How to insulate your home and understand u-values with plasterboard

GTEC Thermal Board

Etex Building Performance

How to insulate your home and understand u-values with ...

5 ott 2022 — U-value, what does it mean? Put simply, a U-value is the measurement of the rate of heat loss through a material. So in all aspects of.


File Info : application/pdf, 20 Pages, 3.00MB

PDF preview unavailable. Download the PDF instead.

Siniat GTEC Tapered Edged Thermal EPS Plasterboard Guide
how to:
insulate your home and understand u-values
with plasterboard
GTEC Thermal Board

1
MANdireUctFfrAomCtTheURER
building insulation
The regulations Building regulations are in place to drive improvements in thermal efficiency. These regulations apply to new build, renovation or replacement work. -- England and Wales:
Part L Building Regulations -- Northern Ireland:
Technical Standard F1 -- Scotland: Technical Handbook
Domestic, Section 6 (energy) Thermal efficiency within these documents is expressed as a U-value.

2
U-value, what does it mean? Put simply, a U-value is the measurement of the rate of heat loss through a material. So in all aspects of home building and renovation customers should strive for the lowest U-values possible. The lower the U-value, the less heat will be unnecessarily lost.
The calculation of U-values can be quite complex. It is measured as the amount of heat loss through a 1m2 of material for every degree difference in temperature either side of the material. However, Siniat are here to help.
How to calculate u-values Download our free Siniat Calculator App from the Apple or Android stores, use the App on our website or contact one of our Technical Services Team who will help calculate your U-value for you.
What you need to tell us 1. What type of construction is the wall/roof of
your project? Or what age is your property?
2. For walls/roofs -- What is the construction of the wall/roof outside to in? -- What insulation products are currently in the wall/roof? -- Do you know the thermal values of these products? -- What u-value do you need to meet?
3. Building address (needed for calculating the condensation risk).
The Siniat Technical Services team can be contacted between
9am ­ 5pm Monday to Friday 01275 377 789

3
how to select your thermal board

bes t

GTEC Thermal K board

-- 50% thermal improvement over
EPS

+40%

GTEC EPS.

-- Vapour barrier provided as standard.

-- Available in thickness from 30 to 70mm.

GTEC Thermal PIR board
EPS -- 40% thermal improvement over
+40%
GTEC EPS. -- Vapour barrier provided as standard. -- Available in thickness from 37.5 to
82.5mm.

GTEC Thermal XP board

-- Over 10% thermal improvement over
EPS

+10

GTEC EPS.

-- Available in thickness from 27 to 55mm.

better

good

GTEC Thermal EPS board
-- Our basic level thermal resistance. -- Available in thickness from 22 to 50mm.

basic

4
Save your client up to 37% on annual heating costs with a thinner profile than PIR board.
(Source: GDF Home Energy Assessors. Based on Pre-Victorian stone detached house)
Save your client up to 37% on annual heating costs.
(Source: GDF Home Energy Assessors. Based on Pre-Victorian stone detached house)
Save your client up to 32% on annual heating costs.
(Source: GDF Home Energy Assessors. Based on Pre-Victorian stone detached house)
Save your client up to 21% on annual heating costs.
(Source: GDF Home Energy Assessors. Based on Pre-Victorian stone detached house)

5
controlling condensation
Adding additional insulation layers to a building to prevent heat loss, helping the environment and lowering heating bills is, of course, a good thing, however there are some challenges.
When you apply internal insulation to an external wall, the wall becomes colder. This creates a danger that vapour from inside the home will get trapped behind the insulation, and as it cools it can condense on and inside the wall fabric, in the same way that you get condensation on the surface of single glazed windows. This invisible condensation inside a wall is called interstitial condensation. This condensation can lead to substantial problems of damp, mould and rotting of timber elements.
GTEC Thermal PIR and Thermal K boards have a metallised vapour barrier provided as standard, the vapour barrier sits between the plasterboard and foam layers.
The vapour control layer helps prevent the passage of warm moist air from inside the property from permeating into the wall structure or into the roof space, where it can condense and cause damage.

6
Plasterboard Metallised vapour barrier Insulating foam
GTEC Thermal K board
GTEC Thermal PIR board

7
how to install using dot & dab method
Thermal board can be installed by either Dot & Dab or Dryliner method. The Dot & Dab method should only be used for walls that already include a cavity.

