negative, and the energy generation will be accumulated.

Circuit Breaker

PC311
Circuit 1 Circuit 2 N L 1- 1+ 2- 2+

Load

L

N

Inverter (DC/AC)

L

N

L N
Wiring diagram Note: When installing, please ensure that the circuit measured by CT is in the same phase as the circuit powered by PC311.
7

·To measure 'From Grid' or 'To Grid'
To monitor how much energy is pulling from and sending back from the grid, install the CT on the leads coming from your mains like the CT1 below. Note: When installing, please ensure that the circuit measured by CT is in the same phase as the circuit powered by PC311.

Grid Circuit Breaker

PC311
Circuit 1 Circuit 2 N L 1- 1+ 2- 2+

Load

L

N

Inverter (DC/AC)

L

N

KL

KL L N
Wiring diagram For CT1: If the measured current direction is K  L, the energy consumption is accumulated as `From Grid' energy. If the measured current direction is L  K, the energy generation is accumulated as `To Grid' energy.
8

2 Mounting
The Power Clamp has a mounting bracket for mounting purposes. You can choose the following two mounting methods: · Use the mounting bracket as template to mark the two holes on the wall for installing screws. Screw the mounting bracket onto the wall according to marked location. Install wall plugs if necessary. · Sliding the mounting bracket through one end of the Din-Rail if you want to fix on the Din-Rail. After the bracket is installed, snap the Power Clamp onto the bracket.
9

3 Configure Network
Download App Please download the application: Smart Life from App Store or App Market. Also you can scan below QR code to download and install.
1. Open Smart Life app and click the 'Scan' button in the upper right corner of the App Home page.

2. Scan the following QR code to configure the network.
10


Adobe PDF Library 16.0.7 Adobe InDesign 17.3 (Macintosh)