Instruction Manual for DOMETIC models including: 640315.30X Air Conditioner Roof Top Unit, 640315.30X, Air Conditioner Roof Top Unit, Conditioner Roof Top Unit, Roof Top Unit
DOMETIC 640315.30X (01) PDF MANUAL - MANUAL-HUB.COM
File Info : application/pdf, 11 Pages, 1.14MB
DocumentDocumentRECORD THIS INFORMATION FOR FUTURE REFERENCE: Model Number Serial Number ADB Model Number ADB Serial Number Date Purchased USA SERVICE OFFICE Dometic Corporation 1120 North Main Street Elkhart, IN 46514 For Service Center Assistance Call: Please Visit: www.Dometic.com Description Air Conditioner Roof Top Unit Model Use With Air Distribution Box Model Single Zone LCD Electronic Control Kit 640312 3107561.XXX 640315 3313189.000 Cool/Furn White 3313189.015 Cool/Furn Black This Unit is designed for OEM installation. INSTALLATION INSTRUCTIONS MODEL 640312.30X 640315C35X 640312C35X 640315.80X 640312.80X 640315.83X 640312.83X 640315.84X 640312C85X 640315C85X 640315.30X REVISION A Form No. 3314438.000 8/18 (French 3314732.000_A) ©2018 Dometic Corporation LaGrange, IN 46761 Read these instructions carefully. These instructions MUST stay with this product. https://manual-hub.com/ INTRODUCTION This air conditioner (hereinafter referred to as "unit" or "product") is designed and intended for installation on the roof of a Recreational Vehicle (RV) during the time it is manufactured. This unit can be installed by one person with brief help from additional personnel. Use the following procedure to ensure a properly installed, and properly functioning product. Dometic, LLC reserves the right to modify appearances and specifications without notice. TABLE OF CONTENTS INTRODUCTION ..................................................................................................................................................................2 DOCUMENT SYMBOLS.......................................................................................................................................................2 IMPORTANT SAFETY INSTRUCTIONS ............................................................................................................................3 A. Recognize Safety Information ...................................................................................................................................3 B. Understand Signal Words..........................................................................................................................................3 C. Supplemental Directives............................................................................................................................................3 D. General Safety Messages .........................................................................................................................................3 SPECIFICATIONS ................................................................................................................................................................4 A. Table - Unit Data........................................................................................................................................................4 B. Roof Requirements....................................................................................................................................................4 INSTALLATION PROCEDURE............................................................................................................................................5 A. Choosing Proper Location For Unit ...........................................................................................................................5 B. Roof Preparation .......................................................................................................................................................5 C. Wiring Requirements .................................................................................................................................................6 D. Choosing Thermostat Location..................................................................................................................................6 E. Thermostat and Thermostat Cable Installation..........................................................................................................6 F. Placing Unit On Roof .................................................................................................................................................7 G. Installation Preparation..............................................................................................................................................7 H. Wiring System ...........................................................................................................................................................8 I. Installing Unit .............................................................................................................................................................9 J. Air Distribution Box Installation..................................................................................................................................9 WIRING DIAGRAM............................................................................................................................................................. 