
Installation Guide for enegic models including: Power Management For Your EV Charger, Management For Your EV Charger, Your EV Charger, EV Charger, Charger
| Our downloadable Enegic content | Enegic.com - Perific
v1.3 TABLE OF CONTENTS Power management for your EV charger Integration guide - Charge Amps English 1 Svenska 2 Français 3 Suomi 4 Deutsch 5 Español 6 Nederlandse 7 Norsk 8 Português 9 Danska 10 Enegic Integration guide - Charge Amps English Before you start: A Monitor must be installed and configured to measure total consumption. The Charge Amps charging box must be commissioned and linked to an installation on a user account with Charge Amps. Follow these steps to integrate with Charge Amps In the Enegic app, go to 1 Settings, Licenses. Scan the QR code on the included integration license. Go to Settings, 2 Reporters and Add new Reporter. Select Charge Amps 3 Charge Control as the type of reporter. Enter an appropriate 4 name such as "Charge Amps charge control". Then press Get Serial Number and PIN The serial number and 5 PIN that you generated should both be entered into Charge Amps Partner in the Measurement device that will be connected to the charging box. my.charge.space/partner. Enter main fuse size. 6 Ensure the correct 7 Enegic monitor is selected as total consumption measurement. Then press Save. 8 To do in Charge Amps Partner Create a new Measurement Device under the current user with the generated serial number and PIN from the Enegic reporter m Create a new Load Balancer and connect to the current user. Add Measurement Device and charging box j When all settings are made, the Measurement Device will be displayed with a status of ACTIVE indicating that the Charge Amps system has started receiving data from the Enegic reporter. 9 Charge control Enegic Monitor is now integrated with Charge Amps The charging box(es) in the Charge Amps installation you have integrated with now retrieve power values from Enegic, which enables a safe and efficient power output. In the overview in the app, you will now see that Charge Amps Charge Control has been created: From here you can control the charging boxes in the facility by activating optiCharge.Adobe Acrobat Pro (64-bit) 23.8.20470 Adobe Acrobat Pro (64-bit) 23.8.20470