Installation Guide for ASPEN models including: AEW Series, AEW Series Vertical Wall Mount Air Handler, Vertical Wall Mount Air Handler, Wall Mount Air Handler, Air Handler

INSTALLATION GUIDE

Installation Instructions

AEW Series High Efficiency Wall Mount Electric Air Handlers - Aspen Manufacturing


File Info : application/pdf, 14 Pages, 1.79MB

PDF preview unavailable. Download the PDF instead.

AEW-AAW-IO 123106
INSTALLATION GUIDE
AEW & AAW Series - Vertical Wall Mount Air Handler (Electric Heat)

1. Safety Instruction
Potential safety hazards are alerted using the following symbols. The symbol is used in conjunction with terms that indicate the intensity of the hazard.
`
! WARNING This symbol indicates a potentially hazardous situation, which if not avoided, could result in serious injury, property damage, product damage or death.

! CAUTION

This symbol indicates a potentially hazardous situation, which if not avoided, may result in moderate injury or property damage.

Certified technicians or those individuals
! WARNING meeting the requirements specified by NATE may use this information. Property and product damage or personal injury hazard may occur without such background.
All power sources should be disconnect-
! WARNING ed prior to servicing. Failure to do so may cause personal injury or property damage.
Product designed and manufactured to
! WARNING permit installation in accordance with local and national building codes. It is the installer's responsibility to ensure that product is installed in strict compliance with national and local codes. Manufacturer takes no responsibility for damage (personal, product or property) caused due to installations violating regulations. In absence of local/state codes, refer to National Electric Code: NFPA 90A & 90B Uniform Mechanical Code.
When this unit is installed in an enclosed
! WARNING area, such as a garage or utility room with any Carbon Monoxide producing devices (i.e. automobile, space heater, water heater etc.) ensure that the enclosed area is properly ventilated.
Only factory authorized kits and acces-
! CAUTION sories should be used when installing or modifying this unit unless it is so noted in these instructions. Some localities may require a licensed installer/service personnel.
Unit is not approved for outdoor installa-
! WARNING tions.
The unit is designed for operation with
! WARNING 208/240 V, single phase, 60 Hz power supply. Aspen will not be responsible for damages caused due to modification of the unit to operate with alternative power sources.
# 123106

2. Introduction
The AEW/AAW Series air handlers are versatile upflow only models that can be recess mounted or flush mounted onto walls. These air handlers have the following standard features:
I. Application Versatility
Front or bottom return air position. Offset hanging brackets attach to unit and wall to allow hanging inside closet.
Can be ARI matched with most brands of air conditioners or heat pumps for use with either R22 or R410a when proper metering device is used.
II. Motor
AEW models: Constant torque ECM speeds and torques are controlled by software embedded in the motor to maintain constant torque. Motors are pre-programmed at the factory. AAW models: Dual speed PSC motor.
III. Cabinet
Sturdy, short galvanized steel cabinet with painted front panels. Cabinet fully insulated with 1/2" faced insulation to prevent sweating and mold growth, to encapsulate glass fibers, and to provide excellent R-value. Stick pins ensure insulation remains in place. Units ship with disposable filter in filter rack.
IV. Modular Electric Heat Kits
Heat kits available with either circuit breakers or terminal blocks. Available in 3, 5, 8, & 10 KW. Models with electric heat include sequencers and temperature limit switches for safe, efficient operation. Modules are easily installed in the field using molex plugs or can be ordered factory-installed. Controls are accessible from the front for easy service.
Electrical connections can be made from the top or left. Disconnect does not protrude through the wall panel.
Fan time delay relay standard for increased efficiency.
V. Blower
Direct drive multi-speed blowers circulate air quietly and efficiently. Motor speeds can be easily selected via motor terminals. Swing mounted blowers can be easily removed for service.
VI. Electronic Circuit Board
Electronic circuit board provides 30 sec. ON/OFF blower time delay
1 extracting more heat/cool from the coil

