Instructions for meRcia models including: 04GREEN0406SD-V6 4x6 Greenhouse, 04GREEN0406SD-V6 Greenhouse, 04GREEN0406SD-V6, 4x6 Greenhouse, Greenhouse

04GREEN0406SD-V6 Instructions

[PDF] 04GREEN0406SD-V6 Instructions - GardenSite

For ease of assembly, you. MUST pilot drill all screw holes and ensure all screw heads are countersunk. For assistance please contact customer care on: 01636 ...


File Info : application/pdf, 12 Pages, 4.13MB

PDF preview unavailable. Download the PDF instead.

mercia-evesham-6-x-8-ft-combi-greenhouse-assembly-and-warranty-info-c65c95ae143bd5d9149d51c1b826fc98 ?srsltid=AfmBOoo Xhop2ti
General Instructions
04GREEN0406SD-V6 4x6 Greenhouse
BEFORE YOU START PLEASE READ INSTRUCTIONS CAREFULLY - Check the pack and make sure you have all the parts listed. - When you are ready to start, make sure you have the right tools at hand (not supplied) including a Phillips screwdriver, Stanley knife, Wood saw, Step ladder, Hammer and a Drill with 2mm bit. - Ensure there is plenty of space and a clean dry area for assembly.
LOCATION FOR YOUR GARDEN BUILDING A minimum of 60cm should be left around the perimeter of your garden building to allow access for maintenance, annual treatment and to allow air flow around the building.
Where possible you should avoid placing your garden building underneath large trees to prevent the tree causing damage to the building.
TIMBER As with all natural materials, timber can be affected during various weather conditions. For the duration of heavy or extended periods of rain, swelling of the wood panels may occur. Warping of the wood may also occur during excessive dry spells due to an interior moisture loss. Unfortunately, these processes cannot be avoided but can be helped. It is suggested that the outdoor building is sprayed with water during extended periods of warm sunshine and sheltered as much as possible during rain or snow.
Once your garden building has been installed it will need to be treated as soon as possible and annually to prevent the timber from deteriorating and to waterproof it. This is required to maintain the anti-rot guarantee.
Dip Treated buildings - Require a preservative treatment to protect against rot and decay and a waterproof treatment to prevent water ingress Pressure Treated buildings - Require a waterproof treatment to prevent water ingress Log Cabins - Are supplied untreated and require a preservative and waterproofing treatment.
BUILDING A BASE When thinking about where the building and base is going to be constructed: Ensure that there will be access to all sides for maintenance work and annual treatment.
Ensure the base is level and is built on firm ground, to prevent distortion. Refer to diagrams for the base dimensions, The base should be slightly smaller than the external measurement of the building, i.e. The cladding should overlap the base, creating a run off for water. It is also recommended that the floor be at least 25mm above the surrounding ground level to avoid flooding.
TYPES OF BASE - Concrete 75mm laid on top of 75mm hard-core. - Slabs laid on 50mm of sharp sand.
Whilst all products manufactured are made to the highest standards of Safety and in the case of childrens products independently tested to EN71 level, we cannot accept responsibility for your safety whilst erecting or using this product.

Please retain product label and instructions for future reference

x2 All buildings should be erected by two adults

Winter = High Moisture = Expansion Summer = Low Moisture = Contraction

2mm Drill bit

For ease of assembly, you MUST pilot drill all screw holes and ensure all screw heads are countersunk.

CAUTION Every effort has been made during the manufacturing process to eliminate the prospect of splinters on rough surfaces of the timber. You are strongly advised to wear gloves when working with or handling rough sawn timber.

For ease of assembly, you will need a tape measure to check dimensions of components.

Screws & Nails

Bolts

Measure overall length

Measure under the
head

To identify the fixings required for each step use a measuring tape.

**Protim Aquatan T5 (621)**
Your building has been dip treated with Aquatan.
Aquatan is a water-based concentrate which is diluted with water, the building as been treated by the correct application of Aquatan solution and then allowed to dry.
Aquatan is a decorative finish to colour the wood, which is applied industrially to timber fence panels and garden buildings.
Aquatan undiluted contains: boric acid, sodium hydroxide 32% solution, aqueos mixture of sodium dioctyl sulphosuccinat and alcohols: 2, 4, 6-trichlorophenol.

REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY

PLEASE SCAN HERE:

For assistance please contact customer care on: 01636 821215 Mercia Garden Products Limited, Sutton On Trent, Newark, Nottinghamshire, NG23 6QN
www.merciagardenproducts.co.uk
P 1

04GREEN0406SD-V6
Overall Dimensions: Width = 1215mm Depth = 1887mm Height = 2066mm
Base Dimensions: Width =1191mm Depth = 1862mm
Before assembly please make sure you have a suitable base ready to erect your
building

MADE IN GREAT BRITAIN

1

2

3

Door Side
AI-04GREENDS610X1543-V5
QTY 2

Sml Window Side
AI-04GREENWS1193X1543-V5
QTY 2

4

5

Lrg Window Side
AI-04GREENWS1776X1543-V5
6

Door Gable Top
AI-04GREENDGT1864X426-V5

Plain Gable Top
AI-04GREENPGT1864X426-V5

Roof (Opening Window)
AI-04GREENROOFOW1218X1037-V1

Please retain product label and instructions for future reference

7

88

99

Roof
AI-04GREENROOF1218X1037-V1

Door
AI-04GREENDOOR550X1720-V5

11010
Fascia - 12x56x1075mm QTY 4 S1256-1075mm
11
Base Frame - 44x44x1864mm QTY 2 F4444-1864mm
12
Base Frame - 44x44x1105mm QTY 2 F4444-1105mm
13
Roof Support Bar 27x44x1242mm QTY 1 F2744-1242mm (8mm LIP, X2 66DEG CUTS)
1134
Door Frame - 27x44x556mm QTY 1 F2744-556mm
15
Door strip - 12x27x1717mm QTY 2 S1227-1717mm
16
Roof trim - 12x56x1242mm QTY 1 S1256-1242mm
17
Short Door strip - 12x27x556mm QTY 1 S1227-556mm

18

19

20

Butterfly Hinges QTY 4 PI-07-0004

Window Casement Stay PI-07-0008

21

22

23

Opening Window
AI-04GREENOW560X460-V5
Window Glazing Bead QTY 8 PI-07-0063

Finial QTY 2 SHED DIAMOND FINIAL

Wooden Knob PI-04-0024

Turn Button QTY 2 PI-07-0182
P 2

Nail Bag

30mm Screw x 150 40mm Screw x 8 50mm Screw x 70 70mm Screw x 8

16mm Screws x 20 20mm Screw x 6 30mm Black Screw x 18

24
Window Strip - 12x27x926mm QTY 14 S1227-926mm
25
Window Strip - 12x27x1776mm S1227-1776mm
26
Window Strip -12x27x1193mm QTY 2 S1227-1193mm
27
Window Strip - 12x27x610mm QTY 2 S1227- 610mm
28
Strip - 12x44x543mm
29 S1244- 543mm
Strip - 12x44x993mm QTY 6 S1244- 993mm
30
Styrene 942x570x2mm QTY 9 PI-05-0151
31
Styrene 503x570mm PI-05-0158
32
Styrene 985x570mm QTY 3 PI-05-0157
33
Strip - 12x44x1218mm QTY 2 S1244- 1218mm

34

Window Cill 610mm QTY 2

PI-08-0021

35
Window Cill 1193mm QTY 2 PI-08-0019

36

Window Cill 1776mm

PI-08-0020

37
Strip - 12x21x560mm S1221- 560mm

38
Corner Trims - 12x56x1576mm QTY 4 S1256- 1576mm

Please retain product label and instructions for future reference
P 3

Pre Assembly

Step 1

Before assembling remove the transportation blocks from the bottom of each panel.

Lay the base frame down as shown in the diagram. Ensure the base is square and layed on level ground. Fix the base framing (No. 11)& (No. 12)together with 2 x 70mm screws per corner, pre drill to avoid splitting the timber.

8x70mm screws.

Pre drill hole

70mm screw

11
12
Side

Step 2
Assemble the window panels on the floor.
Place the plastic window cill onto the lip of the window panel externally.
1b. Lay the styrene on top of each opening so that it overlaps the surrounding framing equally on both sides as per the diagram.
Styrene
Window Cill

Rear Styrene

12
11
Front

Styrene

Styrene

Please retain product label and instructions for future reference
Step 3
Attach the window strips using 3x30mm screws as per the diagram, starting with the top strip. Ensure the framing does not protrude the width of the window frame.
Ensure you screw into the window strips to the side of where the styrene meets the window frame.

81x30mm

Pre drill hole

30mm screw

27

25

24

30

Styrene

34

24
Styrene
36

Styrene

Styrene

26

24
Styrene

Styrene

35

P4

Step 4

Fix the corners of the Sml Window Side (No. 2) and the Lrg Window Side (No. 3)

3

2

with 3x50mm screws as shown in the

diagram.

*The large window side sits inbetween the two side panels.*

3x50mm screws.

Pre drill hole

50mm screw

Rear

Side

Front

Please retain product label and instructions for future reference

Step 6
Fix the Door Sides (No. 1)between the window panels using 6x50mm screws.
6x50mm Screws.