11 A. Unit Wiring Diagram ................................................................................................................................................ 11 B. Single Zone LCD Electronic Control Kit Cool/Furn Wiring Diagram ........................................................................ 11 DOCUMENT SYMBOLS Indicates additional information that is NOT related to physical injury. Indicates step-by-step instructions. 2 https://manual-hub.com/ IMPORTANT SAFETY INSTRUCTIONS This manual has safety information and instructions to help users eliminate or reduce the risk of accidents and injuries. A. Recognize Safety Information This is the safety alert symbol. It is used to alert you to potential physical injury hazards. Obey all safety messages that follow this symbol to avoid possible injury or death. B. Understand Signal Words C. Supplemental Directives Read and follow all safety information and instructions to avoid possible injury or death. Read and understand these instructions before [installing / using / servicing / performing maintenance] on this product. Incorrect [installation / operation / servicing / maintaining] of this product can lead to serious injury. Follow all instructions. A signal word will identify safety messages and property damage messages, and will indicate the degree or level of hazard seriousness. The installation MUST comply with all applicable local or national codes, including the latest edition of the following standards: indicates a hazardous situation that, if NOT avoided, could result in death or serious injury. indicates a hazardous situation that, if NOT avoided, could result in minor or moderate injury. is used to address practices NOT related to physical injury. U.S.A. ANSI/NFPA70, National Electrical Code (NEC) ANSI/NFPA 1192, Recreational Vehicles Code CANADA CSA C22.1, Parts l & ll, Canadian Electri- cal Code CSA Z240 RV Series, Recreational Vehicles D. General Safety Messages Failure to obey the following warnings could result in death or serious injury: This product MUST be [installed / serviced] by a qualified service technician. Do NOT modify this product in any way. Modification can be extremely hazardous. Do NOT add any devices or accessories to this product except those specifically authorized in writing by Dometic, LLC. 3 https://manual-hub.com/ SPECIFICATIONS A. Table - Unit Data Model No. 640312.30X 640312C35X 640312.80X 640312.83X 640312C85X 640315.30X 640315C35X 640315.80X 640315.83X 640315.84X 640315C85X Nominal Capacity (BTU HR) Cooling Electrical Rating 120 Vac 60 Hz 1 ph Compressor Rated Load Amps Compressor Locked Rotor Amps Fan Motor Rated Load Amps Fan Motor Locked Rotor Amps 11,000 10.5 53.0 3.5 10.0 11,000 10.5 53.0 3.5 10.0 11,000 11.5 53.0 2.6 8.5 11,000 12.5 63.0 2.6 8.5 11,000 11.5 53.0 2.6 8.5 13,500 12.5 61.0 3.5 10.0 13,500 12.5 61.0 3.5 10.0 13,500 12.6 63.0 2.6 8.5 13,500 12.5 63.0 2.6 8.5 13,500 12.5 63.0 3.5 8.5 13,500 12.6 63.0 2.6 8.5 Refrigerant R-410A (Oz) 19.0 19.0 20.0 18.0 20.0 17.5 17.5 18.0 19.0 19.0 18.0 Minimum Wire Size* 12 AWG Copper Up to 24 AC Circuit Protection ***Installer Supplied 20 Amp 20 Amp 20 Amp 20 Amp 20 Amp 20 Amp 20 Amp 20 Amp 20 Amp 20 Amp 20 Amp Minimum Generator Size** 1 Unit / 2 Units 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW 3.5 kW / 5.0 kW * For wire length over 24 ft., consult the National Electrical Code for proper sizing. ** Dometic, LLC gives GENERAL guidelines for generator requirements. These guidelines come from experiences people have had in actual applications. When sizing the generator, the total power usage of your RV must be considered. Keep in mind generators lose power at high altitudes and from lack of maintenance. *** CIRCUIT PROTECTION: Time Delay Fuse or Circuit Breaker Required. B. Roof Requirements A 14-1/4 x 14-1/4 (±1/8) square opening (hereinafter referred to as "roof opening") is required for installing this unit. This opening is part of the return air system of the unit and must be finished in accordance with NFPA 1192. Roof construction with rafters/joists support frames on a minimum of 16 inch centers. Minimum of 2 inches and maximum of 4 inches distance between roof to ceiling of RV. 4 https://manual-hub.com/ INSTALLATION PROCEDURE A. Choosing Proper Location For Unit This unit is specifically designed for installation on the roof of a recreational vehicle (RV). When determining your cooling requirements, the following should be considered: Size of RV; Window area (increases heat gain); Amount of insulation in walls and roof; Geographical location where the RV will be used; Personal comfort level required. 