VII. DX Coil
High efficiency rifled copper tubes/enhanced aluminum fins provide maximum heat transfer. All coils immersion tested at 500 psi then nitrogen pressurized and factory sealed for maximum reliability. Coil mounted Schrader allows pre-installation pressure testing.
Available with either check style flowrater or TXV metering device. Field-installable TXVs are also available.
Galvanized metal drain pan with bottom primary and secondary drain connections or alternate right side primary. All connections 3/4" FPT. Access door allows for coil cleaning.
VIII. Warranty
Five year limited parts warranty.
3. Inspection
ü On receiving the product, visually inspect it for any major shipping related damages. Shipping damages are the carrier's responsibility. Inspect the product labels to verify the model number and options are in accordance with your order. Manufacturer will not accept damage claims for incorrectly shipped product.
4. Installation Preparation
Read all the instructions in this guideline carefully while paying special attention to the WARNING and CAUTION alerts. If any of the instructions are unclear; clarify with certified technicians. Gather all the tools needed for successful installation of the unit prior to beginning the installation.
4A. Clearances
This unit is designed for zero clearance installation on three sides and adequate clearance to provide access for service in the front. A minimum of 2.5 ­ 3.5 feet clearance is recommended on the front end (Fig 4A-1).

4C. Condensate Drain Preparation
ü An auxiliary drain pan must be provided by the installer and placed under the entire unit with a separate drain line that is properly sloped and terminated in an area visible to the home owner. The auxiliary pans provide extra protection to the area under the unit should the primary and secondary drain plug up and overflow. As expressed in our product warranty; ASPEN WILL NOT BE BILLED FOR ANY STRUCTURAL DAMAGES CAUSE BY FAILURE TO FOLLOW THIS INSTALLATION REQUIREMENT. The drains from the auxiliary drain pan must be installed according to the local building codes.
4D. Condensate Drain
Drain lines from the auxiliary drain pan
! CAUTION should NOT be connected to the primary
drain line of the coil.
The drain lines must be installed with ¼" per foot pitch to provide free drainage. A condensate trap MUST be installed on the primary drain line to ensure proper drainage of the condensate. The trap must be installed in the drain line below the bottom of the drain pan (Fig. 4C-1)

Fig 4C-1. Condensate Drain Trap

Fig 4A-1. Minimum Clearance for Air Handler
4B. Recess Mounting or Wall Mounting Option

Since coil is upstream of the blower, all
! CAUTION drains MUST be trapped or sealed. Failure to do so will result in condensate overflow from the drain pan. Aspen will NOT be responsible for any
damages resulting from failure to follow these instructions.

These units are designed to be installed in a small room where they

can be mounted above a water heater or recessed into a wall. The unit should be installed in Vertical Upflow position ONLY.

If the drain pan is constructed of nylon
! CAUTION or plastic; use Teflon tape to connect the

drain lines to the threads in the drain pan.

If installing the air handler into a recessed wall, the unit must leave

DO NOT USE SOLVENT BASED PIPE DOPE. THIS WILL RE-

clearance to allow the removal of the front panels. The bottom of the

DUCE THE LIFE OF THE PAN.

unit should also rest on a sturdy platform or floor. The unit must be

level to allow condensate drainage.

The drain pan has primary (white) and secondary (red) drain connec-

tions. If a secondary drain line is required, it should be run separately

These air handlers come with an offset mounting bracket that at- from the primary and should terminate in a highly visible location.

taches the air handler to the wall when the unit is flush mounted to Condensate disposal through the secondary drain line indicates that

the wall.

2

# 123106

the primary drain line is plugged and needs cleaning. If a secondary drain line will not be provided, plug the secondary drain. Drain plugs are NOT to be reused without plumbers tape or putty. Drain line connection should be finger tightened, then turned no more than one complete turn as needed to ensure a firm connection. DO NOT overtighten connection or damage may occur.
4E. Ductwork
Duct systems should be installed in accordance with standards for air-conditioning systems, National Fire Protection Association Pamphlet No. 90A or 90B. They should be sized in accordance with National Environmental System Contractors Association Manual K, or whichever is applicable.

Afilter rack is provided for a 1"X20"X20" (AAW/AEW18/24/30/36/31/37) or 1"X14"X18" (AAW/AEW19/20/25/26) nominal size filter (Fig 4E-4). Inspect and clean or replace fliter every month. A blocked filter can reduce air flow to the coil and hinder the performance of the system.

On any job, non-flammable flexible collars should be used for the return air and discharge connections to prevent transmission of vibration (Fig 4E-1). Although these units have been specially designed for quiet vibration-free operation, air ducts can act as soundboards, can, if poorly installed, amplify the slightest vibration to the annoyance level.

Fig 4E-1.