Pre drill hole

50mm screw

1 1

Step 5
Fix the remaining Sml Window Side (No. 2)at the corner using 3 x 50mm screws.
2
3x50mm screws.

Pre drill hole

50mm screw

Step 7

Fix the Door frame (No. 14) to the base frame between the Door sides. This allows for the door sides to be correctly spaced.

3x40mm Screws.

Pre drill hole

50mm screw

14

Rear

Side

Front

P 5

Step 8

Fix the Gable tops (No. 4)& (No. 5)to the panels using 4x50mm screws per top as shown in the diagram.

8x50mm Screws.
5

The building can now be attached to the

4

floor framing with 6x50mm screws per

side.

24x50mm Screws.

Pre drill hole

50mm screw

Step 9
Fix the two Door strips (No. 15)to either side of the door panels with 3x30mm screws per strip.
6x30mm Screws.

Pre drill hole

30mm screw

15 15

Please retain product label and instructions for future reference
Step 10 Fix the Door strip (No. 17)to the top of the door opening with 3x30mm screws. 3x30mm Screws.

Pre drill hole

30mm screw

Step 11

Lay the roof panel down (No. 6) and place the styrene sheets (No. 30, 32) in position using the beads (No. 20) which will be screwed down with 2x16mm screws. Ensure the thinner edge of the frame is facing the bottom.

8x16mm Screws.

6

Pre drill hole

16mm screw

31

32 20

P 6

Step 12
Fix the strips (No 28, 29, 33) onto the window frame using 3x30mm screws per strip. Ensure you screw to the side of the styrene not through it.

15x30mm Screws.
33

30mm

Pre drill hole

screw

29

29

29

28

Please retain product label and instructions for future reference

Step 13
Attach the strip (No.37) onto the window panel with 4x30mm screws. Drop the window (No.9) into the aperture and attach the window on the roof panel (No.6) using 4x16 screws and 4x30mm screws per hinge.

20

30mm

16mm

8x30mm Screws. 4x16mm Screws.
37

30mm screw

16mm screw

9

P 7

Step 14 Repeat step 12 for part 7.
12x30mm Screws.

Please retain product label and instructions for future reference

Step 15

Place the Roof panels (No. 6)& (No. 7)on

7

6

top of each gable, making sure the roofs

are flush to each gable and meet at the

top of the apex.

Secure each roof panel to the building using 16x50mm screws.

16x50mm Screws.

*IMPORTANTE: nsure both roof sections meet at the top of the apex as shown in the illustration.

Pre drill hole

50mm screw

*

Step 16
Fix the Casement stay (No. 19)to the opening window then align the fixings onto the window panel frame. Ensure the casement stay fits onto fixings when closed before screwing them down using 6x20mm screws.
6x20mm Screws.

Pre drill hole

20mm screw

19
6x20mm screws per casement stay P 8

Step 17

13

Attach the Roof Support bar (No. 13) to the roof panels using 5x40mm screws.

Screw diagonally through the support into the roof panel as shown in the diagram.

5x40mm Screws.

Pre drill hole

40mm screw

Step 18

Fix the door (No. 8)to the building using 16x30mm black screws per hinge (No. 18)as shown in the diagram.

16x30mm Black Screws.

18

Fit the turn buttons (No. 23)to the building using 2x30mm black screws.

2x30mm Black Screws.

Pre drill hole

30mm screw

23

8

Please retain product label and instructions for future reference
Step 19 Fix the building to the base with 50mm screws evenly spaced as shown. 10x50mm Screws.

Pre drill hole

50mm screw

Step 20
Fix the corner trims (No.38) in position using 4x30mm screws
16x30mm Screws

38

Pre drill hole

30mm screw

P 9

Step 21
10

Fit the fascias (No. 10) and the finials

10

(No. 21)to the building using 14x30mm

screws as shown in the diagram.

21

14x30mm Screws

10 10

Pre drill hole

30mm screw

Step 22

Fix the Roof trim (No. 16) to the top of

the building and secure with 4x30mm

16

screws as shown.

4x30mm Screws

Pre drill hole

30mm screw

Step 23

Please retain product label and instructions for future referenc
It is ESSENTIAL that you apply wood tre-at ment immediately after the building has
been assembled.

Step 23
It is ESSENTIAL to seal around all window framing with silicone sealant (not included) to minimise water ingress.
*Please note: This image is for illustrative purposes and may differ from your product (in regards to the number of windows) however the principle is the same.

AFTER TREATMENT: score around protective
cover on glazing and carefully peel covering back
SISLEICAOLANNET

P 10

4 1 2
3

1

2

REGISTER FOR YOUR
ANTI-ROT
GUARANTEE TODAY

PLEASE SCAN HERE:



References

Adobe PDF library 16.04 Adobe Illustrator 26.1 (Windows)