Welch Allyn® Spot Vital Signs 4400 Assembly Instructions
Mat. No. 774091, 80028441 Ver. B | Revision date: 2022-04
© 2022 Welch Allyn, Inc. All rights reserved.
Welch Allyn, Inc. is a subsidiary of Hill-Rom Holdings, Inc.
For support, visit: Hillrom Technical Support
Product Overview
This document provides assembly instructions for the Welch Allyn® Spot Vital Signs 4400 monitor. It covers the assembly of the main unit and specific configurations for the 4400-DST (stand) and 4400-MBS (mobile stand base).
Key references:
- Main Unit/Accessories: REF 44WT, REF 44XT
- DST Configuration: REF 4400-DST
- MBS Configuration: REF 4400-MBS
Main Unit Assembly
Step 1: Install Battery ?
Open the battery compartment and insert the battery.
Step 2: Close Battery Compartment ✔️
Close the battery compartment cover securely.
Step 3: Connect Power Adapter ?
Connect the power adapter cable to the main unit.
Configuration A: 4400-DST Stand Assembly
Step A1: Assemble Stand Base
Assemble the DST stand base. Attach the power adapter bracket to the stand using screws (10 mm spacing indicated).
Step A2: Connect Cables
Connect the power cable (1) and sensor cable (2) to the main unit. Connect the temperature probe cable (3) and other sensor cables (4).
Step A3: Insert Temperature Probe ?️
Insert the temperature probe into the designated port on the main unit.
Step A4: Mount Main Unit to Stand
Secure the main unit to the assembled DST stand using four screws (1 x 4).
Step A5: Final Connections and Charging
Connect the power adapter to a power source ⚡. The unit requires approximately 2 hours (2h) for initial charging.
Configuration B: 4400-MBS Mobile Stand Base Assembly
Step B1a: Assemble MBS Basket (Option 1)
Attach the basket to the power adapter bracket using two screws (3 x 2).
Step B1b: Assemble MBS Basket (Option 2)
Attach the basket to the power adapter bracket using two screws (4 x 2).
Step B2: Connect Cables
Connect the power cable (1) and sensor cable (2) to the main unit. Connect the temperature probe cable (3) and other sensor cables (4).
Step B3: Mount Main Unit to MBS Bracket
Attach the main unit to the assembled MBS bracket using four screws (1 x 4).
Step B4: Insert Temperature Probe ?️
Insert the temperature probe into the designated port on the main unit.
Step B5: Final Connections and Charging
Connect the power adapter to a power source ⚡. The unit requires approximately 2 hours (2h) for initial charging.
Support and Information
For further assistance, please contact Hillrom Technical Support.
Visit hillrom.com for more information.