Real Stone Tall Triple Fountain Kit

Installation Manual

For use with Tall Triple Stone Column Fountains with Support Stands

Included in this Kit:

Blue Thumb makes installation of your triple column stone fountain kit easy by following these instructions.

Subscribe to our YouTube channel, BlueThumbINC, for related informational videos.

Diagram showing all components of the kit: tubing, pump, basin, grate, support stand, flow control valve, and pebbles.
STEP 1: Choose Location for Basin

1a Locate your fountain near your preferred viewing area where both water and electricity services are accessible. Be certain to avoid underground utilities.

1b Clear the area and prepare to excavate by tracing the fountain basin using marking paint.

STEP 2: Excavation of Basin Area

2a Using a shovel dig 90 degrees into the ground, slightly wider and just as deep as the fountain basin making sure to remove any sharp rocks or roots.

2b NOTE: If installing a splash apron, make sure the basin is about 2" below grade, allowing you to slope the surrounding terrain toward the basin.

IMPORTANT: Level the bottom of the hole across the entire basin, add sand or small gravel if needed. Tamp to ensure no settling occurs after installation. Check again to make sure the center is level with the edges.

Image showing a person leveling the ground inside the excavated hole.
Image showing a person tamping the ground in the excavated hole.
STEP 3: Set Basin in Place

Position the basin within the hole. Make sure the pump opening in the grate is orientated near electrical service.

If installing the splash apron, set basin in the hole and verify that the basin top is level and approximately 2” below grade.

Image showing a basin being placed in a hole and leveled.
STEP 4: Level

Using a level, ensure the fountain basin remains level side to side. The basin should sit solidly on the compacted and leveled ground below. Hanging the lip of the basin on the surface can cause the basin center to buckle.

Optional Auto Fill Kit Install: If a Blue Thumb Elite Auto Fill Kit (Item: #ABDAUTO) is being incorporated, you will want to bury your water supply line and make any Auto Fill connections at this time.

Image showing a basin being leveled with a level tool.
STEP 5: Backfill

Backfill around the box and soil using excavated soil or self-compacting material, such as sand or pea gravel. When using excavated soil be sure to regularly compact with a tamper.

If your basin included a cardboard cover leave it in place while you backfill to prevent soil from falling into the basin.

Note: The more solid the soil is around and below the reservoir, the less shifting over time from settling and rain.

Image showing backfilling around the basin with soil and compacting it.
STEP 6: Important Before Filling your Basin

Once Achelous Basin is in place, clean basin area of any lose dirt. Remove cardboard and vacuum out any dirt that may have fallen into the basin then wipe clean before adding water. Keep that pump happy with a clean basin full of clear water!

You may fill your basin with clean water at this point to stabilize the basin, or you may wait until your fountains are in place.

NOTE: Normal evaporation is about 1-2” weekly, however, that is dependent on your region. Many factors including humidity, rainfall, wind, and splash will determine exactly how frequently you need to refill.

Regarding Grate Orientation

The two halves of the grate may look nearly identical on the top and bottom, but be sure to identify the top side, which features a lip where the Pump Access Cover rests. The grate halves are designed to meet over two support columns, ensuring maximum strength. An additional PVC center support may be included for added stability.

Diagram showing the grate with labels for "Cord Notch in Access Cover", "Lip for the cover", and "Basin Notch".
STEP 7: Fountain Placement

If helpful, you may place grates and temporarily set fountains. The fountains can be as close together or as far apart as you like. We recommend a “Y” pattern using the elongated holes for best strength and stability.

A Support Stand will come with any stone fountain 36” or taller. Note the length and width of the base plate when determining fountain spacing.

Diagram showing a support stand for rock columns, with dimensions 8", 12", and 12".
STEP 8: Basin Screen Prep

Lay the screen over the basin grates and cut holes in the screen according to your fountain positioning.

Image showing a screen being placed over the basin grate with holes cut.

Tubing is in fixed lengths of 8', 7', and 5'. These lengths correspond to the height of the water features with the longest hose going to the tallest fountain.

STEP 9: Connect Pump Plumbing

On the Triton Assembly there are 3 barbed connectors with flow control valves. Two keys (red or blue) are used to adjust each individual fountain's water flow.

9a Slide each 3/4” tubing onto a barbed connector keeping in mind the hose lengths and your chosen fountain orientation.

9b Attach 90° elbow Discharge Assembly to the pump.

9c Slide the Triton 3-way splitter valve with tubing onto the discharge assembly and tighten the hose clamps.

