Installation Guide for GROWATT models including: APX 98020-P1, APX 5.0P-B1, APX 98020-P1 Power Module Battery Module, APX 98020-P1, Power Module Battery Module, Module Battery Module, Battery Module, Module
Index of /pdfs
Install the anti-tipping plates on both sides and tighten the two screws. Fix the bracket on the wall. Fix the battery module on the bracket. APX 5.0P-B1 ...
File Info : application/pdf, 2 Pages, 9.71MB
DocumentDocumentQuick Installation Manual APX 5.0~30.0P-S1 Shenzhen Growatt New Energy Co.,Ltd. 1 Environment requirements Max.+50 Installation tools M6 Dimensions APX 98020-P1 (Power Module) APX 5.0P-B1 (Battery Module) 295 295 Min.-10 M6 2 N·m 690 690 RH +5%~+95% M4 1 N·m Left trim-cover*1 1-2 Checking the APX 5.0P-B1 packing list Unit:mm 185 APX 5.0P-B1BM) Right trim-cover*1 }to Battery Module Parallel cable *1 A B C 185 A Anti-tipping plate *2 B M6 expansion screw *2 Trim-cover *2 Warranty card *1 C M4x9 stainless steel screw *3 1-3 Check accessories 1. Inspection upon delivery 1- 1 Checking the APX 98020-P1 packing list Please check that the contentsare complet }to PCS APX 98020-P1 (PM) to PCS to PE }to Battery Module System cable C Marking-off template D A B A Operation Manual *1 B Quick installation manual *1 C Warranty Card *1 D Marking-off template *1 A B C DE A Protective rubber ring *4 B Anti-tipping plate *2 C M6 expansion screw *2 D M6x12 stainless steel screw *1 E M4x9 stainless steel screw *3 2 APX 98020-P1 A APX 5.0P-B1 B *8 *6 *4 Wall bracket C }2.5 meters APX 5.0P-B1 Parallel extension cable D *2 APX 5.0P-B1 Base E 2.5 meters Cascading cable F Battery Capacity 5kWh 10kWh 15kWh 20kWh 25kWh 30kWh Floor-mounted Installation Wall-Mounted Installation Compound Mode Compound Mode A+B+E A+B+C A+B*2+E A+B*2+C A+B*3+E A+B*3+C A+B*4+E A+B*4+C A+B*5+E*2+D A+B*5+C*2+D A+B*6+E*2+D A+B*6+C*2+D 3 2.Installation Environment Requirement 4. Wall-Mounted Installation 1 4-1 Installation Location Requirements Marking pen 300mm 4 5 Level 300mm 300mm 100mm 100mm Note: Install a sun/rain shade to avoid exposure to direct sunlight and rain. 3. Floor-mounted installation 3-1 Installation Location Requirements Wall Ground Ground Note: When mounted on the ground,a maximum of six battery modules can be stacked. If you are installing more than four modules you are advised to install them in two columns. 3-2 Installation Procedure Mounting Hole Dimensions Unit:mm 20kWh 15kWh 10kWh 5kWh Left 4 Right 1 2 3 1 2 Install the connecting pieces on both sides and tighten the two screws . 3 Level the battery modue using a level. 4 Install the anti-tipping plates on both sides and tighten the two screws . 5 Mark the hole positions. 2 4 5 M6 expansion screw Dia 8.0mm Marking-off template 90° 1 Deep45~50mm 2 3 1 The marking-off template ensures that the alignment marks are properly. 2 3 4 5 Fix the M6 expansion screw into the wall. 3 3 Install the connecting pieces on both sides and tighten the two screws. 3 4 4 Secure the module on both sides to the wall. Ground Ground Note: When mounted on the wall,a maximum of five battery modules can be stacked. Please ensure that the load-bearing capacity of the wall exceeds 280 kg. 34-2 Installation Procedure Mounting Hole Dimensions Unit:mm 20kWh 15kWh 10kWh 5kWh 1 2 1 Loosen two screw, move up the handle on both sides. 2 Tighten the two screws, fix the two battery modules. 4 1 3 Install the connecting pieces on both sides and tighten the two screws. 3 4 4 Secure the module on both sides to the wall. 1 2 1 Loosen two screw, move up the handle on both sides. 2 Tighten the two screws, fix the battery and the power modules. 5 Left Right install the wall bracket 6 2 Dia 8.0mm 1 2 90° Deep45~50mm 3 Level Marking pen 1 Level the battery Module using a level. 2 Mark the hole positions. 