Instruction Manual for HILTI models including: HUS3 6 Concrete Screw Anchor, HUS3, 6 Concrete Screw Anchor, Concrete Screw Anchor, Screw Anchor

HILTI COMPOSITE METAL DECK FLOOR SEISMIC FIXING ...

il y a 2 jours — All data in Table 1 applies to: − Correct installation. See anchor box or Hilti.co.nz for details including hole cleaning and installation torque.


File Info : application/pdf, 5 Pages, 698.16KB

PDF preview unavailable. Download the PDF instead.

ASSET DOC LOC 16294762 APC RAW
HILTI COMPOSITE METAL DECK FLOOR SEISMIC FIXING SOLUTION
Hilti HUS3, HUS4 and HST3 ultimate performance mechanical anchor system

Pg. 1/5

Updated: Feb-24

HUS4 Screw Anchor

Hilti New Zealand Ltd Level 1, Building B, 600 Great South Rd P.O. Box 112-030 | Ellerslie, Auckland 1051 P 0800 444 584 | E ServiceNZ@hilti.com

Ultimate-performance screw anchor for seismic actions into ComFlor® 60, 80 and SR

Setting Information
Nominal bit diameter Effective min. embedment Nominal embedment Min. hole depth Setting tool[1]

Sym.

Units

Nominal anchor diameter (mm)

8

10

do

mm

8

10

hef

mm

hnom

mm

ho

mm

-

-

46.4 60 70

54.9

58.6

70

75

80

85

Hilti SIW T-A

67.1 85 95

Loads according to Figure 1 and 2

Minimum concrete thickness over upper flute

hmin,deck

mm

70

Minimum distance to edge of lower flute cmin,deck

mm

45

45

47

47

Characteristic pullout resistance in noncracked concrete

NRk,p,deck,uncr

kN

15.9

17.5

19.2

19.9

Characteristic pullout resistance in cracked concrete

NRk,p,deck,cr

kN

11.1

12.3

13.5

14.0

Characteristic pullout resistance, seismic C1

NRk,p,deck,C1

kN

11.1

12.3

13.5

14.0

Partial safety factor for pullout resistance

gc

-

1.5

Robustness factor for pullout resistance

ginst

-

1.00

Characteristic steel resistance for shear VRk,s,deck

kN

17.3

17.3

20.6

20.6

Characteristic steel resistance for shear, seismic C1

VRk,s,deck,C1

kN

14.7

14.7

17.2

17.2

Partial safety factor for steel resistance for shear

gMs,V

-

1.5

[1] ­ Installation with other impact screw driver of equivalent power is possible. See ETA-20/0987 for full setting details.
Table 1 - Hilti HUS4-H, -HF, -C, -A, -AF anchors tension and shear design data for installation in the soffit of f'c = 30 MPa, normal weight concrete-filled profile deck assemblies for hammer drilled installations
All data in Table 1 applies to: - Correct installation. See anchor box or Hilti.co.nz for details including hole cleaning and installation torque - No edge distance and spacing influence. Only one anchor can be used in the lower flute at a time with the min. spacing
between anchors along the length of the flute to be at least 3 x hef. This datasheet does not give information for the design of fasteners in a group. - f'c = 30 MPa concrete. For higher compressive strengths, the tension loads may be increased by (f'c /30)0.5 - gap = 1.0 (no hole clearance between anchor and fixture) was used to in the formula VRd,s,deck,C1 = gap x eq x VRk,s,deck,C1 / gMs,V In case of connections with hole clearance according to EN 1992-4 Table 6.1, gap = 0.5 should be used. - Testing in accordance with ACI 355.2 and AC 193. Evaluated in accordance with AC 193 and EAD 330232 and EOTA TR 049
For anchoring into the upper flute, either use Table 1 data below conservatively or refer to ETA-20/0867. Additionally, C2 seismic performance category is not included in ACI 355.2 and AC 193. C2 seismic performance category may be designed in the upper flute using all guidelines and parameters provided in ETA-20/0867. ComFlor® is a registered trademark used in Australia and New Zealand under licence from Tata Steel UK Limited. © Copyright 2017 ComFlor® New Zealand. S&T Stainless Ltd.

