Agilent G5589AA Bravo Metabolomics Sample Prep Platform Installation Checklist

Agilent G5589AA Bravo Metabolomics Sample Prep Platform-Installation Checklist

Issued: 30 April 2019, Revision: 1.1

Introduction

Thank you for purchasing an Agilent G5589AA Bravo Metabolomics Sample Prep Platform. This checklist is used by the installing engineer to ensure that the platform is installed correctly, upgraded, and functioning as designed in your facility. This checklist will be completed at the end of the service and provided to you as a record of the installation.

Customer Information

Customers should provide all necessary operating supplies upon request of the engineer. The instrument is shipped with the sufficient consumables necessary to establish the functionality of the platform.

Service Engineer's Responsibilities

  • Only complete/printout pages that relate to the system being installed.
  • Complete empty fields with the relevant information.
  • Complete the relevant checkboxes in the checklist using a [x] or tick mark [x] in the checkbox.
  • Complete Not Applicable check boxes to indicate services not delivered, as needed.
  • Complete the Service Review section together with the customer.

Additional Instruction Notes

  • Follow the unpacking instructions specified in the Bravo Platform Unpacking Guide (part number G5523-90000), which is attached to the shipping container.
  • Save the packing materials and shipping container in case you are required to move or ship the device. Packing the Bravo Platform using other materials might damage the device and void your warranty.
  • The following guides are required to install the platform:

System Information

Guidance: [ ] Check this box if an instrument configuration report is attached instead of completing the table.

Instrument system name and ID
Instrument system site and location
List component product and part numbers List the serial numbers of each component
1. 1.
2. 2.
3. 3.
4. 4.
5. 5.
6. 6.
7. 7.
8. 8.
9. 9.
10. 10.

General Preparation

  • Verify that the Site Preparation Checklist has been followed and fully completed. Verify that the installation location meets the site requirements.
  • Unpack/verify the condition and completeness of shipment. For discrepancies, use the table below.
  • Refer to Bravo Platform Unpacking Guide (part number G5523-90000) for instructions on how to unpack the Bravo device.
Product or part description Observation Action*

*If you have questions about what action to take, contact https://fsg-assist.chem.agilent.com

  • Discuss any specific questions or issues with the customer prior to starting.
  • Note: For questions about the installation configuration, contact the Agilent Product Specialist.
  • Discuss any configuration options with the customer prior to starting.
  • Check for required service note applicability and firmware updates if connecting to instruments.
  • If applicable, check that the customer-supplied PC/Laptop meets the minimum requirements.
  • Upgrades only – Ensure with customer that instrument control settings, data, methods, and so forth, have been properly saved or archived prior to starting any installation procedures.
  • Measure the main outlet line voltage VAC.

Installation Task #1 - Hardware Installation

Refer to the G5589AA Bravo Metabolomics Sample Prep Platform Installation Guide (part number G5589-90005) for instructions for the following tasks.

  • [ ] Connect the Agilent-supplied computer.
  • [ ] Connect the Bravo power cord, emergency-stop pendant, and Ethernet cable.
  • [ ] Install the following platepads at the specified Bravo deck locations:
    • 6 standard platepads (deck locations 1, 3, 5 and 7–9)
    • 1 short platepad (deck location 2)
  • [ ] Connect the Ethernet cable to the controlling computer.
  • [ ] Install the Heating Shaking Station (deck location 4) and the Inheco STC Controller.
  • [ ] Install the Filter Plate Holder (deck location 6).
  • [ ] Install the Vacuum Filtration Station (deck location 2).
  • [ ] Install and manually configure the ME4C NTVARIO Vacuum Pump.
  • [ ] Install the liquid-handling head. For instructions, see the G5562A, G5563A Bravo Platform Safety and Installation Guide.

Installation Task #2 Software and Accessory Setup

See the Bravo Metabolomics Sample Prep Platform Installation Guide for the following tasks.

  • [ ] Turn on computer and set up the computer LAN.
  • [ ] Install the VWorks Software.
  • [ ] Install the Bravo Metabolomics Workbench.
  • [ ] Turn on the Bravo Platform and set up the Bravo device in the VWorks software. (Do not start up the Bravo Metabolomics Workbench until after you have set up the device in the VWorks software and set the teachpoints.)
  • [ ] Turn on the Inheco STC Controller and the VARIO pump for the Vacuum Filtration Station.
  • [ ] Open the VWorks device file and verify the Bravo profile settings.
  • [ ] Initialize the profile in Bravo Diagnostics.
  • [ ] Observe the head as it homes and moves above deck location 5.
  • [ ] Verify that the indicator lights on the Bravo front panel change colors correctly.
  • [ ] Verify the Bravo profile deck configuration and accessories.
  • [ ] Test the accessories using the Diagnose Accessory feature to ensure proper functioning.
  • [ ] Test that the emergency-stop pendant functions properly.
  • [ ] Set the teachpoints for the liquid-handling head. Save the profile.
  • [ ] In the Gripper tab, set the gripper y-axis offset. Test the pick-and-place feature in fast and slow mode to ensure that the gripper operation is correct. Ensure good gripping is possible and no abnormal sounds are present. Save the profile.