1. For one unit installation: The unit should be mounted slightly forward of center (front to back) and centered from side to side. 2. For two unit installations: Install one unit 1/3 and one unit 2/3's from front of RV and centered from side to side. It is preferred that the unit be installed on a relatively flat and level roof section measured with the RV parked on a level surface, but up to a 8° tilt is acceptable. 3. After Location Has Been Selected: a. Check for obstructions in the area where unit will be installed. See (FIG. 1). FIG. 1 40 12 Center Line Of Unit 9-1/2 29 Keep These Areas Free Of Obstructions Roof Opening Front 4 4 Dimensions Are Nominal b. Maintain structural integrity. Otherwise damage to product and/or RV could occur. The roof must be designed to support 130 pounds when the RV is in motion. Normally a 200 lb. static load design will meet this requirement. c. Check inside the RV for air distribution box obstructions (i.e. door openings, room dividers, curtains, ceiling fixtures, etc.) See (FIG. 2). 5 FIG. 2 20 22 2-1/2 Dimensions Are Nominal 2-7/8 Air Distribution Box Perimeter Roof Opening 20 3-7/8 Center Line Of Opening Front 3-7/8 2-7/8 22 Dimensions Are Nominal B. Roof Preparation 1. FIRE OR ELECTRICAL SHOCK HAZARD. Verify there are no obstacles inside RV roof and/or walls (wires, pipes, etc.). Shut OFF gas supply, disconnect 120 Vac power from RV, and disconnect positive (+) 12 Vdc terminal from supply battery BEFORE drilling or cutting into RV. Failure to obey these warnings could result in death or serious injury. Opening Requirements - Before preparing the ceiling opening, the type of system options MUST be decided upon. Read all of the following instructions before beginning the installation. Carefully mark and cut the required roof opening. See section, "B. Roof Requirements" on page (4). 2. Using the roof opening as a guide, cut the matching hole in the ceiling. 3. Maintain structural integrity. Otherwise damage to product and/or RV could occur. NEVER create a low spot on RV roof. Otherwise, water will pool and could cause a leak. The opening created must be framed to provide adequate support and prevent air from being drawn from the roof cavity. Framing stock 3/4or more in thickness must be used. Remember to provide an entrance hole for power supplies, 3 conductor cable, and furnace wiring (if applicable). See (FIG. 3). https://manual-hub.com/ INSTALLATION PROCEDURE FIG. 3 Do Not Cut Roof Structure Or Rafters 3/4 Min. Good-Rafters Good LocationSupported By Between Roof Cross Beams Rafters Frame Opening So It Won't Collapse When Bolting Down Unit Leave Access For Power Supply Wiring 15 Min. At Front Of Opening C. Wiring Requirements 1. Route a copper, with ground, 120 Vac supply wire from the time delay fuse or circuit breaker box to the roof opening. The proper size wire can be determined from chart on page 4. a. This supply wire must be located in the front portion of the roof opening. b. The power MUST be on an appropriately sized separate time delay fuse or circuit breaker. The proper size protection can be determined from the chart on page 4. c. Make sure that at least 15 of supply wire extends into the roof opening. This insures an easy connection at the junction box. d. Protect the wire where it passes into the opening with approved method. 2. Route a dedicated 12 Vdc supply wire (18-22 AWG) from the RV's converter (filtered side) or battery to the roof opening. a. This supply wire must be located in the front portion of the roof opening. b. Make sure that at least 15 of supply wire extends into the roof opening. 3. Route a 3 conductor cable, 18 to 22 AWG, from the roof opening to the Single Zone LCD (hereinafter referred to as SZLCD) thermostat mounting location. Make sure that at least 15 of the wire extends into the roof opening and 6 extend from the wall at the thermostat mounting location. See "D. Choosing Thermostat Location" on page (6). 4. If system includes a gas furnace, route two 18 gauge thermostat wires from the furnace to the roof opening of the unit that will control it. If more than one furnace is to be used, route the second set of thermostat wires to the second unit. Make sure that 15 of wire extends into the opening. D. Choosing Thermostat Location The proper location of the thermostat is very important to ensure that it will provide a comfortable RV temperature. Observe the following rules when selecting a location: 1. Locate the thermostat 54 above the floor. 