All main supply and return air drops should be properly sized as determined by the designer of the duct system and should not necessarily be the size of the duct flange openings of the unit. (The duct size should never be smaller than the flange openings of the air handler supply and return air openings.)
These models have a bottom or front return. Discard the drain access panel in the bottom of the unit if this is a bottom return application (Fig 4E-2). In case of a front return application, the front access panel should be removed and discarded.

Fig 4E-4.
It is recommended that wherever supply and return air sheet metal ducts pass through unconditioned areas, they be insulated to prevent excessive heat loss during heating operation. When applied in conjunction with summer air conditioning, sheet metal duct routed through unconditioned areas should be insulated and have an outside vapor barrier to prevent formation of condensation.
5. Installation
Ensure that the unit is adequately sized.
! CAUTION The tonnage of the outdoor unit should never exceed the tonnage of this unit.
The coil was manufactured with a dry ni-
! WARNING trogen pre-charge. Release the pressure through the Schrader valve test port prior to installation. If holding pressure is not present, return coil to distributor for exchange.
Some Aspen coils may include a Schrader
! CAUTION valve on the suction manifold. Ensure that the Schrader valve and valve core (where present) are protected from heat during brazing and installation to prevent leakage. Use a core removal tool to temporarily remove the core when brazing. Replace the core once brazing is completed.

Fig 4E-2.
If an accessory grill is being used, the front access panel should be removed and discarded (Fig 4E-3).

Insulation on the suction line MUST extend

! CAUTION

into the possible

cabinet and continue as far as to eliminate condensate dripping

onto the access door.

ü Clean coil fins with degreasing agent or mild detergent and rinse fins clean prior to installation.

ü The refrigerant line sizes should be selected according to the recommendations of the outdoor unit manufacturer.

ü Care must be taken to ensure all connection joints are burr-free and clean. Failure to do so may increase chances of a leak. It is recommended to use a pipe cutter to remove the spun closed end of the suction line.

ü To reduce air leakage, rubber gommets may be present where the lines pass through the coil case. To avoid damage, remove grommets prior to brazing by sliding over the lines. Use a quenching cloth or allow the lines to cool before reinstalling the grommets.

# 123106

Fig 4E-3.

ü Use of wet rags/quenching cloth is highly recommended to prevent
3 weld-related damages to the casing and Schrader valve (if present).

6. Mounting Air Handler To Wall
1. Install the air handler in a level position side to side and front to back. If this step is not followed, condensate water damage may occur. (Both flush mount and recess mount configurations.)
2. Determine where the air handler is to be placed on the wall. Place the hanging bracket on the wall and align the holes of the bracket with the wall studs. Level the hanging bracket and mark the holes to drill pilot holes for the screws.

! CAUTION

Use Piston sizes recommended by the outdoor unit manufacturer whenever pos-

sible. The piston should be sized accord-

ing to the capacity of the outdoor unit.

! WARNING

Failure to install the proper piston lead to poor system performance

can and

possible compressor damage.

I. Installation
Note: Photos are for basic illustration purposes only. Actual equipment configuration may differ from that shown.

3. Drill the pilot holes.

4. Secure the bracket with screws sufficient to hold 4X the weight of the air handler.

I-1. Disassemble flowrator body using two wrenches and unscrewing with a counterclockwise motion.

5. Position the air handler on the wall with the bracket on the air handler slightly higher than the bracket secured on the wall. Lower the air handler so that the brackets engage. Check the unit for level, both side to side and front to back.
7. Connecting Ducting
1. Secure supply air ducting to the top of the air handler. Canvas connectors are recommended for reducing potential noise transmission.
2. If the bottom return air opening is being used, remove the bottom panel. If a front return is being used, this panel will remain in place.

O-ring
I-2. Replace the Teflon O-ring (located between the halves). Discard Schrader if present.

! CAUTION

Be aware of the Teflon O-ring. Be sure replace the O-ring to attain a proper

to

seal. (The Teflon O-ring is located between

the two halves of the flowrator)

3. Secure the return air ducting to the air handler cabinet.
8. Metering Devices/Liquid Line Connection
Aspen coils are available with two kinds of metering devices a) flowrator or b) TXV. The following instructions are separated into sections by metering device.
8A. Flowrator Coils

I-3. Slide the attachment nut onto the liquid line stub out.
I-4. Braze the stub-out portion to the liquid line and let cool.

O-ring

I-5. Taking care that the white
Teflon seal is still in place inside the flowrater body, firmly seat the stub and screw the attachment
nut to flowrater body.

