Installation Guide for FLT models including: WLB Series Solar Bollard, WLB Series, Solar Bollard

WLB Installation Instructions

WLB | FLT


File Info : application/pdf, 2 Pages, 964.17KB

PDF preview unavailable. Download the PDF instead.

WLB
INSTALL INSTRUCTIONS
WLB Series Solar Bollard

PRIOR TO INSTALL
Ensure install location receives at least 2 to 3 hours of midday sun on average. Please handle bollard with care as scratches will affect appearance and powder coat durability.
TOOLS REQUIRED
· 5/32 inch hex key · 3/4 inch wrench or deep socket · 9/16 inch wrench / socket

Head Post

¼-20 Screws
Baseplate
Footing
1. INSTALL ANCHOR BOLTS
With a one to two foot setback from the path or area to be illuminated, install concrete footing with supplied anchor bolts. Align anchor bolts to path as shown below using the supplied cardboard template to hold the bolts in position.

Path
FLT Document 70-0008 | 20-01-2025 © Copyright First Light Technologies

www.FLT.com info@FLT.com Toll Free: 1 (844) 279-8754

INSTALL INSTRUCTIONS
WLB Series Solar Bollard

2. INSTALL BASEPLATE
Unpack baseplate and place on footing. Use supplied nuts to secure baseplate to footing. * Supplied leveling nuts can be placed below baseplate but are optional.
Nuts

Baseplate

Footing

3. MOUNT BOLLARD
Remove the ¼-20 screws from baseplate. Mount the bollard onto the baseplate and fasten with the ¼-20 screws and tighten to 65 in-lbs. (Note, when the bollard is taken out of the box, it will turn on briefly. This is normal) To test light operation, simply shade the solar panel with the cardboard liner in the shipping box. If the light comes on when the panel is covered, the light is working correctly.
4. INSTALL COMPLETE
If you require assistance, please call 1 (844) 279-8754.

FLT Document 70-0008 | 20-01-2025 © Copyright First Light Technologies

www.FLT.com info@FLT.com Toll Free: 1 (844) 279-8754



References

Adobe PDF Library 17.0 Adobe InDesign 18.1 (Macintosh)