Image showing the flow control valve keys.
Image showing a person connecting tubing to a barbed connector.
Image showing the 90° elbow discharge assembly attached to the pump.
Image showing the Triton 3-way splitter valve connected.
STEP 10: Install 1st Half of Grate and Place PVC Support

10a Lay grate/cover on the basin. It should sit firmly in the basin notch. Place the PVC Center support under this grate in the center of the basin. This support provides additional strength with heavier fountains and direct point loads.

10a Set pump assembly in the basin, notice how the tubing has room to curl around in the basin before being directed up through the grate.

10b Make sure the tubing has no kinks or twists, which can cause a reduction in water flow, and possibly no flow at all.

Image showing the PVC center support placed under the grate.
Image showing the pump assembly in the basin with tubing routed.
STEP 11: Pull Tubing and Place 2nd Half of Grate

Pull all three tubing pieces through the grate so they extend about 12" or so above the basin. Make sure the tubing sizes correlate to your chosen finished fountain column set up before placing the second grate half.

Put the screen over the tubing matching the holes you have cut as shown above.

At this point the stone fountain column installation will depend on if stand is needed (Steps 12A) and plume lights were purchased (Steps 12B).

Image showing tubing pulled through the grate.
12A: Stone Column Installation Without Lighting

Placing Fountain Columns on Basin

12Aa If shorter than 36”, the fountain will not need a support stand and the tubing will be slid up the fountain column without a stand, then follow directions with a stand.

12Ab If 36" or taller, the fountain column will need the provided support stand for added stability. Slide the stone column onto the stand.

Image showing a fountain column being slid onto a support stand.

12Ac Gently Lay stone column and stand on the basin with the base near the appropriate tubing length and close enough to stand directly over the tubing.

12Ad Feed the correct length of tubing from the bottom to the top of the column, ensuring that it extends 1-2 inches past the top. This extra length will make securing the tubing with the O-ring easier.

Image showing a stone column and stand being placed on the basin.
Image showing tubing being fed up through the stone column.
STEP 12A - Continued

12Ae Carefully stand the column upright, ensuring the hose is not pinched underneath. Any excess tubing can be fed back into the basin.

Repeat process with the remaining column fountains.

Image showing a person carefully standing the column upright.
Secure Tubing with O-Ring on Each Fountain

12Af Slide the 1” tubing extension over the 3/4” tubing. Making sure the tops are even.

12Ag Push excess tubing back into the basin so it sits just below the top of the fountain surface. The o-ring will hold the tubing in place.

12Ah Push excess tubing back into the basin so it sits just below the top of the fountain surface. The o-ring will hold the tubing in place. The tubing should just extend to the inside of the fountain without being visible.

Image showing a 1" tubing extension being slid over the 3/4" tubing.
Image showing excess tubing being pushed back into the basin.
Image showing the o-ring holding the tubing in place.
12B - Installation With Lighting Kit

Lighting Placement During Stand Installation

No O-ring or 1”extender is needed when a lighting kit is installed. The columns have been drilled to fit the Plume Lights perfectly. Follow these instruction to run light cords down the fountain and through the column stand.

12Ba Slide the stone column onto the stand. Slip the power end of the cord though the top of the fountain. You may feel the cord catch on the stand. Simply wiggle cord until it passes through.

12Bb Hold the light cord from top and bottom. Gently lay stone column and stand on the basin with the base near the appropriate tubing length and close enough to stand directly over the tubing.

12Bc While holding the light cord, feed the correct length of tubing from the bottom to the top of the column, ensuring that it extends 1-2 inches past the top.

Image showing a stone column with a light cord being threaded through it.
Image showing a stone column and stand being placed on the basin with the light cord.
Image showing tubing being fed up through the column with the light cord.
12Bd

Carefully stand the column upright, ensuring the hose is not pinched underneath.

12Be Pull excess Light Cord and lay on the grate screen.

12Bf Connect tubing firmly to the Barbed Connector.

12Bg Gently press light and excess tubing into fountain so the light sits just below opening.

12Bh At the fountain base, pull the Light Cords and lay on top of the grate screen. Direct cords to the Splitter (See light kit for detailed lighting instructions.) Repeat with other two fountains.

Image showing a person standing the column upright.
Image showing excess light cord being pulled onto the grate screen.
Image showing tubing connected to the barbed connector.
Image showing light and tubing being pushed into the fountain opening.
Image showing light cords laid on the grate screen at the fountain base.
Step 13: Testing & Flow Adjustment

13a If you haven't already added water to the fountain basin, add water until the basin is filled to the bottom of the grates. Plug in the pump cord to test your fountain.

Set the water flow and plume height by adjusting the valves with the provided red valve key attached to your pump assembly. Use the included plastic shims to level the fountains for even water flow over the columns.

