ARD-1-100-TP: Three-Phase EV Connection Unit
A three-phase connection unit suitable for 1 x 100A TPN load.
Product Overview
The matt:e ARD connection centres provide a simple to install dedicated EV connection centre. It features built-in O-PEN® technology, allowing for the connection of EV charge points to the PME earthing facility without the need for separate earth electrodes. This design helps facilitate compliance with BS:7671. 2018 Amendment 1, 2020 Regulation 722.411.4.1.(iii). The matt:e ARD connection centres incorporate a unique 5-pole auto-reset device that automatically restores power to the load once a fault has been cleared.
Product Features and Benefits
- ✔️ Built-in O-PEN® technology
- ✔️ NO EARTH ELECTRODES REQUIRED
- ✔️ Helps reduce disruptive and costly groundworks
- ✔️ Removes the risk of striking buried services
- ✔️ Simple wire in wire out connection
- ✔️ Phase loss protection
- ✔️ Suitable for 1 x 100A TPN load
- ✔️ Mild steel IP4X enclosure
- ✔️ Standard 1 Year parts warranty
Technical Specifications
Specification | Details |
---|---|
Input Volts | 400V 50Hz |
Max Load | 100amps |
Cable Entry Facility | Top and bottom |
Terminal Capacity | 50mm² |
Dimensions (H x W x D) | 550mm x 360mm x 120mm |
Weight | Approximately 7KG |
Enclosure | Mild Steel Powder Coated |
Ingress Protection | IP4X |
Warranty | 1 Year |