Lanberg 19" Wall-Mount Cabinets WF01 64/66 V2 Series

User's Manual

Introduction and Safety Information

1.1 Introduction

This manual contains recommendations, guidelines, safety principles, and operating instructions for Lanberg 19" wall-mount cabinets, specifically the WF01 64/66 V2 series. It covers logistics, technical aspects, and regulations for transport, assembly, usage, and servicing. Please read and adhere to all information before using the device. Keep this manual for future reference. Illustrations are for guidance only. Lanberg reserves the right to make changes to this manual without prior notice. Unauthorized use or reproduction of this manual and its contents is prohibited.

For the most current version of this manual, please visit: www.lanberg.pl

Supported Models: WF01-6404-10B, WF01-6404-10S, WF01-6604-10B, WF01-6604-10S, WF01-6606-00B, WF01-6606-00S, WF01-6606-10B, WF01-6606-10S, WF01-6609-00B, WF01-6609-00S, WF01-6609-10B, WF01-6609-10S, WF01-6406-00B, WF01-6406-00S, WF01-6406-10B, WF01-6406-10S, WF01-6409-00B, WF01-6409-00S, WF01-6409-10B, WF01-6409-10S, WF01-6412-00B, WF01-6412-00S, WF01-6412-10B, WF01-6412-10S, WF01-6612-00B, WF01-6612-00S, WF01-6612-10B, WF01-6612-10S, WF01-6415-10B, WF01-6415-10S, WF01-6615-10B, WF01-6615-10S, WF01-6418-10B, WF01-6418-10S, WF01-6618-10B, WF01-6618-10S, WF01-6422-10B, WF01-6422-10S, WF01-6622-10B, WF01-6622-10S, WF01-6427-10B, WF01-6427-10S, WF01-6627-10B, WF01-6627-10S.

Compliance and Environmental Information

1.2 Legal and Environmental Compliance

This product complies with European Union (EU) safety and environmental regulations. It has obtained CE conformity declaration, signifying compliance with essential requirements and relevant provisions of EU directives and harmonized standards. Specifically, it adheres to RoHS 2011/65/EU + 2015/863/EU and harmonized standards such as IEC 62321 series.

The WEEE symbol ?️ (crossed-out wheelie bin) indicates that this product should not be treated as household waste. Proper disposal helps prevent harm to human health and the environment from potential hazardous substances. Selective collection allows for material and component recovery. Contact your retailer or local authority for recycling information.

Packaging Contents

1.3 Packaging Contents

The transport package should contain the following items:

Necessary mounting accessories (in a separate bag):

1x Bottom cover with cable grommet, 4 side M10 threaded holes, and 2 grounding pins.

General Safety Precautions

1.4 General Safety Precautions

1.5 ESD Safety Guidelines

To prevent damage from electrostatic discharge (ESD), prepare properly and handle components with care:

1.6 Transport

Transport the product only in its original packaging to protect it from shocks and impacts. Do not discard packaging. Use the original carton for warranty shipments.

1.7 Warranty

Warranty is void for failures or defects resulting from improper use or handling not in accordance with this manual. Mechanical damage is grounds for claim rejection. Contact your seller for warranty or guarantee claims.

Unpacking, Storage, and Ventilation

1.8 Unpacking and Examination

Carefully unpack the product in the presence of the carrier and check:

If any items are missing, damaged, or incorrect, document the issue (with photos and description) and report it to the seller on the same day as delivery.

1.9 Storage and Ventilation

Assembly

i Follow the instructions in this manual strictly.

2.1 Preparations

Prepare adequate space for assembly. Carefully remove all components from the transport carton. The following instructions are based on the provided diagrams. You will need your own 4 wall plugs and 4 screws suitable for the cabinet's weight and the wall mounting strip's 10 mm diameter holes.

For attaching the top and bottom covers to the side frames using M6*12 screws, a Phillips head screwdriver (PH3x150 mm recommended) is advised.

