Instruction Manual for STEEL GREEN models including: SG46 35 Gallon Tank Attachment, SG46, 35 Gallon Tank Attachment, Gallon Tank Attachment, Tank Attachment, Attachment

Proto

view manual

View Step-By-Step Instruction Manuals | Steel Green Manufacturing

INSTRUCTION MANUAL


File Info : application/pdf, 12 Pages, 719.69KB

PDF preview unavailable. Download the PDF instead.

35-gallon-tank-attachment
INSTRUCTION MANUAL
35 GALLON TANK ATTACHMENT Models: SG46, & SG52

35 GALLON INSTALL INSTRUCTIONS
2

35 GALLON INSTALL INSTRUCTIONS
3

35 GALLON INSTALL INSTRUCTIONS
STEP ONE: · Disconnect the battery, ground first and then
power wire. · Remove the battery from the battery box.

GROUND
STEP TWO: Disconnect the hoses from the hopper and connect them to the circulation fitting. NOTE: Hold the hoses up to prevent oil spillage

POWER

4

35 GALLON INSTALL INSTRUCTIONS

STEP THREE: Disconnect the cables from the dash.

DIFFUSER

RATE GATE

DEFLECTOR

NOTE: Be sure the hopper is empty before proceeding.
STEP FOUR: Remove the six bolts that hold the hopper assembly to the frame and lift the hopper assembly from the frame.

5

35 GALLON INSTALL INSTRUCTIONS
STEP FIVE: · Set the 35 gallon tank assembly on the frame. · Attach it to the frame with the six bolts.
6

35 GALLON INSTALL INSTRUCTIONS

VALVE ASSEMBLY

VALVE ASSEMBLY W/FOAM MARKER

STEP SIX: Remove the (2) bolts that secure the gas tank support and Attach the valve assembly to the left side of the upright.
7

35 GALLON INSTALL INSTRUCTIONS
NOTE: · Before beginning step seven, BE SURE there is
no pressure on the lines and fluid is drained. · Parts removed for clarity.
STEP SEVEN: · Remove the knee pad to access the return &
suction lines.
· Carefully cut and install the "tee" fittings in the "suction" and "return" lines as shown (blue arrows). Securely fasten with 3/4 hose clamps.

PARTS LIST

ITEM QTY PART NUMBER

DESCRIPTION

1 4

12HS

HOSE CLAMP, 3/4

2 2

S50062 TEE FITTING, 3/4 HOSE

8

35 GALLON INSTALL INSTRUCTIONS
STEP EIGHT:
· Cut and install 3/4" suction hose, connecting one end to the suction fitting on the top valve and the other end to the "tee" fitting in the suction line.
· Cut and install 3/4" return hose, connecting one end to the return fitting on the bottom valve and the other end to the "tee" fitting in the return line.
· Securely fasten each end with 3/4" hose clamp.

SUCTION

RETURN

RETURN

SUCTION

9

35 GALLON INSTALL INSTRUCTIONS
STEP NINE: Connect the "quick disconnect" hoses from the tank to the valves. · Top valve is SUCTION. · Bottom valve is RETURN.

VALVE ASSEMBLY

VALVE ASSEMBLY W/FOAM MARKER SUCTION RETURN

10

35 GALLON INSTALL INSTRUCTIONS
STEP TEN:
· Set the battery in the battery box.
· Reconnect the battery cables, power cable and wires first followed by the ground wire.
· Attach the battery box cover and bungie strap.

GROUND

POWER

11

MADE IN THE USA

Steel Green Mfg. 824 S State Road 39 Lebanon, IN 46052 (765)-481-2890 www.steelgreenmfg.com

MANUAL PART NO.
SGM-008

MANUAL REV.
B

DESCRIPTION 35 GALLON TANK ATTACHMENT

KIT PART NO.

12



References

Microsoft Publisher for Microsoft 365 iLovePDF