Embedded 4G Modem for EVlink Pro AC

Installation and Configuration Guide

Product Overview

This document provides installation and commissioning instructions for the EVA1MS and EVA1MM embedded 4G modems, designed for Schneider Electric's EVlink Pro AC charging stations. The EVA1MS and EVA1MM modems enable 4G communication for the charging station, supporting a daisy-chain configuration for up to 10 stations.

Key Models: EVA1MS, EVA1MM, EVA1Mp

Important Safety Information

DANGER: Electric Shock, Explosion, or Arc Flash

⚠️ DANGER: Failure to follow these instructions will result in death or serious injury.

  • Turn off all power supplying the charging station before working on it.
  • Use a voltage tester of appropriate rating.
  • Follow applicable local, regional, and national safety standards and regulations.

NOTICE: Risk of Radio Interference

⚠️ NOTICE: Failure to follow these instructions can result in equipment damage.

  • In operation, the modem may emit electromagnetic signals that can interfere with different embedded systems.
  • Do not use the modem in areas where the use of mobile communications is limited or prohibited.

NOTICE: Hazard of Electrostatic Discharge or Power Surge

⚠️ NOTICE: Failure to follow these instructions can result in equipment damage.

  • Do not touch the electronic boards.
  • Use anti-static protection when making connection operations inside the charging station.

General Requirements & Notes

  • The EVA1MS and EVA1MM modems are compatible with charging station software version 1.2.1 or higher. Use the eSetup application to check your charging station's software version and update it if necessary.
  • The modem requires GSM network coverage provided by the operator.
  • A Micro SIM card is required for the EVA1MM model.

Installation Procedures

Daisy Chain Configuration

The installation of a 4G modem in one charging station allows communication with up to 10 charging stations. For commissioning a charging station cluster, refer to Chapter 6.

For daisy chain connection of charging stations, consult instruction sheet NNZ1940301.

EVA1MS Modem Installation

  1. Remove Front Cover: Refer to instruction sheet NNZ1940301.
  2. Install Modem: Take necessary precautions when handling and installing the modem into the motherboard connector.
  3. Install Main Antenna: Wipe the surface with a dry cloth. Install the antenna and secure it with screws, torquing to 0.25 Nm (2.2 lb-in).
  4. Install Diversity Antenna: Wipe the surface with a dry cloth. Install the antenna and secure it with screws.
  5. Route Antenna Wires: Carefully route the antenna wires.
  6. Connect Antennas to Modem: Take necessary precautions to connect the antenna connectors (GPS, DIV ANT, Main) to the modem.
  7. Reinstall Front Cover: Refer to instruction sheet NNZ1940301. Ensure no electrical wires are pinched.

EVA1MM Modem Installation

  1. Remove Front Cover: Refer to instruction sheet NNZ1940301.
  2. Prepare SIM Card: Insert a Micro SIM card.
  3. Install Modem: Take necessary precautions when handling and installing the modem into the motherboard connector. Secure with screws, torquing to 0.25 Nm (2.2 lb-in).
  4. Install Antenna: Ensure the notch for antenna installation is positioned at the top of the side plate. Refer to instruction sheets JYT24397 or JYT24398 if the side plate needs to be inverted.
  5. Connectors: Connect the Cell connector and Wi-Fi connector.
  6. Install EVlink Pro AC: For installation into the metal enclosure, consult instruction sheets JYT24397, JYT24398, or JYT24399.
  7. Route Antenna Wire: Route the antenna wire.
  8. Connect Antenna to Modem: Take necessary precautions to connect the antenna connector to the modem.
  9. Reinstall Front Cover: Refer to instruction sheet NNZ1940301. Ensure no electrical wires are pinched.

Commissioning

Single Station Commissioning

  1. Download eSetup: Obtain the eSetup application from the Google Play Store or Apple App Store.
  2. Connect via Bluetooth: Bluetooth connection with eSetup is possible for 2 hours after the charging station is first powered on. After this period, an activation badge can be used to reactivate Bluetooth communication for 10 minutes. At first connection, create a secure password.
  3. Configure Modem: Configure the modem settings, including APN name, username, and password, which are typically provided by your SIM card supplier.

Cluster Commissioning (up to 10 stations)

Before starting cluster configuration, it is recommended to switch off all charging stations in the cluster. Ensure only EVlink Pro AC devices are present.

  1. Power on the charging station with the embedded modem only.
  2. Connect this station with eSetup. Start connectivity configuration by activating the embedded modem. Configure DHCP settings (set DHCP OFF and activate DHCP server) and configure supervision. Do not restart the station at this stage.
  3. Restart the charging station.
  4. Power on the next charging station of the cluster without an embedded modem.
  5. Connect this station with eSetup. Verify that DHCP is ON and configure the supervision.
  6. Restart the charging station.
  7. Repeat operations 4, 5, and 6 for the remaining charging stations in the cluster.
  8. Verify the cluster configuration with eSetup from the charging station with the embedded modem.

