Instruction Manual for PROLED models including: L134x LED Fountain Ring, L134x, LED Fountain Ring, Fountain Ring, Ring
Anneau de fontaine Led IP68 9 Ã 2W Monochrome | Ledbox Company
File Info : application/pdf, 2 Pages, 255.72KB
DocumentDocumentMontageanleitung / Installation manual PROLED FOUNTAIN RING L134x Characteristics: LED RGB, Warm White or White Power consumption 28 W (RGB), 30 W (MONO) Stainless steel with hardened glass Power 24 VDC Operating temperature range -10° C till +40° C CE compliant with applicable European directives Warning: 1. Safety class IP68 (under water) 2. Luminaire is not allowed to be powered out of water (cooling) for longer than 15 minutes 3. Please ensure that the packaging is disposed of in a safe environment 4. If cable is defected, do not use the luminaire 5. We do recommend that a qualified electrician should be used to install the products 6. Do not look at the lighted lamp directly Safety indices: Be sure to have a qualified electrician complete installation. The customer is not entitled to claim for any lights installed without observing European safety directives. The manufacturer is then discharged from liability when damage is caused by improper use or installation. If any luminaire is subsequently modified, the person responsible for the modification shall be considered as manufacturer. Installation: Please follow the sequence of installation step by step. Non-observance can lead to damage of LED. 1. Switch off the electricity at the mains before commencing working at the luminaire. 2. Screw the luminaire onto the fountain output so far, that it is made sure, that the luminaire is always under water. Cooling by water is needed. 3. Do not install deeper than 1m. 4. Connect power supply (24 VDC) or dimmer to the luminaire. 5. Switch on back the main power supply and test luminaire. Pl,ease do not power luminaire longer than 15 minutes out of water. Using inside water is a must because of cooling. 6. If you are in any doubt regarding these instructions, consult a qualified electrician. Connection diagramm: PSU 24VDC IP68 MBN GmbH Balthasar-Schaller-Str. 3 86316 Friedberg Germany www.proled.com Installation picture: 1. Montageanleitung / Installation manual 2. 1 = Light output 2 = Light body 3 = Connection 10.20 Technical amendments reserved MBN GmbH Balthasar-Schaller-Str. 3 86316 Friedberg Germany www.proled.com