Fig 7A-1. Flowrator assembly components
4

# 123106

I-6. Tighten the nut to a torque of approximately 10-30 ft-lbs. Do NOT overtighten the nut. Overtightening will impede the piston movement during operation.
II. Piston Replacement
Note: Photos are for basic illustration purposes only. Actual equipment configuration may differ from that shown.

Fig 8A-2

During some installations, a piston change may be required. If so, the installer MUST change the piston. Use piston sizes recommended by the outdoor unit manufacturer. If a sizing chart is not available, use the piston size chart provided below to size the required piston. The size of the piston is stamped on the piston body (Fig 8A-2).

Use the chart below when matching coil with an outdoor unit with a different nominal capacity than the coil.

II-6. Replace the piston with one of the correct size. Do not force the new piston into the body. Make sure the piston moves freely in body.

! CAUTION

Pay close attention to the piston orientation. The pointed end of the piston MUST

go into the distributor body, towards the

coil. Failure to ensure this orientation will cause the piston

to be bypassed during operation which might damage the

outdoor unit.

II-7. Assemble the two halves correctly and ensure that the white
Teflon O-ring is present between the two halves (See I-5). Slide the 13/16" nut onto the distributor body.

II-1. Evacuate the system as per manufacturer guidelines and recommendations
II-2. Turn the 13/16" nut once to release any residual pressure in the coil.
II-3. After ensuring that the coil is free of any residual pressure, disassemble the flowrator body completely using two wrenches. Take great care not to distort the feeder tubes. The wrench used to clasp the nut should be turned in counter-clockwise direction to unscrew the nut.

! CAUTION

Be aware of the Teflon O-ring. Be sure replace the O-ring to attain a proper

to

seal. (The Teflon O-ring is located between

the two halves of the flowrator)

II-8. Tighten the nut to a torque of approximately 10-30 ft-lbs. Do NOT overtighten the nut. Overtightening will impede the piston movement
during operation.

II-9. If present, slide the rubber grommet back to position to prevent air leakage.
7B. TXV Coils

# 123106

II-4. Slide the 13/16" nut over the lineset and separate the two halves of the flowrator.

Fig 8B-1. Components of a typical TXV assembly

II-5. Pull the piston out using a small wire or pick. Verify the piston size (size is typically stamped on the body of the piston - Fig 8A-2). If a different piston size is required by the outdoor unit manufacturer, replace the piston using the small wire provided with the piston kit.

The sensing bulb and TXV body MUST be
! WARNING protected from overheating during brazing. The sensing bulb and TXV body must be covered using a quench cloth or wet cloth when brazing. Pointing the brazing flame away from the valve and sensing bulb provide partial protection only.
Ensure that the TXV selected is compat-
! CAUTION ible with the refrigerant used in the out-
door system (R22 or R410A). TXV caps are painted green for R22 or pink for R410A. In absence of color, the caps will be marked with the compatible refrigerant.

5

! The valves should be sized according to
CAUTION the capacity of the outdoor unit. Failure to
install the right valve can lead to poor performance and possible compressor damage.
I. TXV Bulb Horizontal Mounting
The orientation and location of the TXV bulb has a major influence on the system performance.
! Ensure that the TXV bulb is in direct con-
CAUTION tact with the suction/vapor line. Gap be-
tween the bulb and tube should be avoided. Failure to do so will impair the proper functioning of the TXV valve. It is recommended that the TXV bulb be installed parallel to the ground (on a horizontal plane). The bulb position should be at 2 o'clock or 10 o'clock. Fig. 7B-2 shows the recommended position for the TXV bulb installation in the horizontal plane.
Bulb position at 2 o'clock or 10 o'clock
Fig 7B-2. Recommended location for horizontal TXV bulb mount

II. TXV Bulb Vertical Mounting
As recommended in Section 8B-I, the TXV sensing bulb should be mounted in a horizontal plane in relation to the suction/vapor line. However, some installation configurations may require that the sensing bulb be mounted vertically. In this instance, place the bulb opposite the piping wall being hit by refrigerant and oil leaving the distributor tubes, and with capillary tubes directed upwards as shown in Fig. 8B-3.
Fig 8B-3. Recommended location for vertical TXV bulb mount
! If the TXV sensing bulb is mounted verti-
CAUTION cally; the capillary MUST be directed up-
wards. The bulb must be mounted on the wall opposite to that being directly hit by the refrigerant and oil leaving the distributor tubes.
III. Field-Installed TXV Retrofit
Note: Photos are for basic illustration purposes only. Actual equipment configuration may differ from that shown. When installing an expansion valve, it is not necessary to slide the coil out of the housing.

