Quick Start Guide
800 Gigabit AI & Data Center Ethernet Switch
AIS800-64O
Package Contents

www.edge-core.com

1
1. 64-Port 800 Gigabit AI & Data Center Ethernet Switch AIS80064O
2. Slide-rail mounting kit--2 rack slide-rails and install guide 3. AC power cord, type IEC C19/C20 (included with AC PSUs only)

2

3

4

5

4. DC power cord (included with DC PSUs only)
5. Documentation--Quick Start Guide (this document) and Safety and Regulatory Information

Overview

1

2

6

7

3
1. 64 x 800G OSFP800 ports 2. Management Ports: 1 x 1000BASE-T RJ-45, 2 x 25G SFP28,
RJ-45 console, USB 3. Timing Ports: 1PPS, 10 MHz, TOD 4. System LEDs

4 5
5. 2 x grounding screws 6. 2 x AC or DC PSUs 7. 4 x fan trays

1 2
3
5

System LEDs/Buttons

1. OSFP800 LEDs: Purple (800G), Blue (400G), Cyan (200G),

Green (100G), Red (50G)

2. RJ-45 MGMT LEDs: Left: Green (link/act), Right: Green (speed)

2

3. SFP28 LEDs: Green (link/activity)

4. System LEDs:

LOC: Flashing Green (switch locator)

4

DIAG: Green (OK), Red (fault)

ALRM: Red (fault)

FAN: Green (OK), Red (fault)

PSU1/PSU2: Green (OK), Red (fault)

5. RST: Reset button

FRU Replacement

PSU Replacement 1. Remove the power cord.
2. Press the release latch and remove the PSU.
3. Install replacement PSU with matching airflow direction.

Fan Tray Replacement 1. Pull the handle release latch.
2. Remove the fan tray from the chassis.
3. Install a replacement fan with matching airflow direction.



­ 1 ­

Caution: During switch operation, fan replacement should be completed within two minutes to prevent the switch shutting down due to its built-in over-temperature protection. Attention: Pendant le fonctionnement du commutateur, le remplacement du ventilateur doit être effectué dans les deux minutes pour éviter que le commutateur ne s'arrête en raison de sa protection intégrée contre la surchauffe.
E072024-AP-R02 150200002691A

Installation

Quick Start Guide

Warning: For a safe and reliable installation, use only the accessories and screws provided with the device. Use of other accessories and screws could result in damage to the unit. Any damages incurred by using unapproved accessories are not covered by the warranty. Avertissement: Pour une installation sûre et fiable, utilisez uniquement les accessoires et les vis fournies avec l'appareil. L'utilisation d'autres accessoires et vis pourrait endommager l'appareil. Les dommages causés par l'utilisation d'accessoires non approuvés ne sont pas couverts par la garantie. Caution: The device must be installed in a restricted-access location. Attention: L'appareil doit être installé dans un emplacement à accès restreint. Note: The device has the Open Network Install Environment (ONIE) software installer preloaded, but no device software image. Note: The drawings in this document are for illustration only and may not match your particular model.
1 Mount the Device
Caution: This device must be installed in a telecommunications room or a server room where only qualified personnel have access. Attention: Cet appareil doit être installé dans une salle de télécommunications ou une salle de serveurs où seul le personnel qualifié a accès.

2 Ground the Device
Verify Rack Ground Ensure the rack on which the device is to be mounted is properly grounded and in compliance with ETSI ETS 300 253. Verify that there is a good electrical connection to the grounding point on the rack (no paint or isolating surface treatment). Attach Grounding Wire Attach a grounding wire to the grounding point on the device rear panel using two M6 screws and washers with a grounding lug (Panduit LCDXN2-14AF-E or equivalent, not included). The grounding lug should accommodate #2 AWG stranded copper wire (green with yellow stripe, not included).
3 Connect Power

Using the Slide-Rail Kit Follow instructions in the install guide provided in the slide-rail kit to mount the device in a rack.
Note: Stability hazard. The rack may tip over causing serious personal injury. Before extending the rack to the installation position, read the installation instructions. Do not put any load on the slide-rail mounted equipment in the installation position. Do not leave the slide-rail mounted equipment in the installation position.

