Installation Guide for Built-in Fridge-Freezer
Safety and Tools
Safety Precautions:
- [read-manual-icon] Please read all instructions before beginning installation.
- [gloves-icon] Wear protective gloves during installation.
Required Tools:
- Torx T20 screwdriver
- Pencil
- Spirit level
- Tape measure
- Scissors ✂️
- Drill with Ø 2 mm bit
- Hammer ?
Parts Included:
- 2x small brackets/connectors
- 18x 4x15 T20 screws
- 3x mounting rails/brackets
- 4x brackets/connectors
- 4x M5x10 T20 screws
- 2x 4x12 T20 screws
- 2x M4x16 T20 screws
- 2x M4x14 T20 screws
- 4x mounting brackets
- Electrical cable
General Information:
- Ensure a minimum ventilation area of 200 cm².
- The appliance door can open up to 90°.
- Maintain a minimum clearance of 150 mm.
- Appliance dimensions: Height ≥ 710 mm (750 mm).
- Weight: 560 kg (Note: This value may represent a load capacity or a different unit).
Door Attachment and Adjustment
Follow these steps to attach and adjust the appliance doors:
Step 1: Prepare Cabinet and Hinges
Attach hinge mounting plates to the cabinet using the provided screws.
Diagram Description: Shows mounting plates being screwed into the cabinet frame.
Step 2: Attach Door Panels
Align the door panels with the appliance body and the pre-attached hinges.
Diagram Description: Shows door panels being positioned against the appliance.
Step 3: Secure Hinges to Door Panels
Connect the hinges to the door panels using screws. Ensure correct orientation.
Diagram Description: Shows screws being used to attach hinges to the door panels.
Step 4: Adjust Door Alignment
Use adjustment screws on the hinges to fine-tune the door position. This includes rotational adjustments and sliding adjustments to ensure proper alignment and gaps.
Diagram Description: Illustrates using screws to adjust door rotation and horizontal/vertical position. Shows a minimum gap of 2 mm between panels.
Step 5: Connect Cables
Connect any necessary electrical cables to the appliance or door mechanism.
Diagram Description: Shows electrical cables being plugged in.
Step 6: Secure Mounting Rails
Attach and secure the mounting rails to the cabinet and/or appliance as indicated.
Diagram Description: Shows rails being screwed or clipped into place.
Step 7: Final Checks
Ensure all panels are securely attached and aligned. Test the door opening and closing mechanism.
Diagram Description: Shows a final check with a checkmark ✔️ indicating successful installation.
Handle Installation
Attach the appliance handles to the door panels:
Diagram Description: Shows handles being positioned on the door panels.
Secure the handles using the provided screws. Ensure they are firmly attached.
Diagram Description: Illustrates screws being inserted and tightened to fix the handles.
Additional Installation Steps
Follow specific instructions for attaching various mounting brackets and rails to the appliance and cabinet.
Diagram Description: Shows detailed steps for attaching different types of rails and brackets, including drilling pilot holes (Ø 2 mm) and using screws. Some steps involve clicking components into place.
Ensure all components are correctly seated and secured, indicated by a 'CLICK' sound or visual confirmation.
Notes
This section is provided for user notes.
Diagram Description: A blank lined page.