The TXV sensing bulb SHOULD be mounted on the suction line approximately 6" from the TXV or coil housing using the metal clamp provided. In order to obtain a good temperature reading and correct superheat control, the TXV sensing bulb must conform to ALL of the following criteria:
1. The sensing bulb MUST be in direct and continuous contact with the suction line. 2. The sensing bulb should be mounted horizontally on the suction line. 3. The sensing bulb MUST be mounted at the 2 o'clock or 10 o'clock position on the circumference of the suction line. 4. The sensing bulb MUST be insulated from outside air.
A properly mounted sensing bulb will prevent false readings caused by liquid refrigerant that may have formed inside the suction/vapor line. Insulation will protect the sensing bulb from false readings due to contact with warm air.

III-1. Disassemble the flowrator body using two wrenches. Unscrew the body with a counterclockwise motion.
III-2. Remove the existing flowrator piston using a small wire or pick.

O-ring

III-3. Replace the Teflon O-ring seal in place (located between
the halves).

6

# 123106

III-4. Inspect the TXV box to confirm that the valve is compatible with the refrigerant in the system.

Male (Inlet)

Female (Outlet) III-5. Remove the valve from
the box and note the location of the inlet side (threaded
male port) and the outlet side
(female swivel nut port).

B. Screw flare nut on TXV equalization tube on to the Schrader valve stem.
III-12b. In some cases, a suction line schrader port may not be present. If a Schrader port is NOT present:

O-ring

III-6. After ensuring that the
Teflon O-ring seal is still in place inside the flowrator body, screw the female swivel nut onto the
flowrator body.

III-7. Slide attachment the nut onto the liquid line stub out (See 8A, I-3)

III-8. Braze the stub-out portion to the liquid line and let cool.

! WARNING

Do not attempt to touch brazed joints while hot. Severe burns may result.

A. Install a field-supplied braze-on schrader valve like that shown on the suction line near the intended sensing bulb mounting location. Follow valve manufacturer instructions and recommendations for installation.
B. Attach equalizer tube to valve as described in section III-12a above. III-13. Mount the sensing bulb as described in section 8B-I or 8B-II.
! When handling or manipulating the equal-
CAUTION izer tube, take great care not to kink or
make extreme bends in the tubing.

O-ring

III-9. Remove the additional Tef-
lon O-ring seal from the box and place on the shoulder just inside
the TXV inlet port. Screw the nut attached to the stub-out portion of
the flowrator body onto the inlet port of the TXV.

III-10. Tighten all connections taking care to use proper back up.
III-11. Remove the valve identification sticker from the valve and place it adjacent to the Aspen model number on unit name plate.
III-12a. Some Aspen coils come with a Schrader valve on the suction line. If a Schrader port is present:

A. Remove the valve stem from the Schrader port mounted on the suction line.

# 123106

7

9. Connecting Refrigerant Lines
1. Release nitrogen holding charge by depressing the Shrader Valve at the liquid line connection on the air handler. If no gas releases from the air handler, contact distributor regarding potential leak.

7. Flow nitrogen through the piping when brazing. 8. Braze both refrigerant line connections using proper brazing procedures. 9. When all line connections are brazed, perform a proper system evacuation procedure per the outdoor unit manufacturer instructions.
10. Seal the penetration openings where the lineset piping enters the air handler cabinet.

2. Cut off Shrader Valve fitting at the liquid line connection. Use a tubing cutter for this step. Clean the burr from the cut tubing to reduce the chance of future leaks. Connect the liquid line to the tubing at the indoor unit.

10. Leak Check
1. Following outdoor unit manufacturer instructions and recommendations, charge the system with dry nitrogen to a maximum pressure of 150 PSIG.

3. Use a tubing cutter to remove the spun end from the suction line connection at the air handler. Clean the burr from the cut tubing to reduce the chance of future leaks.
4. To avoid heat damage to grommets where present, remove these prior to brazing by sliding them over the refrigerant lines and out of the way.
5. Check to determine if the evaporator coil has a Shrader fitting on the suction manifold. If yes, remove the valve core to prevent heat damage during brazing. Replace the valve core once the piping has cooled.
6. If the air handler has a TXV metering device, remove the sensing bulb from the suction line prior to brazing to prevent heat damage from occurring. Replace the sensing bulb once the piping has cooled.

