Battery system wiring diagram Quick Settings Tap Home > Settings > Quick Settings to complete quick settings step by step. Installer password: goodwe2010 Setting the BAT Connect Mode Setting the Safety Code Setting Inverter Quantity


File Info : application/pdf, 9 Pages, 9.19MB

PDF preview unavailable. Download the PDF instead.

GW Commercial-Smart-Inverter-Solutions Quick-Guide-ET15-30kW-LXC60kWh-EN
ET 15.0-30.0kW Commercial & Industrial Smart Inverter Solutions Guide
V1.1-2024-08-19

Product Type

Model

WARNING The information in this user manual is subject to change due to product updates or other reasons. This guide cannot replace the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions in the manual are for guidance only.
01 Networking

Smart dongle

· WiFi/LAN Kit-20 · Wi-Fi Kit · Ezlink3000

02 Power On/Off

Description
· Use WiFi/LAN Kit-20 or Wi-Fi kit for a single inverter. Upgrade the firmware of the inverter before replacing the Wi-Fi kit with a WiFi/LAN Kit-20 dongle.
· In parallel scenarios, the EzLink3000 must be connected to the master inverter. Do not connect any communication module to the slave inverters. The firmware version of EzLink should be 04 or above.

Product Type

Model

Inverter

GW15K-ET GW20K-ET GW25K-ET GW29.9K-ET GW30K-ET

Battery GW60KWH-D-10 system GW60KWH-D-10(Extension)

Smart meter

· GM3000 · GM330

Description

A maximum of 4 inverters can be connected in a parallel system. Inverter firmware requirements for parallel connections: · Consistent firmware version · ARM version: 08(401) or above · DSP version: 07(7068) or above
A maximum of 3 battery systems can be clustered in a system.

Power ON/OFF:

1

2

3

4

5

6

7

 : Optional in compliance with local laws and regulations.

· GM3000: GM3000 and the CT, which cannot be replaced, are included in the inverter package. CT ratio: 120A/40mA.
· GM330: Order the CT for GM330 from GoodWe or other suppliers. CT ratio: nA/5A. · nA: CT primary input current, n ranges from 200 to 5000. · 5A: CT Secondary input current.

1

03 Installations 2

04 Wiring Diagram
ET 15-30kW(single) + Lynx C 60kWh + GM3000 + WiFi/LAN
3

ET 15-30kW(parallel connected) + GM3000 + Ezlink3000
4

ET 15-30kW(single) + Lynx C 60kWh + GM330 + WiFi/LAN
5

ET 15-30kW(parallel connected) + GM330 + Ezlink3000
6

Battery system wiring diagram

05 Equipment Commissioning

SolarGo app

SEMS Portal APP

In parallel scenarios, the software version of SolarGo app should be 5.3.0 or above. Follow the prompts to connect the device.

Quick Settings
Tap Home > Settings > Quick Settings to complete quick settings step by step. Installer password: goodwe2010

Setting the Safety Code

Setting Inverter Quantity (Only For Parallel Connections)

1

2

Setting the BAT Connect Mode

7

Setting the Working Mode

Setting Batteries Of Each Inverters (Only For Parallel Connections) Follow the prompts to set the battery model and connection mode of each inverter.

BACK-UP Mode

Economic Mode

Depth Of Discharge (On-Grid): The maximum depth of discharge of the battery when the system is working on-grid. Depth Of Discharge (Off-Grid): The maximum depth of discharge of the battery when the system is working off-grid.
Smart Charging Mode

......

Setting Advanced Parameters
Tap Home > Settings > Advanced Settings to set the following functions. Setting DRED/Remote Shutdown/RCR or Three-phase Unbalanced Output Function (Optional)

Setting the Power Limit Function

Enable Three-phase Unbalanced Output when the utility grid company adopts phase separate billing.

8

Configuring the Network Tap Home > Settings > Communication Setting to set network parameters.
WiFi/LAN Kit-20, Wi-Fi or Ezlink3000

Creating a Power Plant Create power plants and add equipments via SEMS Portal app.
Enter the plant information based on actual situation.

Scan the QR code to add a new equipment.

2
Add a new equipment
1
9

GoodWe Technologies Co., Ltd. No. 90 Zijin Rd., New District, Suzhou, 215011, China
www.goodwe.com service@goodwe.com



References

Adobe PDF Library 17.0 Adobe InDesign 19.4 (Windows)