3 Drilling eight holes. Secure the module on both sides to the wall. The battery supports power and capacity expansion. A maximum of six battery modules can be connected to a single power module. DC input cable MOD 3-10KTL3-XH Signal cable MOD 3-10KTL3-XH MOD 3-10KTL3-XH Loosen two screws, move up the handle on both sides. Tighten the two screws, fix the battery and the power modules. 2.5kW/5kWh MOD 3-10KTL3-XH 5kW/10kWh MOD 3-10KTL3-XH 7.5kW/15kWh MOD 3-10KTL3-XH Install the anti-tipping plates on both sides and tighten the two screws. Fix the bracket on the wall. Fix the battery module on the bracket. APX 98020-P1 terminal & key description 1 BAT- Battery negative terminal to connected to the PCS 9 2 BAT N Battery neutral terminal to connected to the PCS 1 2 3 BAT+ Battery positive terminal to connected to the PCS 3 4 INV Communication terminal connect to the PCS 4 5 BMU Communication terminal connect to the battery module (Link-in) 8 Connect to the positive battery 5 6 Module+ termi-nal of the Battery Module (B+) 6 7 Connect to the positive battery 7 Module- termi-nal of the Battery Module (B-) 8 USB USB terminal 9 Start Start key 7.5kW/20kWh Wiring diagram 7.5kW/25kWh 7.5kW/30kWh NOTE:Battery modules MUST be paralleled with B+ to B+,B- to B- M6 expansion screw Marking-off template The marking-off template ensures that the alignment marks are properly palaced on the wall. Fix the M6 expansion screw into the wall. Secure the module on both sides to the wall. Loosen two screws, move up the handle on both sides. Tighten the two screws, fix the two battery modules. 5-2 APX 5.0P-B1 Connection end face introduction 76 Communication terminal 1 Link-in Connect to another BM(Link-out) or the PM(BMU) Communication B+ B- Link-in 1 Communication terminal 2 Link-out Connect to another BM(Link-in) or the PM(BMU)Communication 3 B+ Battery positive terminal Connect to another BM(B+) 4 B- Battery negative terminal Connect to another BM (B-) 2 5 USB USB terminal Link-out B+ B- Battery negative terminal 6 B- Connect to another BM(B-) or the USB 5 PM (Module-) 34 Battery positive terminal 7 B+ Connect to another BM(B-) or the PM (Module-) PE 2 N·m 1 N·m APX 5.0-30.0P-S1 MOD 3-10KTL3-XH Silk screen Terminal serial number Definition Silk screen Terminal serial number Definition 1 WAKE- ( W-) 10 BAT.EN- 2 WAKE+( W+) 9 BAT.EN+ INV COM 7 RS485_B(B) 8 RS485B2 8 RS485_A(A) 7 RS485A2 MOD3-10KTL3-XH Lnstalling the trim-cover Note: It is not recommended to install a DC circuit breaker between the battery system and the PCS. If you want to install a DC circuit breaker with rated working voltage greater than 1000V and rated working current greater than 63A, do not operate the DC circuit breaker with power-on,otherwise the machine may be damaged. Connector APX 98020-P1 Left trim-cover APX 98020-P1 Right trim-cover 6. Terminal Connection Power terminal Installer side Installer side 7. Key operation Power on 1. Turn on the DC Switch 2. Press the start key for more than 5S Power off Turn off the DC Switch (waiting for over 90S) Note: 1. Before performing maintenance and repair work, ensure that the AC circuit breaker and the PV switch of the PCS, as well as the switch of the APX are disconnected. Wait for 15 minutes after the sys-tem is powered off and make sure that the LOGO (GROWATT) indicator on the APX is off. Do not perform any operations until the system is completely shut down. 2. When multiple battery systems are used in parallel connection, you only need to press the start key of one module to start the system. 8. Service and contact Shenzhen Growatt New Energy Co., Ltd 4-13/F, Building A, Sino-German (Europe) Industrial Park, Hangcheng Ave, Bao'an District, Shenzhen, China +86 755 2747 1942 service@ginverter.com W:www.ginverter.com Download Manual Growatt New Energy GR-UM-339-A-00 12