Lux power inverter support “Parallel Connection”, which means you can combine multiple inverters together to get bigger back-up power. As parallel model is ...

Eco-hybrid-parallel-installation-guidance
SONAR Parallel Installation Guide
PART1: Single Phase Parallel System Wiring Lux power inverter support "Parallel Connection", which means you can combine multiple inverters together to get bigger back-up power. As parallel model is different from standard one, please make it clear to the distributor if you want a parallel unit. This document is used to show how to set up a parallel system.
Step1. Single unit installation Install each single phase inverter as user manual. Before installation, please make sure the distance between each inverter meet the requirements of user manual.
Step2. Parallel system wiring If you paralleling the system as single phase system, the most important thing is to make sure the L & N lines of each unit (AC port And EPS port) are correctly connected, please check with multi-meter to make sure L cable of each units are connected. Do not connect one inverter's L cable to another inverter's N cable. Wiring the parallel system as below suggestions for safety and cost reasons. Three single phase inverters in parallel diagram:

Not share the battery

Share the battery

 Recommend Capacity Section of battery:

Inverter parallel numbers
Battery Capacity
*At least 200AH per unit

2 400AH

3 600AH

4 800AH

5 1000AH

6 1200AH

 Cross Section of connection cable:

Position AC Input to QF1 AC Output to QF1 GEN Port to QF1 QF1 Port to SA1 SA1 to AC SA1 to AC SA1 to AC

Cross SectionLength
5.26 5.26 5.26 5.26 6 *3 5.26 *3 5.26 *3

20m Note
Maximum Grid current is 40A Nominal current is25A Maximum current is 25A Maximum current is 25A Maximum current is 40A*n Maximum current is 25A*n Maximum current is 25A*n

**1) Copper wire 1

safe current carrying capacity is 5 amps (within 20 meters distance)

2) The PE line can be chosen between 6~10 3) N means the number of parallel

 Breaker section:

Position QF1

Section

QF2
SA1

230Vac 63A
2poles

Note
Maximum AC Input current is 40A Maximum AC Outnput current is 45A (2*5KW Maximum ) Maximum GEN Input current is 40A (AC Charge+AC Output Load)

60DC

The maximum current is 140A

160A

2poles

230Vac/ N is the number of parallel 380Vac units
N*40A

2pole

**The SA2 is used as a back-up switch to supply the AC OUTPUT load when the system is power off. TYPE selection as SA1. And the current and capacity depends on the AC OUTPUT loads.
!!Be sure the SA2 is only used when all inverters is power-off.
Step3. Set up the parallel CAN communication balance resistance.  Connect parallel communication cable. The port4 are used for parallel connection.  Switch  are used for the parallel communication balance resistance.
 If there are more than two inverters parallel in your system, only two of longest distance of need to be dialed toward "on "position: , and others keep off:

12PCS
 For other ports' definition, please refer to user manual.  Please double check if the wirings are correct.  The parallel port are pin-to-pin with each other for PIN1~PIN8, and you can buy this easily
in any computer shop
 Step4. Set up the monitor system and do settings Power on the inverter and connect Wi-Fi to dongle to internet.  For parallel system battery connection, we support 2 ways to connect, you can either
connect all inverters to one battery bank or connect each inverter to separate battery group. Or it is connected as each inverter conncet to separate battery. If you connect one battery bank shared by multiple inverters as the diagram above, please enable "Battery shared".

 Step5. Running the system Check all connection and make sure is correct. Power on all Units and Check the all AC output is OK Turn on all breakers

PART2: Three Phase System Wiring
Step1. Install each single inverter as user manual
Lux power inverter support three phase system, which means 3 pcs or more inverters can be used to compose a three phase system. Please note that this model is different from the standard one, please make it clear to distributor to get parallel unit. This document is used to show you how to set up a three phase system.
Step2. Parallel connection
Wiring the parallel system as below suggestions for safety and cost reasons. When paralleling the system as three phase system, make sure there is at least one inverter in each phase. DO NOT connect AC Output terminals all together when used in 3 phase system, otherwise you will short the grid/utility.
Three phase system composed by three inverters diagram:

Must share the battery

 Recommend Capacity Section of battery:

Inverter parallel numbers
Battery Capacity
*At least 200AH per unit

3 600AH

4 800AH

5 1000AH

6 1200AH

 Cross Section of L1,L2,L3&N lines:

Position
AC Input (L1,L2,L3&N) to
QF1
AC Output (L1,L2,L3&N) to
QF1
GEN (L1,L2,L3) to QF1
BATTERY to QF2
AC Input (L1,L2,L3&N) / AC Output (L1,L2,L3&N) to Per
SNA5000

Cross SectionLength 8
5.26

20m Note
Maximum Grid current is 40A Nominal current is25A

8 20 5.26

Maximum current is 25A Maximum current is 25A Nominal current is25A

**1) Copper wire 1

safe current carrying capacity is 5 amps (within 20 meters distance) for AC and EPS lines.

2) The PE line can be chosen between 3~4
!!Be sure the SA1is only used when all inverters is power-off.

 Breaker section:

Position

Section

QF1

QF2

230Vac
23A
3poles
60DC 160A

Note
Maximum AC Input current is 40A (AC Charge+AC Output Load) Maximum AC Outnput current is 23A Maximum GEN Input current is 40A (AC Charge+AC Output Load) N is parallel number per phase
Normal Maximum working current is 110A

2poles

SA1(DOUBLE SOURCE SWITCH)

230Vac/380 Vac
60A
2~3pole

 Step3. Set up the parallel CAN communication balance resistance.
 Connect parallel communication cable. The port4 are used for parallel connection.  Switch  are used for the parallel communication balance resistance,

 If there are only three inverters parallel in this three-phase system,Switch of No.1 and No.3 need to be dialed toward "on" position: , and No.2 keeps off:
The maximum parallel quantity is 12pcs
 For other ports' definition, please refer to user manual.  Please double check if the wirings are correct.  Please double check if the wirings are correct.  The parallel port are pin-to-pin with each other for PIN1~PIN8, and you can buy this easily
in any computer shop
 Step4. Set up the monitor system and do settings  Power on the inverter and connect Wi-Fi to dongle to internet. For parallel system battery connection, we support 2 ways to connect, you can either connect all inverters to one battery bank or connect each inverter to separate battery group. Or it is connected as each inverter conncet to separate battery.
If you connect one battery bank shared by multiple inverters as the diagram above, please

enable "Battery shared".
 Step5. Running the system  Check all connection and make sure is correct.  Power on all Units and Check the all AC output is OK  Turn on all breakers


WPS 文字 3-Heights(TM) PDF Optimization Shell 5.9.1.5 (http://www -tools.com)