2. Check all brazed and screwon line connections by applying a soap solution to the joint. A leak will produce bubbles in the soap solution.
3. If any leaks or are discovered, relieve system pressure and repair leaks. Repeat steps 1-3.
4. With no leaks or weak connections present, evacuate the system and charge as per the outdoor unit manufacturer instructions and specifications.
11. Electrical Line Voltage Wiring
These units are designed for single or three phase 208/240 volts, 60 HZ power supply. Wire selection and wiring must be in accordance with the National Electric Code and/or local codes. Unit terminals are designed to accommodate copper and aluminum wiring. If aluminum wiring is used: please observe special precautions relative to sizing, wire connections and corrosion protection.
All models with 5,8 or 10 kW electric heat are arranged for single circuit connections. Models larger than 10 kW are arranged for multicircuit protection. Refer to top part of wiring diagram at the end of this guide for detailed information.

8

# 123106

Line voltage wiring should be routed through the access holes at the top of the air handler. Proper electrical conduit connection fittings should be used. Connect the power wiring to the line side connections on the air handler. The electrical ground wire should be connected to the grounding lug. Ensure both the field supplied ground wire and air handler GREEN ground wire are both secured to the grounding lug of the air handler.

240VAC Tap
208VAC Tap

If the line voltage being supplied to the air handler is 208 volt single phase, the line voltage tap on the low voltage transformer needs to be moved from the 240 volt tap to the 208 volt tap. If this is not done, the secondary output voltage of the transformer will be too low.

12. Low Voltage Connections 12A. Single Stage Cooling with Electric Heat
The air handler comes factory setup for a single stage cooling system. If factory installed accessory electric heaters are preinstalled, the unit will also have a low voltage wire for the electric heat (Fig 12A-1).

Fig 12A-2.
12B. Two Stage Condensing Units
If the outdoor condensing unit is a two stage model, a field provided Y2 wire can be connected to the motor using an electrical spade connector. The number 4 and 5 terminal on the motor are speed taps that will increase the blower speed for second stage cooling operation. Both the G and Y2 terminals will be energized at the same time during a call for second stage blower speed operation. The motor will run at the speed where the Y2 wire is connected (Fig 12B-1).

Fig 12A-1.
During cooling mode operation, the indoor blower G wire will energize a time delay relay inside the air handler. After a short time delay period, the time delay relay will send out a 24 volt signal to the low voltage terminal on the motor. Fan delay periods are 7 seconds ON delay and 65 seconds OFF delay. (See Schematic) The Y wire from the thermostat is not connected at the air handler. This wire goes directly to the outdoor unit 24 volt wiring to turn on the outdoor condensing unit when a call for cooling takes place. The 24 volt common for the outdoor unit circuits is connected at the air handler Brown wire. The electric heater low voltage wiring W terminal is wired directly from the thermostat to the air handler. The blower will delay on a heat call ON for a period of 5 seconds. The OFF delay period is 60 seconds.

Fig 12B-1.
Operating CFM based upon each speed tap number is shown on the electrical wiring diagram of the unit. Final air volume adjustments should be made by referencing total external static pressure (Table 12B-1, following page).

# 123106

9

MODEL

SPEED TAP

T1 T2 AEW 18/24 T3 T4 T5 T1 T2 AEW 19/25 T3 T4 T5 T1 T2 AEW 20/26 T3 T4 T5 T1 T2 AEW 30/36 T3 T4 T5 T1 T2 AEW 31/37 T3 T4 T5

Table 12B-1.

0.10 909 723 600 723 909 670 800 875 980 1065 655 785 860 960 1045 1365 745 898 1174 1365 745 940 1100 1220 1385

CFM V. EXTERNAL STATIC*

0.20 0.30 0.40

864

840

800

690

652

631

565

539

502

690

652

631

864

840

800

645

615

590

780

750

730

850

820

790

955

930

900

1035 1015

995

630

605

580

765

735

715

835

805

775

935

910

885

1015 995

975

1332 1303 1271

698

668

630

873

853

827

1132 1106 1078

1332 1303 1271

715

675

640

910

875

840

1070 1025

995

1180 1155 1115

1350 1330 1290

0.50 782 600 480 600 782 570 695 760 875 970 560 685 745 860 950 1240 600 800 1047 1240 615 805 965 1085 1270

13. Condensate Drain

1. Condensate drain is located at front as shown in picture with pri-

mary and secondary drain port.