2.1.1. Table of Components

ComponentQuantityDesignation
Front door (glazed/metal) with 2 grounding pins1xA
Side frame with doors, equipped with 2 latches2xB/C
Top cover with cable grommet and 2 central openings for 12x12 cm fans1xD
Flat blank panel for top and bottom cable grommet2xE
Rear cabinet cover1xF
Numbered vertical mounting rails4xG
Wall mounting strip1xH
M4*8 self-tapping screw16xI
M5*8 self-tapping screw8xJ
M6*12 screw8xK
M6*12 screw with M6 cage nut< 10U: 12x
>= 10U: 24x
L
Plastic washer for front door1xN
Grounding kit (cable, washers, nuts)1xM
Front door lock with double key set and flat metal tongue1xO
Side door lock with double key set and bent metal tongue2xP
Bottom cover with cable grommet, 4 side M10 threaded holes, and 2 grounding pins1xR

Screw Illustrations:

[Diagram: Illustrations of screws I, J, K, L with quantities]

Cabinet Assembly Steps

[Diagram: Exploded view of cabinet components labeled A through R]

2.2 19" Cabinet Assembly Steps (WF01 V2 Series)

2.2.1. Front Door Lock Installation

  1. Insert the lock module [O] from the bag through the door, ensuring the two parallel flat parts of the module are horizontal.
  2. Position the lock module's opening vertically using the keys.
  3. Screw on the nut, aligning the side with engraved triangles towards the door. Hold the lock module with keys and tighten the nut.
  4. Attach the flat metal lock tongue vertically (upwards if the door faces forward, downwards otherwise) to the square element of the lock module. Place the flat metal round washer, then the star-shaped washer. Secure with the screw.

2.2.2. Side Door Lock Installation

  1. Remove the side doors from the side frames [B + C]. Reinstallation will occur at a later stage.
  2. Insert the lock module [P] from the bag through the door, ensuring the two parallel flat parts are horizontal.
  3. Position the lock module's opening horizontally using the keys.
  4. Screw on the nut, aligning the side with engraved triangles towards the door. Hold the lock module with keys and tighten the nut.
  5. Attach the bent metal lock tongue horizontally (bent part facing the door) to the square element of the lock module. Place the flat metal round washer, then the star-shaped washer. Secure with the screw.
  6. Repeat steps 1-4 for the other side door [C].

2.2.3. Vertical Mounting Rails Installation

i Pay attention to the front and rear sides of the side frames [B + C].

The distance between the centers of the small holes on the side frames [B + C] is 25 mm.

The maximum working depth between the front and rear vertical mounting rails (considering their thickness) is:

It is recommended to install the rear vertical mounting rails on the 3rd holes from the end of the side frames (50 mm difference) to accommodate devices with plugs and cables (approx. 55 mm depth).

  1. Lay two side frames [B + C] flat (without doors attached), with their front sides facing you.
  2. Use two numbered vertical mounting rails [G] and determine the required spacing between them on the left side frame [B].
  3. i Ensure the numbering of the front vertical rails increases from right to left (as shown in diagrams) and similarly for the rear rails.
  4. Use a total of 4 M5*8 self-tapping screws [J] to attach the vertical mounting rails to the side frame (2 screws per end).
  5. Use two numbered vertical mounting rails [G] and determine the same spacing as in step 2 on the right side frame [C].
  6. i Ensure the numbering of the front vertical rails increases from left to right (as shown in diagrams) and similarly for the rear rails.
  7. Use a total of 4 M5*8 self-tapping screws [J] to attach the vertical mounting rails to the side frame (2 screws per end).

[Diagram: Shows side frames with mounting rails being attached, indicating front/rear and numbering.]

2.2.4. Installation of Side Frames with Top and Bottom Cover

  1. Prepare the bottom cover [R] so that the cable grommet faces the rear.
  2. Position the left side frame [B] on the left side of the bottom cover, and the right side frame [C] on the right side.
  3. i Before proceeding, ensure:
  4. I) Rail numbering increases from bottom to top on both front and rear vertical mounting rails.
  5. II) Opposite pairs of rails are mounted at the same height.

[Diagram: Shows bottom cover and side frames being assembled, with numbering indicators.]