Install one or two AC or DC PSUs and connect them to an AC or DC power source.
Note: When using only one AC PSU to power a fully loaded system, be sure to use a high-voltage source (200­240 VAC).

3

1

2

1

2

4

1. -48 ­ -60 VDC 2. DC return 3. Signal +
4. Signal -

­ 2 ­

Quick Start Guide

Caution: Use a UL/IEC/EN 60950-1 and/or 62368-1 certified power supply to connect to a DC converter. Attention: Utilisez une alimentation certifiée UL/IEC/EN 60950-1 et/ou 62368-1 pour le connecter à un convertisseur CC. Caution: All DC power connections should be performed by a qualified professional. Attention: Toutes les connexions d'alimentation CC doivent être effectuées par un professionnel qualifié. Note: Use #4 AWG / 21.2 mm2 copper wire (for a -48 to -60 VDC PSU) to connect to a DC PSU.
4 Make Network Connections
800G OSFP800 Ports Install transceivers and then connect fiber optic cabling to the transceiver ports. Alternatively, connect DAC or AOC cables directly to the slots.
5 Connect Timing Ports

6 Make Management Connections

25G SFP28 In-Band Management Ports Install transceivers and then connect fiber optic cabling to the transceiver ports.
10/100/1000M RJ-45 Out-of-Band Management Port Connect Cat. 5e or better twisted-pair cable.
RJ-45 Console Port Use an RJ-45-to-DB-9 null-modem console cable (not included) to connect to a PC running terminal emulator software. Use a USB-tomale DB-9 adapter cable (not included) for connections to PCs that do not have a DB-9 serial port.
Configure the serial connection: 115200 bps, 8 characters, no parity, one stop bit, 8 data bits, and no flow control.
Console cable pinouts and wiring:

Device's RJ-45 Console Null Modem PC's 9-Pin DTE Port

6 RXD (receive data)

<--------------- 3 TXD (transmit data)

3 TXD (transmit data)

---------------> 2 RXD (receive data)

4,5 SGND (signal ground) ----------------- 5 SGND (signal ground)

1PPS Port Use a coax cable to connect the 1-pulse-per-second (1PPS) port to another synchronized device.
10 MHz Port Use a coax cable to connect the 10 MHz port to another synchronized device.
TOD Port Use a shielded cable to connect the Time-of-Day (TOD) RJ-45 port to other devices that use these synchronization signals.

­ 3 ­

Hardware Specifications

Switch Chassis

Size (WxDxH) 440 x 649.2 x 87 mm (17.32 x 25.56 x 3.43 in.)

Weight

20.5 kg (45.19 lb), with 2 PSUs and 4 fans installed

Temperature

Operating (front- to- back): 0° C to 40° C (32° F to 104° F) at 1800 m Operating (back-to-front): 0° C to 35° C (32° F to 95° F) at 1800 m *subject to used optics Storage: -40° C to 70° C (-40° F to 158° F)

Humidity

Operating: 5% to 95% (non-condensing)

AC PSU AC Input

200-240 VAC, 50/60 Hz, 16 A max.

DC PSU DC Input

-48 to -60 VDC 80 A max.

System Input Rating

AC Input

200-240 VAC, 50/60Hz, 16 A max. per PS

DC Input

-48 ­ -60 VDC, 80 A max. per PS

Regulatory Compliances

Emissions

EN 55032 Class A EN 61000-3-2 EN 61000-3-3 VCCI-CISPR 32 Class A AS/NZS CISPR 32 Class A ICES-003 Issue 7 Class A FCC Class A EN 300 386 Class A CNS 15936 Class A

Immunity

EN 55035 IEC 61000-4-2/3/4/5/6/8/11 EN 300 386

Safety

UL (CSA 22.2 No 62368-1 & UL62368-1) CB (IEC/EN 62368-1) BSMI CNS 15598-1

Quick Start Guide

­ 4 ­


800G 
AIS800-64O



www.edge-core.com

1
1. 64  800G  AIS800-64O 2.  --2  3. AC IEC C19/C20  (  AC PSU  )

