TRANSIT 148" CEILING KIT
Installation Guide
www.sergsupply.com

Ceiling Kit Installation - Transit 148"

What you will need to get started:
Power Drill With Phillips Drive
Rivet Nut Tool With 1/4"-20 Thread Pattern
Screwdriver With Phillips drive

Disclaimer!
This cabinet must be fastened properly to the walls of the vehicle to avoid damage or injury. You are responsible for ensuring that this cabinet is fastened using rivet
nuts or other fastening method equal in strength. Modification to this unit may affect the structural strength of the unit. Avoid making large cuts on vehicle partitions or beams as this may weaken the vehicle. You are responsible for ensuring proper wiring and insulation when wiring your build as faulty wiring may create a fire hazard. Any cabinetry or load-bearing components need to be
mounted to the vehicle and not to the cabinet alone.

Ceiling Kit Installation - Transit 148"
What's Included:
Ceiling Panels Installation Hardware
Layout:
This kit uses a row-by-row method that makes installation easier.
Unpack all the ceiling Panels. Please note they are packaged by row (1-9). Look at the illustration for placement.

Front of Van (A Panels)

The Direction of arrows is towards the front of Van.
Panels must be placed by rows from A-panel to D-panel.

864 2 1 3 579

Rear of Van (D, E or F Panels)

Please! Keep Panels with their respective rows.

Ceiling Kit Installation - Transit 148"
GoCode Trim Kit
If you've purchased a GoCode Trim kit with your ceiling kit, you must install this trim kit first. You will notice the appearance of the kit is a bit different.
If you have the GoCode front trim kit, you do not need the included front row spacer panel.
Note: Standard ceiling kits have dual row puck lighting.

Ceiling Kit Installation - Transit 148"
Rivet Nuts & Proper Threading
Mark the proper holes with a permanent marker all at once before beginning to drill them out to size with the included drill bit. Be very careful not to apply too much pressure and keep the drill at a low speed to avoid damaging the outer shell of your vehicle if using any tool other than a Step bit. A drill bit tends to catch the metal and slam the bit into the sidewall of the van if you're not careful. Once all holes are drilled out, begin installing the rivet nuts. Be sure that the rivet nut is installed perpendicular to the surface as threading screws in at an angle may cross-thread the rivet nut.

NOTE: Rivet nut size is specifically chosen to match the opening size of the rectangular slots in your ceiling ­ drilling may not be necessary for beams.

Ceiling Kit Installation - Transit 148"
Take extra care to ensure the screw is threaded straight and not at an angle. Threading the screw at any angle may cross thread the rivet nut. Once all rivet nuts are installed, begin threading on your ceiling screws with a screwdriver.
Never use power tools to thread machine screws. Always use finish washers when doing final installation. These act to cover any re-sized holes and prevent the screws from loosening over time. The panels are designed to fit factory holes throughout the vehicle. Line up the panel up against the area it covers to approximate the holes you'll need to apply rivet nuts into.

Ceiling Kit Installation - Transit 148"
Every beam on the Transit 148" is identical. Reference the sketch on this page for an understanding on which holes will serve as mounting points.
Blue - Factory Holes that Need Rivet Nuts

Ceiling Kit Installation - Transit 148"
Mounting Furring Strips
Each furring strips mounts the same, but the hardware varies from row-to-row. Once the initial (2) rivet nuts are installed, you can use the 1-1/2" pan head screws + washers to hold the furring strip properly in place. Yes, the bolt heads are supposed to stick out on these two, not to worry - the ceiling panel kit rows (2) and (3) have corresponding
clearance cuts.
Black - Furring holes to have 1-1/2" pan head screws + flat washers installed

Ceiling Kit Installation - Transit 148"
Installing Plus Nuts and Rivet Nuts
Use the remaining pre-drilled holes in the furring strips as a guide to bore out plus-nut mounting holes in the vehicle metal beam using the step bit provided with your kit. Use safety glasses and wear a long sleeve for this step. The addition of plus nuts in the blue holes further bolsters the ceiling kit and makes it incredibly strong.
Holes in Black indicate existing Rivet Nuts, holes in Blue indicate where Plus-Nuts need to be installed, holes in green indicate additional holes where rivet nuts are installed (explained in next slide).