2. Install the thermostat on a partition, not on an outside wall. 3. NEVER expose the thermostat to direct heat from lamps, sun or other heat producing items. 4. Avoid locations close to doors that lead outside, windows or adjoining outside walls. 5. Avoid locations close to supply registers and the air from them. 6. When multiple single zone thermostats are be- ing utilized, each individual thermostat MUST be installed in the room that the air conditioner is responsible for cooling to prevent air conditioners from attempting to turn on at the same time and overloading the breaker. E. Thermostat and Thermostat Cable Installation 1. S ZLCD Thermostat Wire colors listed for the three conductor cable match the wire colors in the harness at the SZLCD electronic control box. Available wire colors may vary. a. Remove the cover from the SZLCD thermostat. Depress tab on bottom of thermostat and separate it from the base. b. Insert the previously run three (3) conductor cable through the hole in the base assembly. c. Cut back the outer cable shield approximately 3 inches and strip 1/4 insulation from each wire. d. Mount the thermostat level on the wall using the screws provided. e. Make the following connections to the thermostat. See (FIG. 4). 6 https://manual-hub.com/ 12VCOMMS 12V+ INSTALLATION INSTRUCTIONS FIG. 4 4. Place the air distribution box kit inside the RV. This box contains mounting hardware for the unit and will be used inside the RV. This completes the outside work. Minor adjustments can be done from inside the RV if required. G. Installation Preparation 1. C heck gasket alignment of the unit over the roof opening and adjust if necessary. Unit may be moved from below by slightly lifting. See (FIG. 6). Red/white wire to the 12V+ terminal Black wire to the 12V terminal Orange wire to the "COMMS" terminal f. Inspect all connections to make sure they are tight and not touching any other terminals or wires. g. Push the wires back through the base into the wall. Place cover on the thermostat and push until an audible click is heard. F. Placing Unit On Roof 1. Remove the unit from the carton and discard carton. 2. LIFTING HAZARD. Use proper lifting technique and control when lifting product. Failure to obey this caution could result in injury. Place the unit on the roof. 3. Do NOT slide unit. Otherwise, damage to gasket (on bottom of unit) may occur, and could cause a leak. Lift and place the unit over the prepared opening using the gasket on the unit as a guide. See (FIG. 5). FIG. 5 FIG. 6 Center Unit From Below Roof Gasket 2. Remove air distribution box and ceiling template from the carton. The upper duct is shipped inside the lower duct which is part of the ceiling template. 3. All models listed in this manual will use a three (3) bolt pattern for installing the air distribution box kit. These bolts along with the electronic control box cover are furnished in the SZLCD electronic control kit. 4. Remove upper duct from ceiling template and locate it over blower discharge. See (FIG. 7). Edge without flange installs toward REAR of opening. FRONT Lift & Place FIG. 7 Rear Of Unit Do Not Slide Upper Discharge Air Duct Edge Without Flange To Rear Of Unit 7 https://manual-hub.com/ INSTALLATION PROCEDURE 5. Use two (2) sharp pointed #10 sheet metal screws to hold duct to base pan. Screw holes are provided in bottom of base pan for these screws. 6. Reach up into the return air opening and pull the unit electrical cord down for later connection. See (FIG. 8). FIG. 8 Furnace Wires Control Cables 10. Plug the supplied freeze control sensor into the matching connector in the SZLCD electronic control box. 11. Insert the freeze control sensor into the evaporator coil fins approximately 1 above the bottom of the coil fins and on the left side. See (FIG. 10). Bend the fins over sensor to secure in place. , FIG. 10 Freeze Control Sensor Gasket Electrical Cord AC Power Supply Remove Hang Tag Route Up Through Return Air Opening In some applications it may be necessary to extend the 6 pin connector. Order cable number 3105584.001 if needed. H. Wiring System 7. Measure the ceiling to roof thickness: a. If distance is 2-3, remove perforated tabs from lower duct. See (FIG. 9). b. If distance is 3-4, install ducts as received. See (FIG. 9). 1. 