4

3

2

1

2. Pipe condensate system using proper PVC fittings. ERN

ZONE REV.

REVISIONS DESCRIPTION

DATE CHECKED BY

TBD

0

INITIAL RELEASE

10/23/2017

3. Ensure a minimum 2" trap
is installed in theB condensate drain. Locate the trap near to the connection opening on
the air handler. See illustra-
tion.

SECONDARY DRAINPORT
PRIMARY DRAINPORT

14. Air Volume Adjustment
Air volume needs to be set to the level recommended by the outdoor unit equipment manufacturer. Most systems will require around 400 CFM of indoor air for every 1 ton of system cooling capacity. The air volume must be set prior to attempting system charge. This air handler uses a constant torque ECM Motor. This motor will try to maintain proper motor torque to achieve programmed air volume levels at varying levels of external static pressure. The air volume level produced by the air handlers at varying external static pressure levels is shown in Table 12B-1. Use a Magnehelic Gauge with a 1" scale and two static pressure tips to measure the static pressure during the air volume adjustment procedure (Fig. 14-1). The high port static pressure tip should be placed in the supply duct near the outlet of the air handler. The low port static pressure tip should be placed in the return air duct near the entrance to the air handler. The factory provided air filter should be in place inside of the air handler.
Fig. 14-1 1. Select a starting speed tap from the CFM table. The blower motor has selectable speed taps labeled 1 thru 5 (Fig. 14-2). The speed taps are energized by 24 volts received from the time delay relay. When two stage cooling units are used, both the first and second stage fan speed taps will be energized at the same time. The motor will run at the speed generated at the highest motor speed tap.

A

MATERIAL
WEIGHT: LBS PROPRIETARY AND CONFIDENTIAL THE INFORMATION CONTAINED IN THIS DRAWING IS THE SOLE PROPERTY OF ASPEN MANUFACTURING CO. ANY REPRODUCTION IN PART OR AS A WHOLE WITHOUT THE WRITTEN PERMISSION OF ASPEN MANUFACTURING CO. IS PROHIBITED.

UNLESS OTHERWISE SPECIFIED DIMENSIONS ARE IN INCHES

TOLERANCES:

DECIMAL:

ANGULAR:

XXX .015

2°

XX .03

THIRD ANGLE PROJECTION

Everything's Right Here

NAME

DATE

DRAWN BY

DO NOT SCALE DRAWING

ENG APPR.

TITLE:

SIZE PART. NUMBER

REV

B Stack up Analysis

SCALE:

SHEET 1 OF 1

4

3

2

1

Fig. 14-2
2. Call for fan only operation at the thermostat.
3. Read the external static pressure level on the Magnehelic gauge. 4. Make speed tap selection changes to get the air volume as close as possible to the required level. (Table 14-1)
5. If the static pressure is above .5" wc , excessive turbulence or duct friction needs to be reduced. (Obstructions in the duct system can also cause excessive static pressure.) 6. When proper air volume is established, move on to the charging procedure.

10

# 123106

MODEL

MOTOR SPEED

AAW 18/24 AAW 19/25 AAW 20/26 AAW 30/36 AAW 31/37

LOW HIGH LOW HIGH LOW HIGH LOW HIGH LOW HIGH

Table 14-1.

0.10 834 930 740 930 727 909 1123 1396 1154 1256

CFM V. EXTERNAL STATIC*

0.20 0.30 0.40

795

746

687

888

823

749

710

685

650

880

830

770

696

674

640

866

814

757

1094 1062 1034

1358 1313 1261

1100 1042 982

1193 1113 1057

0.50 620 680 615 710 604 696 1000 1200 901 982

15. System Charging
An improperly charged system may cause
! CAUTION degradation in system performance and damage the compressor. After installation of the coil, refer to the outdoor unit manufacturer for charging techniques and amount of charge. If outdoor unit manufacturers charging instructions are unavailable; then refer to instructions below to charge the system.

1. Bring airflow up to the maximum CFM possible according to Table 14-1.
2. Evacuate refrigeration system to micron level required by outdoor unit manufacturer.
3. Release system charge from outdoor unit and call for cooling.
4. Use outdoor unit equipment manufacturer specific charging charts if available and make proper charge adjustment based upon outdoor unit instructions.
5. If outdoor unit instructions and charts are not available, use Aspen provided charts. Make certain indoor air temperature is near comfort level setpoint 75F, prior to establishing superheat and subcooling levels.

