Installation Instructions: RXRF-AGB1 Motorized Damper (nonDDC)
Step 1: Inspection and Contents Check
Immediately upon receipt, inspect all cartons and contents for transit damage. Open cartons with damage immediately, noting it on delivery papers and filing a claim with the carrier. Compare carton contents to the PACKAGE CONTENTS List (Table 1) to identify any missing items.
ITEM | DESCRIPTION | QTY |
---|---|---|
1 | Outside air damper with actuator | 1 |
2 | Hood Top | 1 |
3 | Hood left side | 1 |
4 | Hood right side | 1 |
5 | Hood divider A/B | 1/1 |
6 | Hood front bracket | 1 |
7 | Permanent water entrainment filter 21.188" x 17.125" x 1" | 6 |
8 | Hardware bag -(22) 1/2" #10 SMS Screws, I & O Manual, (1) Zip tie | 1 |
9 | Hood Hardware bag - (26) 5/8" #10 TEK Screws | 1 |
Step 2: Panel Removal
Remove the HORIZONTAL RETURN COVER and LOWER PANEL from the unit. Retain all screws. (Refer to Figure 1 for visual guidance).
Step 3: Damper Installation
Install the 2-position damper into the unit. Secure the damper using the top hole of the two-hole pattern on both the left and right sides with the supplied screws. (Refer to Figure 1).
Step 4: Wiring Connections
Disconnect the jumper plug (PL7) from the economizer harness in the HVAC unit. Connect the unit's 12-pin ECONOMIZER PLUG (PL34) to the 2-position damper's mating plug (PL8). If a field-installed smoke detector kit is not used, reinstall the jumper plug (PL7) into the alternative 12-pin plug on the damper (this plug has only 3 wires). If a smoke detector is installed, attach the jumper plug to its harness with the provided zip tie for future troubleshooting. Follow the smoke detector kit's instructions for installation. (Refer to Figure 3).
Step 5: Hood Assembly - Sides and Top
Assemble the Hood. Attach the left and right hood sides to the Hood Top mounting flange on the inside of the panel. Secure them using the supplied screws through the pre-punched holes. (Refer to Figure 4).
Step 6: Hood Assembly - Divider and Bracket
Assemble the hood divider A/B between the left and right hood sides using supplied screws, as shown in Figure 4. Attach the Hood Bottom Bracket between the left and right hood sides using supplied screws.
Step 7: Filter Installation
Insert the permanent filter into the hood. The hood divider and hood bottom bracket will support the filter. Spring filter clips are provided to help secure the filters. (Refer to Figure 4).
Step 8: Mount Hood Assembly
Mount the assembled hood onto the RTU, positioning it over the 2-position damper. (Refer to Figure 2).
Step 9: Adjust Actuator Rotation Limit
The 2-position damper actuator allows for adjustable mechanical rotation to set the maximum opening position. Remove the clip from the actuator shaft that secures the mechanical stop. Adjust the mechanical stop to the desired maximum opening position, then reinsert the clip to secure it. (Refer to Figure 5).
Step 10: Unit Startup Check
Upon unit startup, verify that the 2-position damper opens correctly when the indoor fan is activated.
Wiring Diagram
The '2 Position Non-DDC Wiring Diagram' illustrates the connections between PL40 (labeled with pins 1-12 and wire colors like R, BR, R/W, PR/W) and PL8 (labeled 1-12), which then connects to the actuator. The diagram shows specific wire assignments for the actuator.