Hold Monitor Arm 25
This manual provides step-by-step instructions for the correct mounting of the Hold Monitor Arm. Please read and follow the instructions carefully. Contact us if any steps are unclear.
Important Notes:
- The product's loading capacity is based on the monitor's center of gravity being less than 3 cm from the VESA interface end.
- Loading capacity may be reduced if the monitor size exceeds 26 inches or its thickness is greater than 5.5 cm.
Parts and Tools
- Arm (A) x1
- Pad (B) x1
- Clamp (C) x1
- Pole (D) x1
- Screws (E) x4
- Plastic Covers (F) & (G) x1 each
- Screws (H) x4
- Cable Clips (I) x2
- Cable Tie (K) x1
- Allen Key (L) x1
- Allen Key (M) x1
- Allen Key (N) x1
Step 1: Clamp Installation
Adhere pad (B) to the bottom side of the clamp (C). If necessary, adjust the clamp height using Allen Key (N). Secure the clamp to the table using the handle. The clamp can be adjusted for table thicknesses between 12-86 mm.
Step 2: Pole Mounting
Mount the pole (D) onto the clamp using screws (E) and Allen key (M). Complete the assembly with plastic covers (F) and (G).
Step 3: Monitor Attachment
Attach the monitor arm (A) to the monitor using all four screws (H).
Step 4: Joint Adjustment
Use Allen key (M) to loosen the left screw completely. Then, tighten the right screw to a maximum torque of 10 ± 1 Nm. Adjust the monitor's angle and secure its position by re-tightening the screw to a maximum torque of 10 ± 1 Nm. The joint should now be rigid.
Step 5: Arm Placement and Height Adjustment
Insert the arm with the attached monitor onto the pole. Adjust to the desired height using the plastic handle.
Optional: To lock the position of the first arm, use Allen key (L) until the screw grips the pole (D).
Optional: Using Allen key (M), tighten the remaining joints to lock the position of the arms.
Step 6: Cable Management
Finish the installation by routing the monitor cables through the cable guides on the arms. Attach the cable clips (I) onto the pole. Use the cable tie (K) to organize cables as needed.