Pg. 2/5

Updated: Feb-24

HUS3 Screw Anchor

Hilti New Zealand Ltd Level 1, Building B, 600 Great South Rd P.O. Box 112-030 | Ellerslie, Auckland 1051 P 0800 444 584 | E ServiceNZ@hilti.com

Ultimate-performance screw anchor for seismic actions into ComFlor® 60 and 80

Setting Information

Nominal bit diameter Effective min. embedment Nominal embedment Min. hole depth Setting tool[1]

Loads according to Figure 1

Minimum concrete thickness over upper flute

Minimum distance to edge of lower flute

Characteristic pullout resistance in non-cracked concrete

Sym.
do hef hnom ho -

Nominal anchor Units diameter (mm)

6

mm

6

mm

30

mm

40

mm

43

-

SIW 22A

hmin,deck

mm

70

cmin,deck

mm

45

NRk,p,deck,uncr

kN

7.1

Characteristic pullout resistance in cracked concrete

NRk,p,deck,cr

kN

2.5

Characteristic pullout resistance, seismic C1
Design pullout resistance, seismic C1 Partial safety factor for pullout resistance Robustness factor for pullout resistance Characteristic steel resistance for shear HUS3-H, -P, -PS, -C

NRk,p,deck,C1

kN

NRd,p,deck,C1

kN

gc

-

ginst

-

VRk,s,deck

kN

2.5 1.4 1.5 1.2
10.8

Characteristic steel resistance for shear, seismic C1, HUS3-H, -P, -PS, -C

VRk,s,deck,C1

kN

4.3

Design steel resistance for shear, seismic C1, HUS3-H, -P, -PS, -C

VRd,s,deck,C1

kN

2.9

Partial safety factor for steel resistance for shear

gMs,V

-

1.5

[1] ­ Installation with other impact screw driver of equivalent power is possible. See ETA-13/1038 for full setting details.
Table 2 - Hilti HUS3 anchors tension and shear design data for installation in the soffit of f'c = 30 MPa, normal weight concrete-filled profile deck assemblies for hammer drilled installations
All data in Table 2 applies to: - Correct installation. See anchor box or Hilti.co.nz for details including hole cleaning and installation torque - No edge distance and spacing influence. Only one anchor can be used in the lower flute at a time with the min. spacing
between anchors along the length of the flute to be at least 3 x hef. This datasheet does not give information for the design of fasteners in a group. - f'c = 30 MPa concrete. For higher compressive strengths, the tension loads may be increased by (f'c /30)0.5 - gap = 1.0 (no hole clearance between anchor and fixture) was used to in the formula VRd,s,deck,C1 = gap x eq x VRk,s,deck,C1 / gMs,V In case of connections with hole clearance according to EN 1992-4 Table 6.1, gap = 0.5 should be used. - Testing in accordance with ACI 355.2 and AC 193. Evaluated in accordance with AC 193 and EAD 330232 and EOTA TR 049
For anchoring into the upper flute, either use Table 1 data below conservatively or refer to ETA-13/1038. Additionally, C2 seismic performance category is not included in ACI 355.2 and AC 193. C2 seismic performance category may be designed in the upper flute using all guidelines and parameters provided in ETA-13/1038. ComFlor® is a registered trademark used in Australia and New Zealand under licence from Tata Steel UK Limited. © Copyright 2017 ComFlor® New Zealand. S&T Stainless Ltd.

Pg. 3/5

Updated: Jan-24

HST3 Expansion Anchor

Hilti New Zealand Ltd Level 1, Building B, 600 Great South Rd P.O. Box 112-030 | Ellerslie, Auckland 1051 P 0800 444 584 | E ServiceNZ@hilti.com

Ultimate-performance expansion anchor for seismic actions into ComFlor® 60 and 80

Setting Information

Sym. Units

Nominal anchor diameter (mm)

8

10

12

16

Nominal bit diameter

do

mm

8

10

12

16

Effective min. embedment

hef

mm

47

60

70

85

Nominal embedment

hnom

mm

54

68

80

98

Min. hole depth

ho

mm

59

73

88

106

Installation torque Methods for application of torque moment

Tinst -

Nm

20

45

60

110

-

Machine torquing using a Hilti SIW 6AT-A22 impact wrench with SI-ATA22 adaptive torque module or manual torquing using a torque wrench