1 20 Vac Power Supply Connection a. ELECTRICAL SHOCK HAZARD. Verify 120 Vac power is disconnected from RV. Failure to obey this warning could result in death or serious injury. c. If distance is 4-6, use optional 318556.000 Duct Adaptor and 3100895.006 Bolt Kit. b. ELECTRICAL SHOCK HAZARD. Provide grounding in compliance with all applicable electrical codes. Failure to FIG. 9 Upper Discharge Air Duct obey this warning could result in death or serious injury. Route the 120 Vac supply wire through the strain relief in the SZLCD electronic con- trol box. Tighten strain relief, making sure Step b Use As Packaged Step a Remove At Perforation Lower Discharge Air Duct enough wire is inside SZLCD electronic control box to connect with unit 120 Vac wires. c. Connect the white to white; black to black; and green or bare copper wire using appropriate size wire connectors. d. Push the wires into the SZLCD electronic control box and install the cover with the four (4) blunt point screws provided. 2. Low Voltage Wire Connections At The SZLCD Electronic Control Box. 8. Remove the junction box cover from the SZLCD electronic control box. 9. Plug the electrical cord (6 pin connector) from the upper unit into the mating connector in the SZLCD electronic control box. 8 a. Verify the positive (+) 12 Vdc terminal is disconnected from supply battery. Otherwise, damage to unit could occur. https://manual-hub.com/ INSTALLATION PROCEDURE Plug the supplied 4 wire harness and the supplied 2 blue wires into their matching connectors in the SZLCD electronic control box. b. Connect the previously run +12 Vdc supply wire to the red wire from the SZLCD electronic control box. c. Connect the previously run 12 Vdc supply wire to both the black wire from the SZLCD electronic control box and to wire of the three wire cable that goes to the thermostat 12V terminal. d. Connect the previously run furnace thermostat wires (if applicable) to the blue wires coming from the SZLCD electronic control box. e. Connect the red/white wire from the SZLCD electronic control box to wire of the three wire cable that goes to thermostat 12V+ terminal. f. Connect the orange wire from the SZLCD electronic control box to wire of the three wire cable that goes to thermostat COMMS terminal. I. Installing Unit 1. Install the SZLCD electronic control box on the ceiling template as shown in FIG. 11. Drive two (2) #6 x 3/8 blunt point Phillips head screws (provided) through the ceiling template into holes in the SZLCD electronic control box to hold into place. See (FIG. 11). FIG. 11 6 Pin Connector FIG. 12 Unit Return Air Opening Slide Lower Air Discharge Duct Over Upper Duct Mounting Bolt Finger Tight Roof Gasket Tighten to compress gasket to 1/2" b. Tighten mounting bolts to correct torque specifications. Overtightening could damage unit's base pan or ceiling template. Not enough torque will allow an inadequate roof seal, and could cause a leak. Tighten all three (3) mounting bolts EVENLY within 40 to 50 inch pounds. See (FIG. 12). This will compress the roof gasket to approximately 1/2. SZLCD Electronic Control Box Ceiling Template Mounting Screws 2. Install ceiling template by sliding lower duct over upper duct. See (FIG. 12). 3. Hold the ceiling template up to the roof opening. a. Start each mounting bolt through the ceiling template and up into the unit base pan by hand. See (FIG. 12). J. Air Distribution Box Installation 1. R emove the two filter-grilles from the air distribution box. 2. Slide the air distribution box over the ceiling template. 3. Install the four (4) sharp pointed screws through the air distribution box legs and into the prepunched holes in ceiling template. There are four optional mounting holes on the outer edge of the return air opening for which no screws are provided. These are only required where an uneven ceiling does NOT allow proper fitting of the air distribution box. 4. Install the filter-grilles by pushing them into place. See (FIG. 13). 9 https://manual-hub.com/ INSTALLATION PROCEDURE FIG. 13 Ceiling Template Air Distribution Box Filter Grille 5. The unit installation is now complete and is ready for operation. The power supply to the unit may now be turned "ON". 6. Verify that all features of the installed system work. Please read the unit User's Guide or Operating Instructions before proceeding. Check fan speeds, cooling operation, and furnace operation (if applicable). If the features do not work, disconnect the 120 Vac and 12 Vdc power supplies and verify that all wiring is correct. 10 https://manual-hub.com/ WIRING DIAGRAM A. Unit Wiring Diagram B. Single Zone LCD Electronic Control Kit Cool/Furn Wiring Diagram ,)7+,6352'8&7,66833/,('%<$:,5,1*6<67(07+$7,1$&&25'$1&(:,7+ &$1$',$1(/(&75,&&2'(3$57&$1'7+(1$7,21$/(/(&75,&&2'( $16,1)3$125(48,5(67+(,167$//$7,212)$1(48,30(17*5281',1* &21'8&72525&21'8&72567(50,1$/625*5281'6&5(:6)257+,6 385326(0867%(,167$//(' (/(&&211 )520$& *51<(/ :+7 5(' *5< %/. %/8 %/. .5(/$< %/8 12 - &20 - %/. 5(' *5< < 9 < - 9 9 &200 < )851$&( < < )851$&( < 9$& +=2 86(&233(5 &21'8&7256 21/< 287'2257(03 6(1625 )5((=(6(1625 5(' %/. 5(':+7 25* `68393/< ` 72 767$7 %/8 %/8 ),(/':,5,1* )$&725<:,5,1* 11 https://manual-hub.com/