2

3

4

5

4. DC   DC PSU  5.  



1

2

6

7

1. 64 x 800G OSFP800  2. 1 x 1000BASE-T RJ-452 x 25G SFP28
RJ-45 USB
3. 1PPS10 MHzTOD
4.  LED

4

3

5

5. 2 x  6. 2 x AC  DC PSUs 7. 4 x 

LED

1

2

2

3 4
5

1. OSFP800 LED (800G) (400G) (200G)  (100G) (50G)
2. RJ-45 MGMT LED (  /  ) (  )
3. SFP28 LED  / 
4.  LED LOC  DIAG (OK) (  ) ALRM (  )  (OK) (  ) PSU1/PSU2 (OK) (  )
5. RST

 FRU

 PSU 1.  2.  PSU
3.  PSU

 1.  2. 
3.  

  Attention: Pendant le fonctionnement du commutateur, le remplacement du ventilateur doit être effectué dans les deux minutes pour éviter que le commutateur ne s'arrête en raison de sa protection intégrée contre la surchauffe.

­ 5 ­





   Avertissement: Pour une installation sûre et fiable, utilisez uniquement les accessoires et les vis fournies avec l'appareil.L'utilisation d'autres accessoires et vis pourrait endommager l'appareil.Les dommages causés par l'utilisation d'accessoires non approuvés ne sont pas couverts par la garantie.
 Attention: L'appareil doit être installé dans un emplacement à accès restreint.
  Open Network Install EnvironmentONIE   
1 

2 
  ETSI ETS 300 253     M6  Panduit LCDXN2-14AF-E    #2 AWG  

  Attention: Cet appareil doit être installé dans une salle de télécommunications ou une salle de serveurs où seul le personnel qualifié a accès.

3 

 
   

 AC  DC PSU  AC  DC   AC PSU   (200-240 VAC)

3

1

2

1

2

4

1. -48 ­ -60 VDC 2. DC  3.  + 4.  -

­ 6 ­



 UL/IEC/EN 60950-1  /  62368-1   DC  Attention: Utilisez une alimentation certifiée UL/IEC/EN 60950-1 et/ou 62368-1 pour le connecter à un convertisseur CC.  DC  Attention: Toutes les connexions d'alimentation CC doivent être effectuées par un professionnel qualifié.  #4 AWG / 21.2 mm2  (  -48  -60 VDC PSU)  DC PSU
4 
800G OSFP800    DAC  AOC 
5 

6 

25G SFP28   10/100/1000M RJ-45   5e  RJ-45   RJ-45-  -DB-9    USB-  -  DB-9  (   )  DB-9  115200 bps8  1  8 


 RJ-45 

  9  DTE 

6 RXD 

<--------------- 3 TXD 

3 TXD 

---------------> 2 RXD 

4,5 SGND  ----------------- 5 SGND 

1PPS   1  (1PPS)  10 MHz   10 MHz  TOD   (TOD) RJ-45  

­ 7 ­



  x  440 x 649.2 x 87 mm17.32 x 25.56 x 3.43  x 



20.5 kg (45.19 lb) 2  PSU  4 



 (F-to-B)0° C  40° C (32° F  104° F) 1800   (B-to-F)0° C  35° C (32° F  95° F)  1800  *  -40° C  70° C (-40° F  158° F)



5%  95% (  )

AC PSU

AC 

200-240 VAC50/60 Hz 16 A

DC PSU

DC 

-48  -60 VDC 80 A



AC 

200-240 VAC50-60Hz PS  16 A

DC 

-48 ­ -60 VDC PS  80 A

 

EN 55032 Class A EN 61000-3-2 EN 61000-3-3 VCCI-CISPR 32 Class A AS/NZS CISPR 32 Class A ICES-003 Issue 7 Class A FCC Class A EN 300 386 Class A CNS 15936 Class A



EN 55035 IEC 61000-4-2/3/4/5/6/8/11 EN 300 386



UL (CSA 22.2 No 62368-1 & UL62368-1) CB (IEC/EN 62368-1) BSMI CNS 15598-1



­ 8 ­



References

Adobe PDF Library 17.0