15B . Expansion Valve Coils
Add refrigerant until the subcooling measured at the outdoor unit liquid line matches the subcooling recommendation of the outdoor manufacturer. If chart is unavailable charge the unit to a subcooling value of 8ºF +/- 1ºF.
16. Adjustment Of Heat Anticipator
After all connections are made, start-up and checkout must be performed before proper evaluation of the entire system can be made. Make sure that heat anticipator is properly set as noted on thermostat instructions. Load requirements can vary in each residence and it may be necessary for the installer or homeowner to make slight adjustments to the heat anticipator setting for longer or shorter cycles. It is recommended to change the setting no more than plus or minus 0.05 amps at a time. Greater changes can cause the unit to rapid cycle or remain on excessively. Measure anticipator circuit current with electric heaters energized and set anticipator to proper level.
17. Final System Checkout
1. Make certain all cabinet openings are properly sealed and any grommets moved during installation are moved into proper place.
2. With cooling system operating, check for condensate leakage.
3. Perform leak detection inspection of refrigerant circuit and connecting piping.
4. Secure all cabinet doors

DRAIN PAN TEMPERATURE TABLE

DRAIN PAN TYPE

TEMP LIMITS

Plastic - Standard Plastic - High Temp

290° 425°

Metal - High Temp

600°

15A . Flowrator Coils
Add refrigerant until the superheat measured at the outdoor unit suction/vapor line matches the superheat from the chart below.

Outdoor Temp °F D.B. 65 70 75 80 85 90 95 100

Superheat

Min

Nom

Max

30

35

40

26

30

34

21

25

29

17

20

23

12

15

18

8

10

12

4

5

7

Table 15A-1.

# 123106

11

18. Wiring diagram for AEW models

Fig 18-1.
12

HIGH VOLTAGE disconnect all power sources prior to servicing. Failure might lead to safety hazard

# 123106

19. Wiring diagram for AAW models

# 123106

Fig 19-1.
13

CB HS
HS
HS

HTR 6 LC HTR 5 LC HTR 4 LC

CB HS
HS
HS

HS

HTR 3 LC

HS

HS

HTR 2 LC

HS

HS

HTR 1 LC

HS

FC EM SEE NOTE 3

LO SPEED (CAPPED) MED SPEED (CAPPED)

3

2

BTD

NC

NO

COM

1 TRANSFORMER

BTD HS HS HS

5 24 VOLTS 4

NOTES :
1. LINE SPLICE TO BE ATTACHED TO UN USED MOTOR LEAD. RD - LOW , BL - MED, BK - HI
2. RED WIRE TO BE ON TERMINAL 1 FOR 230 VOLT OR TERMINAL 2 FOR 208 VOLT OPERATION.
3. TWO SPEED CONNECTION OPTIONAL. [KIT REQUIRED]

LEGEND
BTD - BLOWER TIME DELAY CB - CIRQUIT BREAKER BM - BLOWER MOTOR FC - FAN CAPACITOR FS - FEMALE SOCKET

LC - LIMIT CONTROL HS - HEAT SEQUENCER HTR - HEATER MP - MALE PLUG

COLOR CODE

W

- WHITE

BK - BLACK

BL - BLUE

R

- RED

BK/W - BLACK/WHITE STRIPE

GN - GREEN

GR - GRAY

BR - BROWN

GN/BK - GREEN/BLACK STRIPE

GN/RD - GREEN/RED STRIPE

WIRING CODE
FACTORY HIGH VOLT FACTORY LOW VOLT FIELD HIGH VOLT FIELD LOW VOLT

BR GN W

BK/W

R

DIAGRAM # 101126 CURRENT 08/17/18

HIGH VOLTAGE disconnect all power sources prior to servicing. Failure might lead to safety hazard

373 Atascocita Rd. Humble, TX 77396 Phone: 281.441.6500 Toll Free: 800.423.9007 Fax: 281.441.6510 www.aspenmfg.com
ReviRseedv1is0e/1d7/0168-.2S0u2b4je.cSt utobcjheacntgteowcihthaonugt enowticiethaonudtwnitohotiucteinacnurdrinwgiothbloiguattioinnc. urring obligation.
© Co©pyCrigohpty2ri0g1h8t A20s2p4enAMspaennuMfacatnuurifnagc.tuArlilnRgi.gAhltlsRRiegshetsrvReedserved
14

# 123106



References

Adobe PDF Library 17.0 Adobe InDesign 19.4 (Macintosh)