Installation Task #3 - Final Verification and Safety Equipment

Refer to the G5589AA Bravo Metabolomics Sample Prep Platform Installation Guide (part number G5589-90005) for the following:

  • [ ] Secure the vacuum manifold base at deck location 2.
  • [ ] Install the Light Curtain, emergency-stop pendant, and shields. See the Bravo Platform Safety and Installation Guide (part number G5562-90001).
  • [ ] Close the VWorks software if it is open.
  • [ ] Start up the Bravo Metabolomics Workbench.
  • [ ] Test the safety equipment following the instructions in the Bravo Metabolomics Sample Prep Installation Guide.
  • [ ] Perform a test run of the Reagent Transfer utility and the Off-site Plasma Metabolite Extraction application to verify the setup.

Service Review

  • [ ] Attach available reports/printouts to this documentation.
  • [ ] Record the time/date of installation or upgrade completion in the customer's records/logbook.
  • [ ] Complete the Service Engineer Comments section below if there are additional comments.
  • [ ] Review the installation/upgrade with the customer.
  • [ ] Explain Agilent warranty for instruments and PMs.
  • [ ] Explain how to access the:
    • User guides in the Literature Library in the Bravo Metabolomics Workbench.
    • VWorks context-sensitive help (Knowledge Base), and how to access the online VWorks Knowledge Base.
  • [ ] Explain how to get self-help, FAQs from the web.
  • [ ] Explain how to log an instrument service call, support services available.
  • [ ] If the Instrument firmware was updated, record the details of the change in the Service Engineer's Comments box below or if necessary, in the customer's IQ records.

Service Engineer Comments (optional)

If there are any specific points you wish to note as part of performing the installation or other items of interest for the customer, please write in this box.

Service Completion

Service request number: Date service completed:

Agilent signature: Customer signature:

Number of pages in this document:

Document part number: G5589-90008

PDF preview unavailable. Download the PDF instead.

Agilent G5589AA-Bravo Metabolomics Installation Checklist Microsoft Word for Office 365 Microsoft Word for Office 365

Related Documents

Preview Agilent G5541A NGS Bravo Option A Installation Checklist
Installation checklist for the Agilent G5541A NGS Bravo Option A, ensuring correct installation and functionality of the instrument and associated systems.
Preview Agilent 34980A Multifunction Switch/Measure Unit User's Guide
Comprehensive user guide for the Agilent 34980A Multifunction Switch/Measure Unit, detailing its features, operation, and connectivity for data acquisition and measurement control systems. Explore its capabilities for signal routing, switching, and precise measurements.
Preview Agilent LC and LC/MS: Your Essential Resource for Columns & Supplies
Explore Agilent's comprehensive range of LC and LC/MS systems, columns, and supplies designed to maximize performance and deliver quality results. Discover solutions for various analytical applications.
Preview Agilent Infiniium 90000 Series Oscilloscopes Programmer's Reference
A comprehensive programmer's reference guide for the Agilent Infiniium 90000 Series Oscilloscopes, detailing commands for various functions, interfaces, and programming conventions.
Preview Agilent 4072A/4073A Parametric Tester Installation Guide
This installation guide provides detailed instructions for setting up and verifying the Agilent 4072A and 4073A Advanced Parametric Testers, covering system cabinet installation, component mounting, software setup, and safety procedures.
Preview Agilent GC, GC/MS, and ALS Site Preparation Guide
This guide provides essential site preparation information for the installation of Agilent Gas Chromatographs (GC), Gas Chromatograph-Mass Spectrometers (GC/MS), and Automatic Liquid Samplers (ALS). It details space, power, gas, and environmental requirements to ensure successful and timely setup.
Preview Agilent Technologies G1313A/G1329A Sample Transport Assembly Troubleshooting Guide
Comprehensive troubleshooting guide for Agilent Technologies G1313A and G1329A Sample Transport Assemblies, covering intermittent lock-ups, jittery movement, and alignment issues with step-by-step solutions and part numbers.
Preview Agilent 5100 and 5110 ICP-OES Site Preparation Guide
This guide provides essential information for preparing your laboratory site for the installation of Agilent 5100 and 5110 Inductively Coupled Plasma Optical Emission Spectrometry (ICP-OES) systems. It covers safety practices, environmental requirements, electrical specifications, gas supply needs, workbench considerations, and shipping details to ensure a smooth and successful setup.