Install the anti-tipping plates on both sides and tighten the two screws. Fix the bracket on the wall. Fix the battery module on the bracket. APX 5.0P-B1 ...


File Info : application/pdf, 2 Pages, 9.71MB

PDF preview unavailable. Download the PDF instead.

apx-5.0-30.0p-s1-quick-guide-en-202308-compressed
Quick Installation Manual
APX 5.0~30.0P-S1
Shenzhen Growatt New Energy Co.,Ltd.
1

Environment requirements

Max.+50
Installation tools
M6
Dimensions
APX 98020-P1 (Power Module)
APX 5.0P-B1 (Battery Module)

295

295

Min.-10 M6 2 N·m 690 690

RH +5%~+95% M4 1 N·m

Left trim-cover*1 1-2 Checking the APX 5.0P-B1 packing list

Unit:mm 185

APX 5.0P-B1BM)

Right trim-cover*1
}to Battery Module
Parallel cable *1

A

B

C

185

A Anti-tipping plate *2

B M6 expansion screw *2

Trim-cover *2

Warranty card *1

C M4x9 stainless steel screw *3

1-3 Check accessories

1. Inspection upon delivery
1- 1 Checking the APX 98020-P1 packing list

Please check that the contentsare complet

}to PCS

APX 98020-P1 (PM)

to PCS to PE
}to Battery Module
System cable

C

Marking-off template

D

A

B

A Operation Manual *1
B Quick installation manual *1 C Warranty Card *1 D Marking-off template *1

A

B

C DE

A Protective rubber ring *4 B Anti-tipping plate *2 C M6 expansion screw *2 D M6x12 stainless steel screw *1 E M4x9 stainless steel screw *3

2

APX 98020-P1 A

APX 5.0P-B1 B

*8

*6

*4

Wall bracket

C

}2.5 meters
APX 5.0P-B1 Parallel extension cable
D

*2
APX 5.0P-B1 Base E

2.5 meters
Cascading cable F

Battery Capacity 5kWh 10kWh 15kWh 20kWh 25kWh 30kWh

Floor-mounted Installation Wall-Mounted Installation

Compound Mode

Compound Mode

A+B+E

A+B+C

A+B*2+E

A+B*2+C

A+B*3+E

A+B*3+C

A+B*4+E

A+B*4+C

A+B*5+E*2+D

A+B*5+C*2+D

A+B*6+E*2+D

A+B*6+C*2+D

3

2.Installation Environment Requirement

4. Wall-Mounted Installation

1

4-1 Installation Location Requirements

Marking pen

 300mm

4

5

Level

 300mm

 300mm

 100mm  100mm

Note: Install a sun/rain shade to avoid exposure to direct sunlight and rain.
3. Floor-mounted installation
3-1 Installation Location Requirements
Wall

Ground

Ground

Note: When mounted on the ground,a maximum of six battery modules can be stacked. If you are installing more than four modules you are advised to install them in two columns.

3-2 Installation Procedure Mounting Hole Dimensions

Unit:mm
20kWh

15kWh

10kWh 5kWh

Left
4

Right

1

2

3

1 2 Install the connecting pieces on both sides and tighten the two screws .

3 Level the battery modue using a level.

4

Install the anti-tipping plates on both sides and tighten the two screws .

5

Mark the hole positions.

2

4

5

M6 expansion screw

Dia 8.0mm

Marking-off

template

90°

1

Deep45~50mm 2

3

1 The marking-off template ensures that the alignment marks are properly. 2 3 4 5 Fix the M6 expansion screw into the wall.

3

3 Install the connecting pieces on both sides

and tighten the two screws.

3

4

4

Secure the module on both sides to

the wall.

Ground

Ground

Note: When mounted on the wall,a maximum of five battery modules can be stacked. Please ensure that the load-bearing capacity of the wall exceeds 280 kg.

34-2 Installation Procedure

Mounting Hole Dimensions

Unit:mm

20kWh

15kWh

10kWh

5kWh

1

2

1 Loosen two screw, move up the handle on both sides.

2 Tighten the two screws, fix the two battery modules.

4

1

3

Install the connecting pieces on both sides

and tighten the two

screws.

3

4

4

Secure the module on both sides to

the wall.

1

2

1 Loosen two screw, move up the handle on both sides.

2 Tighten the two screws, fix the battery and the power modules.

5

Left

Right

install the wall bracket
6

2

Dia 8.0mm

1

2

90°
Deep45~50mm 3

Level

Marking pen

1 Level the battery Module using a level. 2 Mark the hole positions. 3 Drilling eight holes.

Secure the module on both sides to the wall.

