User Manual for SCALETRON models including: 4042ECO, Spill Containment Scale Base with Bladder, 4042ECO Spill Containment Scale Base with Bladder, Containment Scale Base with Bladder, Scale Base with Bladder, Base with Bladder

Model 3001 thru 3006 Ton Cylinder Scales:

Installation

Scaletron Industries 26 x 24 x 7-13/100 in. Economical Spill Containment Digital Drum Scale - 4042ECO-26-312 - Pollardwater

Scaletron Industries 26 x 24 x 7-13/100 in. Economical Spill Containment Digital Drum Scale - 4042ECO-26-412 - Pollardwater

PDF preview unavailable. Download the PDF instead.

Query?ASSET ID=9105829&USE TYPE=INSTALLATION&PRODUCT ID=8585232
Technical Assistance: (800)257-5911 or (215)766-2670 Email: info@scaletronscales.com
Model 4042ECOTM Spill Containment Scale Base with bladder [PN: 4042ECO- ( enter size of base ) ­ (enter net capacity in LB or KG)]:
The Model 4042ECOTM Spill Containment Scale is assembled and calibrated to the digital controller at the factory, then partially disassembled for shipment. Depending on size of containment basin, sometimes they are shipped direct from the manufacturer and will arrive separate from scale base and controller.
Set up and Wiring:
Step 1: Remove all parts from box and inspect for damage ­ bent metal, broken wires, cracks in indicator, etc. Any shipping damage must be reported to carrier!
Parts Bag Contains: (Tie wrapped to scale base) · 1) leveling foot w/ jam nut
Step 2: Place the scale base on solid, dry, and even surface. Clear the area of all debris where the scale base will be set up.
STEP 4: Position pivot plates on the floor so the base is in the desired position. Floor must be close to level, but if the base is out of level from side to side, shim pivot plates to level scale from side to side and prepare anchor bolts. Mark and drill (3) holes per pivot plate into concrete and anchor with lag bolts.
STEP 5: This leveling adjustment is critical to accurate operation of the scale. Place level on top of scale base from front to back and adjust leveling foot to level scale base. Tighten the nut on the load cell leveling foot stud so that foot does not twist off of level. Nut should be a little more than hand tightened.
Step 6: Make sure the anti-tipping side bolts are not touching the floor, but are capable of stopping the base from tipping.
Step 7: Place Containment basin under scale base making sure it isn't rubbing on scale base.
Step 8: If conduit is to be used, we recommend at least 2 feet of horizontally mounted, FLEXIBLE conduit as to not interfere with free movement of the base for accurate measurement. Feed the wire up through the conduit, and apply a fitting.
Step 9: Connect the wires into the connector using the following code:
Wire Color Code:
Green = + Signal White = - Signal Black = - Supply Voltage Red = + Supply Voltage Violet = Shield
***See controller manual for rest of set-up and operating instructions.***
Replacement Parts:
PN: SB/SS- (enter load cell value) ­LC : replacement load cell & shim PN: 4042ECOLF : leveling foot & jam nut for Model 4042ECOc scale base PN: 4042-CB26 : 26" Replacement Spill Containment Basin (11 gal) PN: 4042-CB26x52 : 26"x52" Replacement Spill Containment Basin (22 gal)
©2021 Scaletron Industries Ltd., Plumsteadville, PA Scaletron, PRINTED IN THE U.S.A. January 2021.


Microsoft Word for Microsoft 365