Loads according to Figure 3

Minimum concrete thickness over upper flute

hmin,deck

mm

70

Minimum distance to edge of lower flute

cmin,deck

mm

Characteristic pullout resistance in non-cracked concrete

NRk,p,deck,uncr

kN

Characteristic pullout resistance in cracked concrete

NRk,p,deck,cr

kN

43 11.9 8.0

45 18.6 12.7

47 20.6 16.5

50 29.2 20.4

Chacteristic pullout resistance, seismic C1

NRk,p,deck,C1

kN

8.0

12.7

16.5

20.4

Partial safety factor for pullout resistance

gc

-

1.5

Robustness factor for pullout resistance

ginst

-

1.0

Characteristic steel resistance for shear

VRk,s,deck

kN

Characteristic steel resistance for shear, seismic C1

VRk,s,deck,C1

kN

15.0 13.6

24.2 21.9

21.4 19.4

26.0 22.9

Design steel resistance for shear, seismic C1

VRd,s,deck,C1

kN

9.0

14.6

13.0

15.3

Partial safety factor for steel resistance for shear

gMs,V

-

1.25

Table 3 - Hilti HST3 anchors tension and shear design data for installation in the soffit of f'c = 30 MPa, normal weight concrete-filled profile deck assemblies for hammer drilled installations
All data in Table 3 applies to: - Correct installation. See anchor box or Hilti.co.nz for details including hole cleaning and installation torque - No edge distance and spacing influence. Only one anchor can be used in the lower flute at a time with the min. spacing
between anchors along the length of the flute to be at least 3 x hef. This datasheet does not give information for the design of fasteners in a group. - f'c = 30 MPa concrete. For higher compressive strengths, the tension loads may be increased by (f'c /30)0.5 - gap = 1.0 (no hole clearance between anchor and fixture) was used to in the formula VRd,s,deck,C1 = gap x eq x VRk,s,deck,C1 / gMs,V In case of connections with hole clearance according to EN 1992-4 Table 6.1, gap = 0.5 should be used - Testing in accordance with ACI 355.2 and AC 193. Evaluated in accordance with AC 193 and EAD 330232 and EOTA TR 049
For anchoring into the upper flute, either use Table 2 data below conservatively or refer to ETA-98/0001. Additionally, C2 seismic performance category is not included in ACI 355.2 and AC 193. C2 seismic performance category may be designed in the upper flute using all guidelines and parameters provided in ETA-98/0001. ComFlor® is a registered trademark used in Australia and New Zealand under licence from Tata Steel UK Limited. © Copyright 2017 ComFlor® New Zealand. S&T Stainless Ltd.

Pg. 4/5

Updated: Jan-24

Figures for performance data

Hilti New Zealand Ltd Level 1, Building B, 600 Great South Rd P.O. Box 112-030 | Ellerslie, Auckland 1051 P 0800 444 584 | E ServiceNZ@hilti.com

HUS3 and HUS4 Ultimate screw anchors
Upper flute installation

Min. 300mm

Upper flute installation Min. 30mm

hmin,deck

Max 80mm

Min. 180mm

cmin,deck

Min. 120mm

AS 1397 - G500, min 0.75 mm thick
ComFlor® 60 or ComFlor® 80 metal deck or similar profile with conforming geometry

Figure 1 - Hilti HUS4/HUS3 in the soffit of concrete filled open trough profile steel deck assemblies

HUS4 Ultimate screw anchor
Min. 200mm

hmin,deck

Max 55mm

cmin,deck
Max 18mm

Max 40mm

AS 1397 - G500, min 0.75 mm thick
ComFlor® SR metal deck or similar profile with conforming geometry

Figure 2 - Hilti HUS4 in the soffit of concrete filled re-entrant profile steel deck assemblies

HST3 Ultimate expansion anchor
Upper flute installation

hmin,deck Max 80mm

Min. 180mm

cmin,deck

Min. 300mm
Min. 120mm

Figure 3 - Hilti HST3 in the soffit of concrete filled open trough profile steel deck assemblies

Upper flute installation Min. 30mm
AS 1397 - G500, min 0.75 mm thick ComFlor® 60 or ComFlor® 80 metal deck or similar profile with conforming geometry

Pg. 5/5

Updated: Jan-24



References

Microsoft PowerPoint for Microsoft 365 Microsoft PowerPoint for Microsoft 365