GV 44x Voll-I Installation Guide

Model: GS 9001 856 986

Estimated Assembly Time: 2-3 hours

Product Overview

This document provides installation instructions for the GV 44x Voll-I appliance component. It details the assembly process, required parts, hardware, and essential specifications for proper installation.

Parts List

The following numbered parts are used in the assembly process:

  • Part 1
  • Part 2
  • Part 3 (1.75m hose/cable)
  • Part 4
  • Part 5
  • Part 6
  • Part 7
  • Part 8
  • Part 9a, 9b (Fixing elements)
  • Part 10
  • Part 11
  • Part 12
  • Part 13
  • Part 14
  • Part 15
  • Part 16
  • Part 17
  • Part 18
  • Part 19
  • Part 20
  • Part 21
  • Part 22
  • Part 23
  • Part 24
  • Part 25
  • Part 26
  • Part 27
  • Part 28
  • Part 29
  • Part 30
  • Part 31
  • Part 32
  • Part 33
  • Part 34

Hardware and Tools

Fasteners:

  • Screws: 4x15mm, 4x30mm, 4x42mm, 4x28mm
  • Other fasteners (indicated by ' 2')

Tools Required:

  • Torx T20 driver
  • 13mm wrench (SW 13)
  • 10mm wrench (SW 10)

Material Numbers:

  • Mat.-Nr. 10011641
  • Mat.-Nr. 00350564
  • Mat.-Nr. 00657927
  • Mat.-Nr. 00644533
  • Mat.-Nr. 00644534

Assembly Instructions

Follow these steps carefully for correct installation. Pay attention to part numbers, fastener types, and orientation indicators (e.g., 2a, 2b, 9a, 9b).

Step 1: Preparation

Identify all parts and hardware. Ensure you have the necessary tools. Prepare the installation area.

Step 2: Attach Part 2 to Part 1

Connect Part 2 to Part 1 using 4x15mm screws ( 4x15). Ensure a secure and aligned fit.

Step 3: Connect Part 3

Attach the 1.75m hose/cable (Part 3) to the designated connection point. ⚠️ Do not pinch or bend (nicht einklemmen / do not pinch / ne pas coincer / No doblar).

Step 4: Mount Part 5

Secure Part 5 using 4x30mm screws ( 4x30). Ensure it is correctly positioned.

Step 5: Install Part 6

Attach Part 6 using 4x15mm screws ( 4x15). Ensure it engages properly, possibly with an audible 'click'.

Step 6: Secure Part 7

Fasten Part 7 with 4x42mm screws ( 4x42). ? Brace/Tighten vertically (verspannen / brace / calar verticalement / Enrasar) for stability.

Step 7: Install Part 8

Attach Part 8 using 4x28mm screws ( 4x28). Ensure correct orientation as indicated by labels like 9a or 9b.

Step 8: Connect Part 11

Install Part 11. Ensure it is properly seated. The connection area may be approximately 100x50mm.

Step 9: Adjustments and Clearances

Use adjustment features on Part 12 and Part 13 to fine-tune the position (⚙️ Adjust / rgler / ajustar). Maintain specified clearances: Minimum 70 mm, Maximum 120 mm. Some areas may require more than 120 mm clearance.

Step 10: Fasten Remaining Parts

Continue assembling subsequent parts (14 through 24) using the appropriate fasteners (e.g., 2, Torx T20 screws). Refer to specific diagrams for each connection. Ensure the assembly can support a weight of 2.5 - 7.5 kg.

Step 11: Install Part 26

Attach Part 26. Ensure it is installed within the specified adjustment range of 0 - 60 mm.

Step 12: Connect Water/Fluid Lines

Connect the water or fluid lines (Parts 28, 29, 30, 31, 32, 33). Note the thread sizes: 26.4 mm (G 3/4") and 20.9 mm (G 1/2"). Ensure a minimum clearance of 10 mm. The system operates within 0.05 - 1 MPa (0.5 - 10 bar) pressure and a maximum temperature of 60°C. Flow rate is 10 l/min, with a maximum torque of 10 Nm.

Step 13: Final Checks and Testing

⚠️ Important Warnings:

  • Avoid pinching or bending hoses/cables.
  • Ensure all parts are securely braced and aligned.
  • If present, ?️ remove any protective discs (Scheibe entfernen / remove disc / enlever le disque / Eliminar Disco).

? Post-Installation Test:

After installation, check for leaks after one wash cycle (Dichtheit nach einem Spülgang prüfen / Check for leaks after one wash cycle / Vérifiez l’étanchéité après un lavage / Verificar la estanquiedad tras un ciclo de lavado).

Specifications Summary

Parameter Value
Model Number GS 9001 856 986
Product Series GV 44x Voll-I
Estimated Assembly Time 2-3 hours
Hose/Cable Length 1.75 m
Max Height/Length 1.1 m, 725 mm
Weight Capacity 2.5 - 7.5 kg
Clearance Min 70 mm, Max 120 mm (some areas >120 mm)
Adjustment Range 0 - 60 mm
Water Connection Size G 3/4" (26.4 mm), G 1/2" (20.9 mm)
Operating Pressure 0.05 - 1 MPa (0.5 - 10 bar)
Max Operating Temperature 60°C
Flow Rate 10 l/min
Torque Limit Max 10 Nm
Models: SMD6ECX00E Fully Built In Dishwasher 60 Cm, SMD6ECX00E, Fully Built In Dishwasher 60 Cm, Built In Dishwasher 60 Cm, Dishwasher 60 Cm

File Info : application/pdf, 2 Pages, 5.77MB

PDF preview unavailable. Download the PDF instead.

9001856986 A

References

Adobe Illustrator 26.0 (Windows) Adobe PDF library 16.03