The battery supports power and capacity expansion. A maximum of six battery modules can be connected to a single power module.

DC input cable

MOD 3-10KTL3-XH

Signal cable

MOD 3-10KTL3-XH

MOD 3-10KTL3-XH

Loosen two screws, move up the handle on both sides. Tighten the two screws, fix the battery and the power modules.

2.5kW/5kWh
MOD 3-10KTL3-XH

5kW/10kWh
MOD 3-10KTL3-XH

7.5kW/15kWh
MOD 3-10KTL3-XH

Install the anti-tipping plates on both sides and tighten the two screws.
Fix the bracket on the wall. Fix the battery module on the bracket.

APX 98020-P1 terminal & key description

1

BAT-

Battery negative terminal to connected to the PCS

9

2

BAT N

Battery neutral terminal to connected to the PCS

1 2

3

BAT+

Battery positive terminal to connected to the PCS

3

4

INV

Communication terminal connect to the PCS

4

5

BMU

Communication terminal connect to the battery module (Link-in)

8

Connect to the positive battery

5

6 Module+ termi-nal of the Battery Module

(B+)

6

7

Connect to the positive battery 7 Module- termi-nal of the Battery Module

(B-)

8

USB

USB terminal

9

Start Start key

7.5kW/20kWh Wiring diagram

7.5kW/25kWh

7.5kW/30kWh

NOTE:Battery modules MUST be paralleled with B+ to B+,B- to B-

M6 expansion screw
Marking-off template
The marking-off template ensures that the alignment marks are properly palaced on the wall. Fix the M6 expansion screw into the wall.
Secure the module on both sides to the wall.
Loosen two screws, move up the handle on both sides. Tighten the two screws, fix the two battery modules.

5-2 APX 5.0P-B1 Connection end face introduction

76

Communication terminal

1

Link-in Connect to another BM(Link-out)

or the PM(BMU) Communication

B+

B-

Link-in

1

Communication terminal 2 Link-out Connect to another BM(Link-in)
or the PM(BMU)Communication

3

B+

Battery positive terminal Connect to another BM(B+)

4

B-

Battery negative terminal Connect to another BM (B-)

2

5

USB

USB terminal

Link-out

B+

B-

Battery negative terminal

6

B-

Connect to another BM(B-) or the

USB
5

PM (Module-)

34

Battery positive terminal

7

B+

Connect to another BM(B-) or the

PM (Module-)

PE
2 N·m
1 N·m

APX 5.0-30.0P-S1

MOD 3-10KTL3-XH

Silk screen

Terminal serial number

Definition

Silk screen

Terminal serial number

Definition

1

WAKE- ( W-)

10

BAT.EN-

2

WAKE+( W+)

9

BAT.EN+

INV

COM

7

RS485_B(B)

8

RS485B2

8

RS485_A(A)

7

RS485A2

MOD3-10KTL3-XH

Lnstalling the trim-cover

Note: It is not recommended to install a DC circuit breaker between the battery system and the PCS. If you want to install a DC circuit breaker with rated working voltage greater than 1000V and rated working current greater than 63A, do not operate the DC circuit breaker with power-on,otherwise the machine may be damaged.

Connector

APX 98020-P1 Left trim-cover APX 98020-P1 Right trim-cover

6. Terminal Connection
Power terminal Installer side

Installer side

7. Key operation

Power on

1. Turn on the DC Switch 2. Press the start key for more
than 5S

Power off

Turn off the DC Switch (waiting for over 90S)

Note: 1. Before performing maintenance and repair work, ensure that the AC circuit breaker and the PV switch of the PCS, as well as the switch of the APX are disconnected. Wait for 15 minutes after the sys-tem is powered off and make sure that the LOGO (GROWATT) indicator on the APX is off. Do not perform any operations until the system is completely shut down.
2. When multiple battery systems are used in parallel connection, you only need to press the start key of one module to start the system.

8. Service and contact

Shenzhen Growatt New Energy Co., Ltd 4-13/F, Building A, Sino-German (Europe) Industrial Park, Hangcheng Ave, Bao'an District, Shenzhen, China

+86 755 2747 1942

service@ginverter.com

W:www.ginverter.com

Download Manual

Growatt New Energy

GR-UM-339-A-00

12



References

iLovePDF