CW-3000 Series Industrial Refrigeration Chiller User Manual

Read Carefully Before Use. Keep for Future Reference.

Safety Information

! Warning!

Caution!

Remember that the OUTLET of the water chiller should connect to the INLET of the product to be cooled. Similarly, the water chiller's inlet should be connected to the other machine's water outlet.

Package List

Parts Diagram

Front

Diagram showing the front of the CW-3000 Industrial Chiller with labels for Temperature Controller, System Error Light (red), Normal Operation Indicator Light (green), and Power Switch.

Back

Diagram showing the back of the CW-3000 Industrial Chiller with labels for Water Injection Port, Alarm Output Terminal, Power Socket & Spare Fuse, Cooling Water Outlet, Cooling Water Inlet, Radiator Fan, Machine Parameters, Serial No., and Water Drain.

Installation

It is very simple to install this industrial chiller.

  1. Open the package to check that the machine is intact and all the necessary accessories are included. [Box icon]
  2. Open the injection port and add water. For best results, use deionized water. Pour slowly and do not fill the chiller completely. There should be about 3–6 inches (8–15 cm) between the opening and the top of the water in the machine. Do not allow the water to overflow. For cooling carbon steel equipment, the water should have the appropriate amount of anticorrosive additive. [Water jug and pipe icon]
  3. Connect the water inlet and outlet pipes to the system you wish to cool. Be sure to connect the chiller's OUTLET pipe to your system's INLET port and the chiller's inlet pipe to the system's outlet port. [Pipe connection icon]
  4. Plug in the power and flip the power switch. The pump will begin working. There may be some bubbles at first. These should disappear after a minute or two. Do not worry if the fans and other components of the chiller do not activate. They are usually automatically controlled and will not begin working until they are needed by the machine. In different conditions, the time for startup may vary from seconds to a few minutes. Do not become frustrated and switch the machine on and off, except when necessary to add water. [Plug and switch icon]
  5. Check the water level of the water tank again, as in Step 2 above. The water level of the chiller will lower somewhat as it fills the cooling path of your machine. If necessary, carefully add more water to the chiller to maintain a level about 3–6 inches (8–15 cm) below the top of the chiller. If the water level drops sharply or continues to go down during normal use, turn off your devices and examine the water pipes and cooling path for leakage. Repair any such leaks before restarting the devices and continuing work. [Water level indicator icon]

Diagram illustrating the water level, showing approximately 8-15 cm from the top of the tank.

Alarms

1. Alarm Lights and Sounds

CONDITION DISPLAY Indicator Lights Alarm H1/H2 Output H1/H3 Output
Normal On Off None Off On
Blocked pathway Off On Buzzing On Off
Water above 140°F (60°C) Off On Buzzing On Off
Faulty pump Off On Buzzing On Off
Water shortage Off On Buzzing On Off
Electrical circuit failure On Off None On Off
Power interruption On Off None On Off

Note that the flow alarm is connected to relay contacts requiring that the operating current be less than 5A and working voltage less than 300V.

2. Alarm Circuit

Diagram of the alarm circuit showing power input (L, N), flow switch (Flow-sw), temperature switch (60°CT-SW), relays (KM-1, KM-2), error light, normal light, and output ports (H1, H2, H3).

Maintenance

Specifications

Model CW-3000AG CW-3000DG
Voltage 220V 110V
Frequency 50Hz 60Hz
Current 0.45A 0.9A
Cooling Capacity 27.8W/°F (50W/°C)
Capacity 2.4 US gal. (9L)
Port Dia. 10 mm
Max. Lift 32.8 ft. (10 m)
Max. Flow 2.6 gpm (10 L/min.)
Net Weight 20.9 lb. (9.5 kg)
Dimensions 19×11×15 in. (48.3×27×38 cm)

Troubleshooting

Never use a dangerous system like a laser engraver if the water cooling system is malfunctioning. If the laser or other dangerous device is already on, shut it down immediately and correct the problem with the chiller before using it again.

Failure Approach
The machine has no power. Check that the power cord is firmly connected. Cut the device's power and pull out the fuse box from the back of the machine. If the fuse has blown, ensure that the power supply is stable or install a voltage regulator. Replace the fuse with the spare stored in the fuse box.
The machine is on, but the water does not flow. Check that there are no leaks in the water pipes or cooling pathway. Then add more water until it reaches the correct height.
The water is flowing but there is an alarm. Check that there are no leaks in the pipes and add more water.
The water temperature is too high. Check that the chiller has proper room for ventilation and the air filter is clean. Ensure that the power supply is stable or install a voltage regulator. Ensure that there is sufficient time for refrigerator to occur before activating the device you want to cool. At most, with a functioning machine, this should take less than 5 minutes. Reduce the heat load or upgrade to a stronger chiller.
The fan does not turn on. This is normal when the water is below 70°F. If the water is heated and the fan still does not operate, contact customer service.
The room temperature is too high. Ensure the chiller has proper room for ventilation (See p. 1). If it already does, take action to cool the surrounding work space.
There is constant condensation around the machine and the water lines. Increase the water temperature or heat the area around the cooling path. Failing this, take action to reduce the ambient humidity of the surrounding work space.
Water drains slowly. Open the injection port.

Contact Us

Thank you for choosing our products! If you have any questions or comments, contact us at help@cs-supportpro.com and we'll resolve your issue ASAP!

For a .pdf copy of the latest version of these instructions, use the appropriate app on your smartphone to scan the QR code to the right.

[QR Code Placeholder]

Models: CW-3000 Series Industrial Refrigeration Chiller, CW-3000 Series, Industrial Refrigeration Chiller

File Info : application/pdf, 9 Pages, 1.11MB

PDF preview unavailable. Download the PDF instead.

9L INDUSTRIAL WATER COOLING SYSTEM ?v=1655805235

References

Adobe PDF Library 15.0 Adobe InDesign 15.1 (Windows)