Splash should be kept to a minimum to avoid excessive refilling. Our optional Auto Fill Kit, (ABDAUTO) is used to keep the water level topped off with minimal maintenance checks.

13b Note: Although not entirely necessary, for added security the stand plate may be screwed into the basin cover. Screws are not included in this kit.

Image showing the pump assembly with water flow adjustment valves.

Note: Shims are included to help stabilize your fountains if needed. This is especially useful when lighting is installed, as the fountains may sit unevenly on the light cords. Simply adjust with the shims to ensure a level and secure placement.

Step 14: Landscape Finish

Cover your basin with Polished Pebbles and surround with your favorite foliage. Avoid placing soil or bark on the grate because it may fall through the screen into the basin and affect water flow.

ENJOY!

We'd love for you to share your new fountain with us and future customers on our social media platforms!

Visit us at: www.shopbluethumb.com

Follow us on Facebook: facebook.com/bluethumbinc

Maintenance

General Fountain and System Maintenance

Winterizing:

Spring Start-Up:

If you need replacement parts please contact Blue Thumb directly at 888-619-3474 or email us at sales@bluethumbponds.com.

Image showing an Auto Fill Kit #ABDAUTO.
Image showing Muck Buster® #PB2682.
Image showing Algae D-Solv® #PB2002.
Models: 1 lug 2025, 1-iyl 2025, 1-iyl 2025 Real Stone Tall Triple Fountain Kit, Real Stone Tall Triple Fountain Kit, Stone Tall Triple Fountain Kit, Tall Triple Fountain Kit, Triple Fountain Kit, Fountain Kit

File Info : application/pdf, 8 Pages, 931.90KB

PDF preview unavailable. Download the PDF instead.

real stone triple kit installation ?srsltid=AfmBOooEUeMhAcNvJgzx5imlW89BrEvptskNzhotSkkkCTI6EnR2w9CZ

References

Adobe InDesign 20.3 (Macintosh) Adobe PDF Library 17.0

Related Documents

Preview Blue Thumb Real Stone Tall Triple Fountain Kit Installation Manual | Step-by-Step Guide
Comprehensive installation manual for the Blue Thumb Real Stone Tall Triple Fountain Kit. This guide provides step-by-step instructions for site selection, basin excavation and setup, plumbing, optional lighting installation, splash apron fitting, fountain placement, testing, and maintenance. Includes tips for winterizing and spring start-up.
Preview Blue Thumb 5-Column GFRC Basalt Fountain Kit Installation Manual
Comprehensive installation manual for the Blue Thumb 5-Column GFRC 'Basalt' Fountain Kit, detailing basin setup, plumbing, fountain placement, and maintenance. Includes steps for installation and winterizing. Compatible with LA7500.
Preview Blue Thumb Triple Handcrafted Basalt Column Fountain Kit Installation Manual
Comprehensive installation manual for the Blue Thumb Triple Handcrafted Basalt Column Fountain Kit, including step-by-step instructions, maintenance tips, and troubleshooting advice.
Preview Blue Thumb DIY Handcrafted Rock Fountain Kits Installation Manual
Installation manual for Blue Thumb DIY Handcrafted Rock Fountain Kits, including steps for placement, digging, leveling, backfilling, pump installation, grate and screen setup, bubbler rock attachment, filling, testing, and maintenance.
Preview Blue Thumb Triple Brass Spouted Urn Fountain Kits Installation Manual
Comprehensive installation manual for Blue Thumb's Triple Brass Spouted Urn Fountain Kits, including setup, plumbing, and maintenance instructions for various urn styles and optional lighting.
Preview Blue Thumb 2025 Retail Master Catalog: Your Source for Unique Water Features
Explore the comprehensive Blue Thumb 2025 Retail Master Catalog, your ultimate guide to creating stunning water features. Discover fountains, ponds, waterfalls, and water garden solutions crafted from GFRC, natural stone, and metal, alongside essential pumps, lighting, and treatments. Serving the aqua community for over 25 years.
Preview Blue Thumb Warranty Information for Ponds and Water Features
Comprehensive warranty details for Blue Thumb products including plastics, pumps, fountains, and lighting fixtures. Information on returning goods and in-warranty claims.
Preview Blue Thumb 2025 Retail Master Catalog: Your Source for Unique Water Features
Explore the 2025 Retail Master Catalog from Blue Thumb, featuring a comprehensive range of products for ponds, waterfalls, and fountains. Discover handcrafted rock, real stone, granite, millstone, vases, copper-metal features, Formal Falls®, pond-less waterfalls, and pond kits. Learn about installation, maintenance, and how Blue Thumb products enhance landscapes and profitability for professionals.