ZP3-HCMS Installation and Operation Instructions
(Versions 301) 2 Heat / 2 Cool - Auto Changeover First Call Priority - Time Share

HVAC Controls

High and Low Limit Protection:
The ZPA-DTS Discharge Temperature Sensor should be mounted on the discharge air plenum of the HVAC unit and wired to the DA terminals on the panel. The sensor is used for both high and low limit protection. The high limit setting can be adjusted using the two slide switches located on the panel. (See switch location and settings on page 2) The low limit is fixed at 45° F. When the discharge air temperature rises above the high limit setting or falls below the low limit setting, the panel will cycle the equipment off while the fan continues to run. The LIMIT LED blinks when high or low limit is reached.

Sequence of Operation:
The ZP3-HCMS is a residential / light commercial zone control system that allows a single HVAC unit to have up to three separate zones. Each zone is controlled by its own space thermostat and motorized zone damper. If a zone thermostat calls for heating or cooling, the zones not calling will have their dampers powered closed, and the zone calling will have its damper opened. The heating or cooling equipment will also be brought on at the same time. When the zone calling is satisfied, the heating or cooling equipment turns off. If one zone calls for heating and another zone calls for cooling, the first zone to call receives priority. When the first call is satisfied, the system will changeover and take care of the opposite call. If a zone being served (heating or cooling) has not been satisfied within 20 minutes while an opposite call is taking place, the system will changeover. When the zone is satisfied or 20 minutes has elapsed, the system will again changeover if an opposite call exists. This is referred to as Auto Changeover - First Call Priority - Time Share. In the event of a tie, cooling will receive priority.

Ventilation Mode:
Zone ventilation is established by the individual zone thermostat fan setting. Any thermostat set in the fan AUTO mode will not receive ventilation air when there are no heating or cooling calls. Any thermostat set in the fan ON mode will receive ventilation air whenever there are no heating or cooling calls.
Power Requirements:
The ZP3-HCMS requires a separate 24 Vac transformer. A 40 VA transformer will power the panel and up to four (4) dampers. A 75 VA transformer will power the panel and up to seven (7) dampers. If more than three (3) dampers for an individual zone are required, a RY-1-HB relay should be used with an additional properly sized transformer. iO Systems HD-XXXX rectangular and D-XX round dampers are powered closed / spring return open. Damper actuators are rated at 10 VA. If 3-wire dampers (powered open / powered closed) are installed, VA ratings will vary depending on the damper actuator used.
Wiring:
All wiring should be conventional 18 gauge thermostat wire. Thermostats and zone dampers may be located up to 300 feet from the ZP3-HCMS panel.

ZP3-HCMS Installation and Operation Instructions
(Versions 301) 2 Heat / 2 Cool - Auto Changeover First Call Priority - Time Share

ZONE 1 THERMOSTAT
ZONE 1 DAMPER
ZONE 2 THERMOSTAT
ZONE 2 DAMPER
ZONE 3 THERMOSTAT
ZONE 3 DAMPER 24 VOLTS

ZONE 3 THERMOSTAT

DAMPER

ZONE 2 THERMOSTAT

DAMPER

ZONE 1 THERMOSTAT

PURGE
SWITCH
(When set to ON, fan will continue to run and air will
be purged to last zone calling for 1 minute after call is satisfied)

301HC

PURGE

C

24V

24 VOLT POWER LED

ON OFF

R

ON

W1

W2

1

2

Y1

ADJUSTABLE

HIGH LIMIT

Y2 G

SWITCH 12

LIMIT

OFF OFF 130

PC

ON OFF 140

C

OFF ON 150

ON ON 160

PO

C

W1

FIRST STAGE HEAT LED

W2

SECOND STAGE HEAT LED

Y1

FIRST STAGE COOL LED

Y2

SECOND STAGE COOL LED

G

FAN LED

R

W1

LIMIT HIGH / LOW LIMIT LED

W2

ZD1

ZONE 1 DAMPER LED

Y1

Y2

ZD2

ZONE 2 DAMPER LED

G

PC

ZD3

ZONE 3 DAMPER LED

C

PO

RC/RH

JUMPER

RH/RC JUMPER

C

R

RH

W1

RC

HVAC UNIT

W2 W1

Y1 Y2

W2

HVAC UNIT TERMINALS

Y1

G Y2

PC G

C

SENSOR

PO

DA

DISCHARGE

DA

TEMPERATURE SENSOR

R

X

24VAC DAMPER POWER

4 AMP
ZONE SYSTEM 4 AMP
4 Amp fuse protects printed circuit board

4 AMP
HVAC EQUIPMENT 4 AMP
4 Amp fuse protects the relay contacts

ZP3-HCMS Installation and Operation Instructions
(Versions 301) 2 Heat / 2 Cool - Auto Changeover First Call Priority - Time Share

Installation

Wiring the Transformer:

Wire a separate 24 Volt transformer of the proper

Mounting the Panel:

VA to the logic panel terminals marked (R) and

Carefully remove the ZP3-HCMS panel and (X). Do not power the panel up until wiring is

cover from the shipping carton. Slide the PC completed.

board out of the snap track base and mount the

base to a flat surface either on or near the HVAC Test, Check and Startup:

indoor unit in an area that will facilitate easy 1. Verify that all component wires have been

access for wiring. Reinstall the PC board by connected to the proper terminals and are secure.

carefully centering it over the base and snapping 2. Disconnect the HVAC equipment (R) terminal

it back into the track groves.

wire at the panel and apply 24 Volts to panel.