Notes:

  • (1) An APN name is required. For PAP, CHAP, or PAP-CHAP authentication, a username and password are necessary, provided by your SIM card supplier.
  • (2) Network settings may need to be updated.
  • (3) A URL address, charging station identifier, and optional password are required, provided by your charging station management system administrator.

Compliance Statements

EU Declaration of Conformity

Schneider Electric Industries SAS declares that the EVA1MS and EVA1MM modems used in the EVlink Pro AC offer comply with the essential requirements and other relevant provisions of RE Directive 2014/53/EU. The EU Declaration of Conformity (EV22090601) is available for download at www.se.com/docs.

UK Declaration of Conformity

Schneider Electric Industries SAS declares that the EVA1MS and EVA1MM modems used in the EVlink Pro AC offer comply with the essential requirements and other relevant provisions of UK Radio Equipment Regulations SI 2017 No. 1206. The UK Declaration of Conformity (EV22090601-UK) is available for download at www.se.com/uk/docs.

Radio Frequency Bands

The modems operate on the following frequency bands:

  • 2G: GSM 900 (Tx 880-915MHz max 33.2dBm EIRP), GSM 1800 (Tx 1710-1785MHz max 29.6dBm EIRP).
  • 3G: WCDMA Band I (Tx 1920-1980MHz max 23.4dBm), Band III (Tx 1710-1785MHz max 23.4dBm), Band VIII (Tx 880-915MHz max 23.4dBm).
  • 4G: LTE FDD Bands 1, 3, 7, 8, 20, 28A (Tx power up to 24.0dBm), LTE TDD Bands 38, 40 (Tx power up to 24.0dBm).

Recycling

The packaging materials for this equipment are recyclable. Please help protect the environment by recycling them in appropriate containers.

Models: EVA1MM Pro AC Embedded 4G Modem for EVlink, EVA1MM, Pro AC Embedded 4G Modem for EVlink, Embedded 4G Modem for EVlink, Modem for EVlink, EVlink

File Info : application/pdf, 16 Pages, 10.44MB

PDF preview unavailable. Download the PDF instead.

fiche 20240310085747

References

Adobe PDF library 17.00

Related Documents

Preview EcoStruxure™ EV Charging Expert : Guide de l'utilisateur
Guide complet de Schneider Electric pour l'installation, la mise en service et l'utilisation de la solution EcoStruxure™ EV Charging Expert. Découvrez la gestion de la recharge VE, la configuration réseau et la maintenance.
Preview Schneider Electric eMobility Solutions Catalog 2025
Explore Schneider Electric's comprehensive eMobility solutions for electric vehicle charging, covering residential, building, and fleet applications. Discover innovative products and services designed for efficiency, sustainability, and the future of all-electric mobility.
Preview EVlink Charging Stations Commissioning Guide
Schneider Electric's EVlink Charging Stations Commissioning Guide offers detailed instructions for setting up and configuring EVlink City, EVlink Parking, and EVlink Smart Wallbox models. Learn about network configuration, user authentication, energy management, and maintenance for your EV charging infrastructure.
Preview EVlink Smart Wallbox Installation Guide
This document provides a comprehensive installation guide for Schneider Electric's EVlink Smart Wallbox charging stations. It covers safety instructions, product description, technical specifications, installation design, step-by-step installation procedures, connection details, electrical tests, configuration, and troubleshooting diagnostics.
Preview Schneider Electric EVlink Home Smart User Guide: Features, Installation, and Operation
Comprehensive user guide for the Schneider Electric EVlink Home Smart charging station, covering installation, configuration, operation, safety, and troubleshooting.
Preview EVlink Pro AC Modbus Connectivity Guide
A comprehensive guide detailing the Modbus TCP connectivity for Schneider Electric's EVlink Pro AC charging stations, covering essential commands, register mappings, and error code explanations for system integration and management.
Preview Schneider Electric Easergy T300 HU250 Communication Gateway Installation Guide
Installation guide for the Schneider Electric Easergy T300 HU250 communication gateway. Details product features, ports, modem options (3G, 4G, Zigbee), digital/analog I/O, installation procedures, operation indicators, power supply, and compliance information for industrial network management.
Preview Schneider Electric EVlink Home User Manual: Installation and Operation Guide
Comprehensive user manual for the Schneider Electric EVlink Home and EVlink Home Smart charging stations, covering installation, connection, operation, safety, and troubleshooting.