Installation Guide for FLT models including: WLB Series Solar Bollard, WLB Series, Solar Bollard
WLB | FLT
File Info : application/pdf, 2 Pages, 964.17KB
DocumentDocumentINSTALL INSTRUCTIONS WLB Series Solar Bollard PRIOR TO INSTALL Ensure install location receives at least 2 to 3 hours of midday sun on average. Please handle bollard with care as scratches will affect appearance and powder coat durability. TOOLS REQUIRED · 5/32 inch hex key · 3/4 inch wrench or deep socket · 9/16 inch wrench / socket Head Post ¼-20 Screws Baseplate Footing 1. INSTALL ANCHOR BOLTS With a one to two foot setback from the path or area to be illuminated, install concrete footing with supplied anchor bolts. Align anchor bolts to path as shown below using the supplied cardboard template to hold the bolts in position. Path FLT Document 70-0008 | 20-01-2025 © Copyright First Light Technologies www.FLT.com info@FLT.com Toll Free: 1 (844) 279-8754 INSTALL INSTRUCTIONS WLB Series Solar Bollard 2. INSTALL BASEPLATE Unpack baseplate and place on footing. Use supplied nuts to secure baseplate to footing. * Supplied leveling nuts can be placed below baseplate but are optional. Nuts Baseplate Footing 3. MOUNT BOLLARD Remove the ¼-20 screws from baseplate. Mount the bollard onto the baseplate and fasten with the ¼-20 screws and tighten to 65 in-lbs. (Note, when the bollard is taken out of the box, it will turn on briefly. This is normal) To test light operation, simply shade the solar panel with the cardboard liner in the shipping box. If the light comes on when the panel is covered, the light is working correctly. 4. INSTALL COMPLETE If you require assistance, please call 1 (844) 279-8754. FLT Document 70-0008 | 20-01-2025 © Copyright First Light Technologies www.FLT.com info@FLT.com Toll Free: 1 (844) 279-8754