Ceiling Kit Installation - Transit 148"
Additional Rivet Nuts
A slight gap (5/8") exists between the aluminum and the vehicle beam. We feel there is no sense in drilling through this gap for a fastener, so a rivet nut lives at these points and a shorts 1" machine screw is used to mount the ceiling
(with GoCode) or a longer 1.25" machine screw with no Gocode.
Be careful not to use the standard long fasteners when installing rows 2 & 3.

Ceiling Kit Installation - Transit 148"
Spacer Beam 1
If you do Not have a GoCode front trim, you may need the spacer beam. Because of the extreme downwards curvature of the ceiling kit, we've added a spacer beam for
the front-most beam to relieve the sharp downward bend slightly. This may not perfectly relieve the curvature for the ceiling, but it will certainly help. Simply slide the spacer between
your furring strip + ceiling panels.
If you are using the spacer beam: Rows 1,4,5,6,7,8,9 get 2" machine screws + finish washers (on first beam only)
Rows 2,3 get 1.25" machine screws + finish washers (on first beam only) If you are NOT using the spacer beam:
Rows 1,4,5,6,7,8,9 get 1.5" machine screws + finish washers (all beams) Rows 2,3 get 1" machine screws + finish washers (all beams)

Ceiling Kit Installation - Transit 148"
Assembling Rows:
This kit uses a row-by-row method that makes installation easier. You will begin by assembling the A-D panels into 9 continuous rows.
The Face with label and direction carving goes up towards the ceiling. Thr Direction with arros is towards the front. Start by laying down row 1 on a clean and flat surface. With the arros all pointing in the proper direction, place panel 1A and 1B up against one another. Place your shim between the ends of the panels (from side to side) and fetch a union panel with (4) 1" screws.

Ceiling Kit Installation - Transit 148"
Place the union panel on top of the joint and align your 4 wood screws. Double check alignment and spacing before fastening. Repeat this process for the 3rd and 4th panel (A or D) until the row is complete. Continue this process until all 9 rows have been assembled. Pro Tip: Add wood glue between the union panels and ceiling panels for a better long term hold.

Ceiling Kit Installation - Transit 148"
Installing Your Panels:
Once all rows are assembled, start with Row 1 by flipping it such that the union panels are facing up towards the ceiling. Note: Furring strips not shown.
Start installation by having a friend hold the first row up with you and align the panel along the center of the vehicle.
Thread a ceiling screw with washer into the rivet nut installed on the ceiling along the entire Row 1 panel.

Ceiling Kit Installation - Transit 148"
Move onto Row 2 by holding the row up against Row 1. Lightly thread all the screws before shimming. Before tightening down a screw all the way, slip a shim between Row 1 and 2 for perfect spacing. Tighten the first screw and repeat this process for the rest of the screws. Keep in mind the different length of fasteners for rows 2 & 3. Install Rows 3-9 in the same manner, maintaining proper spacing between each.

Ceiling Kit Installation - Transit 148"
Cover Panels:
Once all ceiling panels are installed, you can install the front and rear cover panels.
Align the center of the cover panel with the center of Row 1. With the outer edges flsh, you can drive in the center screw with a power drill. Insert your shims between each row for perfect spacing before continuing. Align the outer row edges (Row 8 and 9) and drive the screws in place. Work your way from the center row outwards in both directions until all cover panels are installed before removing the shims.

Ceiling Kit Installation - Transit 148"
Ceiling Fan Cutouts:
If you purchase a ceiling kit with a pre-cut fan opening, installation will only differ in union panel placement if the fan lands on a gap between panels. If you have a "floating" panel A or D, the union panel holes will be oriented sideways to join the floating panels to Rows 2 and 3. You will need to install Rows 1-3 at the same time. Get a helping hand to prevent damaging the rows.

Ceiling Kit Installation - Transit 148"
Lighting and Wiring:
The beauty of row-by-row installation method is the ease of running wiring. You may loosen or remove the screws on a single row for an easier time feeding wiring through your ceiling.
Install puck lights by feeding wiring from the outside and pushing the puck light into place. The springs on the back will lock it in place. Each puck light set comes with a ballast that can be wired to your 12V power supply or dimmer.