3. Take a jumper wire and momentarily short the

Wiring the Zone Thermostats and Dampers: DA terminals. This will put the panel's time delays

Refer to the logic panel wiring diagram. Wire in "speed up" mode.

zone 1 thermostat and its associated damper to 4. Place the zone thermostats in the OFF position.

the ZONE 1 terminals on the logic panel. Wire 5. The panel accepts 2-wire (power close / spring

zone 2 and 3 thermostats and dampers in the open) or 3-wire (power open / power close) zone

same manner.

dampers. 2-wire dampers should be wired to the

(C) and (PC) terminals.

Wiring the HVAC Equipment:

6. Place zone one thermostat in the fan ON mode.

Wire the HVAC unit to the panel terminals. Do not ZD1 LED will remain on and ZD2 and ZD3 LED

wire the equipment common to the ZP3-HCMS will go out. The (G) FAN LED will come on.

panel.

7. Confirm that zone one damper is in the open

position and zone two and three dampers are

Installing and Wiring the ZPA-DTS

closed.

Discharge Temperature Sensor:

8. Leave zone one thermostat in fan ON and place

Drill a 15/32" hole in the middle of the main zone two thermostat in the fan ON mode. ZD2

discharge air plenum approximately 18" to 30" LED will come on.

from the heat pump electric strip heater or the 9. Confirm that both zone one and zone two

furnace heat exchanger in a fossil fuel dampers are in the open position and zone three

application. Slide the discharge air probe into the damper is closed.

hole and use two self-tapping sheet metal 10. Leave zone one and zone two thermostats in

screws to secure the base to the plenum. Use Fan ON and place zone three thermostat in the

conventional 18-2 thermostat wire and wire nuts fan ON mode. ZD3 LED will come on. Confirm

to attach the sensor leads. Replace the cover that all zone dampers are in the open position.

with the wire nut connections inside. Strip 1/8" 11. Place all zone thermostats in the Auto fan

insulation off of each wire at the other end and mode.

and the wires to the screw terminals marked DA 12. Remove 24 Volts to the panel and reconnect

on the panel.

the HVAC ® wire.

10. When 24 Volts is applied again to the panel,

the internal time delays will be activated.

11. Place zone thermostats in proper mode of

operation.

12. Confirm that the LIMIT LED is ON. If not,

check LIMIT wiring. If the system goes out on high

or low limit, the LIMIT LED will blink.

ZP3-HCMS Installation and Operation Instructions
(Versions 301) 2 Heat / 2 Cool - Auto Changeover First Call Priority - Time Share

Specifications
Panel Dimensions: Height: 8.0 Inches Width: 6.0 Inches Depth: 1.375 Inches
Mounting: Snap Track with 2 back plate screws
Operating Temperature Rating: -40° F to 150° F
Operating Humidity: 5% to 90% RH non-condensing
Wiring: 18-gauge wire for all equipment and system connections
Time Delays: 3 minutes minimum off between cooling calls 3 minutes minimum off on low limit 20 minute time share Purge ON = 1 minute
Thermostats: Single or multi-stage heat / cool Programmable or non-programmable Auto or manual changeover

Dampers: PC C PO

Powered Closed Common Powered Open

High / Low Limit

DA

Land to ZPA-DTS

DA

Land to ZPA-DTS

HVAC Equipment:

RH

24Vac Heating Transformer

RC

24Vac Cooling Transformer

W1

First Stage Heat

W2

Second Stage Heat

Y1

First Stage Cool

Y2

Second Stage Cool

G

Fan

Panel Power:

R

24Vac (Hot)

X

24Vac (Common)

ZONE 3 STAT

ZONE 2 STAT
ZONE DAMPER 2

ZONE DAMPER 3

ZONE 1 STAT
ZONE DAMPER 1

Terminal Designations

Thermostats:

C

24Vac (Common)

R

24Vac (Hot)

W1

First Stage Heat

W2

Second Stage Heat

Y1

First Stage Cool

Y2

Second Stage Cool

G

Fan

DISCHARGE TEMPERATURE
SENSOR
ZP3-HCMS PANEL
24 VOLT TRANSFORMER
FURNACE

HVAC Controls
Indianapolis, IN 46237

www.iohvaccontrols.com For Technical Support Call Toll Free: 866-225-5032
iO-06-1168-010818



References

Acrobat Distiller 10.1.16 (Windows)