SOFT TOP
Removal and Installation of Roof Actuator
REMOVAL
- Remove soft top assembly. Refer to RF-87, "Removal and Installation of Soft Top Assembly".
- Remove nuts and then remove roof actuator (RH/LH).
NOTE: If removal is difficult, rotate motor axis to remove them.
[Diagram: Roof actuator assembly attached to soft top frame with nuts.]
- Disconnect soft top actuator harness connector.
INSTALLATION
Install in the reverse order of removal.
Removal and Installation of 5th Bow Drive Unit
REMOVAL
- Uninstall soft top assembly from the vehicle.
- Remove roof actuator (RH/LH) from the soft top.
NOTE: If removal is difficult, rotate motor axis to remove them.
[Diagram: Roof actuator assembly attached to soft top frame with nuts.]
- Disconnect 5th bow operating rod (RH/LH) at the frame side by pulling out the holder.
NOTE: This step will make the 5th bow up and down motion easier.
[Diagram: 5th bow operating rod connected to frame via holder; shows removal action.]
- Make sure that the limit switch contact around the rotation axis of the 5th bow on the left side of soft top is protected with tape.
- Open the soft top manually, and put a stand under the 1st bow. Then fix the soft top not to move during this procedure.
NOTE: Put a waste cloth between the front lock and the stand not to make any scratches to the soft top.
- Remove the C link and 5th bow weatherstrip.
- Remove the soft top cover retainer (5th bow retainer) from 5th bow by taking out screws.
[Diagram: Soft top cover retainer attached to 5th bow with screws.]
- Drilling rivets attaching the soft top cover to 5th bow, then pull up the soft top cover bottom edge.
NOTE: Use 4 mm (0.16 in) diameter drill bit to remove the rivet head. When drilling rivets, be careful not to damage the soft top cover.
- Drilling rivets with retainers attaching with tags from the soft top cover, 5th bow finisher and the 5th bow.
NOTE: Use 4 mm (0.16 in) diameter drill bit to remove the rivet head. The soft top cover is separated from 5th bow.
[Diagram: Soft top cover, 5th bow finisher, and 5th bow connected by retainers and rivets.]
- Drilling rivets under retainers by using 4 mm (0.16 in) diameter drill bit.
[Diagram: Rivets securing retainer to 5th bow, showing drilling action.]
- Remove pads from 5th bow finisher.
[Diagram: Pads attached to the 5th bow finisher.]
- Roll the soft top cover bottom edge up, and disconnect defogger harness connector from the rear window glass.
[Diagram: Defogger harness connector disconnected from rear window glass.]
- Pull out glass stays from sleeves on each side of the rear window glass.
[Diagram: Glass stays being pulled from sleeves on rear window glass.]
- Remove 5th bow side finisher (RH/LH) by removing screws.
[Diagram: 5th bow side finisher removed using screws.]
- Remove 5th bow finisher by pulling the finisher up.
[Diagram: 5th bow finisher being pulled upwards, possibly indicating clips.]
- Remove glass stays from 5th bow by removing screws from the bottom of the 5th bow.
NOTE:
- When removing glass stays, support 5th bow to avoid a bend of glass stay. This bend may happen by the weight of the 5th bow and the tensile force of the tether from the soft top cover.
- Be careful not to damage the 5th bow nor to be hurt by the falling 5th bow, because the 5th bow is heavy and moves freely after removing glass stays.
[Diagram: Glass stays removed from 5th bow using screws; shows protection tape.]
- Disconnect 5th bow drive unit harness connector.
[Diagram: 5th bow drive unit harness connector disconnected via screw.]
- Remove 5th bow drive unit and rails together from 5th bow by removing screws.
NOTE:
- After removing drive unit and rails, not to pull rails. Otherwise, the wire in the rail may be damaged.
- The screws are not reusable.
[Diagram: 5th bow drive unit and rails attached to 5th bow with screws; shows screw locations.]
INSTALLATION
Preparation Work
- Blow remains of rivet toward both ends of 5th bow with compressed air if they are entering into 5th bow.
[Diagram: Air gun used to blow rivet remains from 5th bow.]
- Remove the remains drawn to both ends by the air blow from the gap.
[Diagram: 5th bow showing "remains take out hole" for debris removal.]
- For fixing harness to 5th bow and Soft top frame, see next figure.
[Diagram: Views A-D showing harness clamps securing wiring to 5th bow and soft top frame.]
[Diagram: Overall routing of harness along 5th bow secured with unwoven cloth tape; arrows indicate attachment points.]
Harness Routing and Securing
[Diagram: Detailed routing of "No. 5bow motor harness" secured with tape, clips, and bands.]
[Diagram: Detailed routing of "No. 5bow motor harness" secured with tape, clips, and bands.]
[Diagram: Routing of "No. 5bow motor harness" along soft top frame, secured with tape and clips.]
- Replace rivet retainer on back of 5th bow finisher with a new one.
- Secure 5th bow finisher with rivet, and then apply nonwoven fabric.
- Install 5th bow finisher and 5th bow finisher (RH/LH).
- Apply pad on 5th bow finisher.
NOTE: Apply pad to the original position.
[Diagram: Retainer, pad, and finisher placement on 5th bow.]
Installation
Install in the reverse order of removal.