Universal Bonding Compound
Nailable Plug

Continuous bonding compound ribbon 50mm from top of board
Thermal Board to suit required performance

Cut board to receive socket box

Max. spacing of 400mm

Continuous dab around socket boxes

Continuous bonding compound ribbon 50mm from base of board

8
Installation 1. Starting from a window, door reveal or internal
angle, mark the wall vertically with a chalk line for the row of dabs. 2. Using Siniat Universal Bonding Compound place a continuous ribbon 50mm at the top and bottom of the board. 3. Then place your dabs on the wall making sure that they are 250mm x 75mm in size and at 300mm centres. 4. A maximum spacing of 400mm horizontally should be used. A continuous ribbon should be placed around any plug sockets or light fittings. 5. Press the plasterboard in place against the dabs fitting the board tightly against the ceiling using a wedge or off cut at the base. 6. Tamp the board into place with the floor and ceiling chalk lines using a straight edge. 7. Use two Nailable Plugs to suit board depth, fitted through holes drilled in the board through the dab cavity and penetrating 25mm into masonry.
(Tip: Wait until the dabs have set before fitting plugs to avoid moving or bending the board.)
8. Remove wedges when compound has dried (allow 8 hours).
9. Finish boards as per instructions at the back of this guide.
Check out our Dot & Dab `how to' video on our dedicated Siniat UK Channel youtube.com/siniatukchannel
NB: GTEC Thermal boards must be mechanically fixed for fire safety. 2 x nailable plugs need to be installed 300mm from the top of the board and 25mm from each edge, penetrating 25mm into the masonry wall.

9
how to install using dryliner
The dryliner method should be used when upgrading an existing solid wall or to create a cavity.

GTEC Dryliner
Track
GTEC Dryliner Bracket

Thermal board to suit required performance

GTEC Dryliner Track
GTEC Dryliner Channel
Check out our Covering Uneven Walls `how to' video on our dedicated Siniat UK Channel: youtube.com/siniatukchannel

10
Installation 1. Fix a dryliner track at 600mm centres to the
floor and ceiling using suitable fixings. Allow for required cavity of at least 25mm. 2. If applying direct to concrete make sure that the surface is dry and a damp proof membrane has been used. Ensure that the large flange of the dryliner track is on the plasterboard side. 3. Mark vertical lines at 600mm horizontal centres to fix the dryliner channels. 4. Start at the centre of the wall and position the dryliner brackets directly to the wall at a maximum 800mm vertical centres on the marked lines (at shoulder and waist height). Secure using suitable fixings. Fold out the toothed wings of each bracket to form legs. 5. Cut each dryliner channel 5mm shorter in height from the floor to the ceiling and place into the dryliner track. 6. Ensure channel is plumb and secure to each bracket using a GTEC Pan Head Self Tapping Screw. 7. If installing kitchen units, install a GTEC fixing channel or timber reinforcement at the height of the wall and floor units need to be secured. 8. Cut plasterboard 5mm shorter than the floor to ceiling height. Butt the board firmly against ceiling and fix with GTEC Drywall Self Tapping screws at 300mm centres. Screws must be at least 10mm longer than the board thickness. 9. Join the plasterboard edges lightly against each other and centre the edges over the channels. 10. Finish boards as per instructions at the back of this guide.
NB: Cannot be used for cavities over 130mm.

11
how to insulate lofts and roof spaces
One of the main areas of heat loss is through the roof. This installation guide will demonstrate how Thermal Board can be installed to meet required thermal performance. Installing the board and insulation at the same time using a laminated board is less time consuming and easier than separate installations.
Joists or trusses
Check out our `how to' videos on our dedicated Siniat UK Channel: youtube.com/siniatukchannel

12
Installation 1. Remove any existing plasterboard if present. 2. Install the required thickness of glass mineral
wool or solid foam insulation between the rafters, joists or trusses ensuring no gaps. 3. Using the required thickness and type of Thermal Boards fix to the wooden rafters, joists or trusses using Siniat High Thread Screws, the screws need to be the total thickness of the board plus at least 25mm to penetrate the timber. 4. Screws to be fixed at 150mm centres around the perimeter and cut ends of the boards and 230mm centres in the centre of the boards.
Glass mineral wool or solid foam insulation
Thermal boards to suit required performance

13
how to finish the boards
Taping and Jointing is a simple finishing solution for drylining installations, to reinforce joints, to prevent cracking and to ensure fire and sound performances are achieved. It is suitable for large areas of plasterboard where speed and ease of application can greatly reduce installation time and costs versus a skim finish.
Recommended 3 stage process

Bedding and fill coat
Tape or bead is bedded into the compound and taper filled out.

