INSTALLATION INSTRUCTIONS DIVINE 72 - Anolis Lighting

23 ott 2021 — The unit must be installed by a qualified electrician in accordance with all national and local electrical and construction codes and regulations.

PDF preview unavailable. Download the PDF instead.

Installation Instructions Divine 72 v1 May 2021
INSTALLATION INSTRUCTIONS DIVINE 72
The unit must be installed by a qualified electrician in accordance with all national and local electrical and construction codes and regulations. This device falls under class one and must be grounded!
STEP 1 CABLE GLAND 1A For bottom connection

1B For side connection

Inlets for power and data from bottom side of the luminaire.
STEP 2 UNCOVER JUNCTION BOX

Inlets for power and data from side of the luminaire.

Uncover junction box located on the bottom side of luminaire.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 1.0 / 05_2021

1

INSTALLATION INSTRUCTIONS DIVINE 72
STEP 3 CONNECTION 1 Strip these lenghts for cable connections

Power Connection Data Connection

A
9mm 7mm

3A Wiring connection (control menu inside)

2 Connection ­ colour coding
To connect the Divine 72 to mains and a DMX controller, use a 5-cored cable Flamar Li9YC11Y. The 3 colors serve for the power supply and 2 shielded cores are intended for DMX connection.

WIRE
Brown Blue Yellow/Green

Power and Data Connection

POWER CONNECTION
L
N
Ground

WIRE
White Red Shielding

DATA CONNECTION
Data - (D-)
Data + (D+)
Data Ground (0V)

3B Wiring connection (control menu outside)

STEP 4 CONTROL MENU
1A Control menu inside

1B Control menu outside

Set control menu inside junction box.

Set control menu.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 1.0 / 05_2021

2

INSTALLATION INSTRUCTIONS DIVINE 72
STEP 5 CLOSE JUNCTION BOX

STEP 6 CABLE GLAND INSTALLATION
Use wrench size 24 for cable gland M20x1.5 Use wrench size 16 for cable gland M12x1.5
Install Cable glands individually!

Before applying the torque, make sure the thread is clean and functional.
STEP 7.A INSTALLATION WITH SURFACE MOUNT ADAPTOR 1

We recommend to apply an adequate layer of the paste LOCTITE 5331 on the plastic holder of the cable gland before inserting in into the body of the gland and an adequate layer of the paste LOCTITE 577 on the thread ofthe gland body. Failure to properly install cable glands will result in failure of the water tight seal!
2

Mount the adaptor using 6 mounting screws.
STEP 7.B INSTALLATION WITH SET OF RUBBER FEET

Drill holes to the surface according to holes spacing. Mount Divine via mounting holes on the surface.
STEP 7.C INSTALLATION WITH C-CLAMP ADAPTOR

Mount pair of rubber feet using 4 screws.

Mount the adaptor using 5 screws.

ROBE lighting s. r. o. | Palackeho 416 | 757 01 Valasske Mezirici | Czech Republic | Tel.: +420 571 751 500 | E-mail: info@anolis.eu | www.anolislighting.com

VERSION 1.0 / 05_2021

3

INSTALLATION INSTRUCTIONS DIVINE 72
ACCESSORIES Optical Demo Set

STEP 8 INSTALLATION OF ACCESSORIES
1

Unscrew two screws and split accessory to two parts. Place each part onto the luminaire´s head and screw them together.
STEP 9 HEAD POSITION ADJUSTMENT 2

Secure accessory by 4 screws with spring washer at the back side of luminaire´s head.

Release locking screw on each sides. Angle fixture to desired position and tighten locking screw on each sides.