1st finish coat
The taper is re-filled with compound where
required.

2nd finish coat
Final compound layer is applied and sanded for a smooth finish.

2 stage process

Bedding and fill coat
Tape or bead is bedded into the compound and taper filled out.

2nd finish coat
Final compound layer is applied and sanded for a smooth finish.

Tapered edge

14
Bed tape into layer of appropriate jointing compound

stage 1

stage 2

Siniat Joint Tape

6M0maxm. 6M0amxm.
300mm approx.

Siniat Joint Tape and bedding layer
Bedding layer down both edges of tape
Second coat feathered out beyond filling layer
Finishing layer feathered out on to plasterboard and sanded once dry

-- Boards must be stored in a dry environment. -- Ensure surfaces are clean and dry before
securely and evenly fixing. -- Tapered edge board provides the best finish
by allowing the joint tape to sit below the finished surface. -- Square edge plasterboard may also be jointed using the method on the following page.

stage 3

15
Square or cut edge

Bed tape into layer jointing compound

Siniat Joint Tape

stage 1

200mm

200mm

400mm

Siniat Joint Tape and bedding layer
Bedding layer struck off with plasterboard face
Second coat feathered out on to plasterboard
Finishing layer feathered out on to plasterboard and sanded once dry

stage 2

stage 3

-- Correct screw fixings to be used with screw heads just below surface of board.
-- Gaps over 3mm to be filled with Siniat Joint Filler or Siniat Multipurpose Joint Compound prior to tape installation.

stage 1

16
Internal corner
Tape bedded into layer of jointing compound
Siniat Joint Tape
Siniat Joint Tape and bedding layer
Second coat feathered out beyond bedded layer Finishing layer feathered out on to plasterboard and sanded once dry
-- Compound to be applied in nominal 1mm layers. Thicker layers will extend drying time.
-- Siniat Joint Tape cut to length to be pressed into bedding compound.
-- Second coat of jointing compound if required to be applied over dry joint, feathered out 50 ­ 60mm beyond the edge of first coat.
-- Finishing coat of compound feathered out 50 ­ 60mm beyond second coat.
-- Finished, dry joint to be sanded to smooth finish for sealing and decoration.

stage 2

stage 3

17
External corner
Tape bedded into layer of jointing compound
Siniat Flex Tape
Siniat Flex Tape and bedding layer Filler layer feathered out beyond bedded layer Second coat feathered out beyond bedded layer
Finishing layer feathered out on to plasterboard and sanded once dry
-- Square edge joints only: Joint width to be wider to reduce visible crowning.
-- External corners only: Siniat Flex Tape to be applied in place of Siniat Joint Tape as reinforcement.

18
Drywall and universal sealer
Once the taping and jointing process has been completed, Universal Sealer must be applied to prevent `regency striping'. When using Siniat Aqua Board, Drywall Sealer must be applied prior to painting/tiling in severe moisture areas. Regency striping
This term is used to describe the effect of the paint finish reacting differently on the joints to the surface of the board (suction), if the sealer is not applied the joints may be visible no matter how well the taping and jointing process has been completed. Once dry, a paint finish can be applied in the normal manner.

Installation tips For a step-by-step video guide and installation tips on using metal frame systems and installing thermal boards, check out our Siniat UK YouTube Channel. youtube.com/siniatukchannel
For advice with installation contact Technical Services at:
technical.siniat@etexbp.co.uk or call: 0800 145 6033
Etex Building Performance Limited Marsh Lane, Easton-in-Gordano, Bristol, BS20 0NE
+44 (0)1275 377 773
siniat.co.uk
© Etex Building Performance 0582-SIN V2/12/10/2021