  1. Place the top cover [D] with its rear cable grommet onto the side frames [B + C] and align it with their structure.
  2. Use a total of 4 M6*12 screws [K] to attach the top cover to the side frames (2 screws per side).
  3. i Remember to:
  4. I) Systematically check the alignment of the top cover [D] with the holes on the side frames [B + C]. Do not fully tighten screws immediately. Insert all screws to about 2/3 height, check alignment, then tighten fully.
  5. II) Also, check that the small M4*8 screw holes [I] on the front of both covers and side frames align.

[Diagram: Shows top cover being attached to side frames, with detail of screw alignment.]

  1. Rotate the entire structure 180 degrees. Align the bottom cover [R] with the side frame structure.
  2. Use a total of 4 M6*12 screws [K] to attach the bottom cover to the side frames (2 screws per side).

[Diagram: Shows cabinet rotated, bottom cover being attached.]

i Remember to:

  1. Use a total of 4 M4*8 self-tapping screws [I] to attach both covers [D + P] to the side frames [B + C] from the front (1 screw per side).

2.2.5. Rear Cabinet Cover Installation

  1. Align the rear cover [F] so its 6 holes match the 6 holes on the rear of the side frames [B + C].
  2. Use a total of 6 M4*8 screws [I] to attach the rear cover to the side frames (3 screws per side).

[Diagram: Shows rear cover being attached.]

2.2.6. Flat Blank Panels Installation

  1. Align a flat blank panel [E] with the bottom cable grommet opening of the cover, ensuring screw holes align.
  2. Use 2 M4*8 screws [I] to attach the panel (1 screw per side).
  3. Rotate the cabinet structure 180 degrees.
  4. Align the other flat blank panel [E] with the top cable grommet opening, ensuring screw holes align.
  5. Use 2 M4*8 screws [I] to attach this panel (1 screw per side).

[Diagram: Shows blank panels being installed in top and bottom grommets.]

Cabinet Wall Installation

3. Cabinet Wall Installation

[Diagram: Shows wall mounting strip, screws, wall plugs, drill, and spirit level.]

  1. Prepare 4 wall plugs and 4 screws suitable for the cabinet's total weight and the wall mounting strip's 10 mm diameter holes. The distance between the centers of the larger holes on the strip is 69 mm, and between the outer holes is 468 mm.
  2. Align the wall mounting strip [H] with the wall and ensure it is level.
  3. Mark the 4 mounting holes on the strip (excluding the L-shaped brackets).
  4. Drill 4 holes at the marked locations and insert the wall plugs.
  5. Reposition the strip so there is space between its 2 L-shaped brackets and the wall for hanging the cabinet.
  6. Insert 4 screws into the wall plugs: 2 into the outer holes (one on each side) and then 2 into the inner holes.
  7. Hang the assembled cabinet by engaging its 2 rear top holes with the 2 brackets on the strip.
  8. Use 2 M4*8 self-tapping screws [I] to secure the rear of the cabinet to the 2 brackets on the wall mounting strip.

Door Reinstallation

4. Side Door Reinstallation

  1. Reinstall the side doors, which were removed earlier, onto the side frames [B + C]. Push the 2 latches inwards simultaneously until they align with the frame openings, then release.
  2. Use the keys [P] to lock the side doors.

5. Front Door Installation

  1. On one of the bottom holes of the bottom cover [R], where the front door pin [A] will be placed, apply the plastic washer [N].
  2. Insert the bottom pin of the front door [A] into the bottom hole through the plastic washer. Then, insert the top pin into the opening on the top cover [D], pushing the hinges (L-shaped) inwards. Release when aligned with the opening.
  3. Use the keys [O] to lock the front door.

[Diagram: Shows front door hinge installation.]

Grounding

6. Grounding

The cabinet has 4 grounding studs with a 6 mm diameter:

The included grounding cable [M] consists of 42 strands of 100% copper (0.16 mm each), with a cross-section of approximately 0.9 mm². This cable is used to connect the bottom cover to the front door, allowing up to 180° opening.

To connect one of the main cabinet grounding studs (on the bottom cover) to a potential equalization terminal, a separate cable of appropriate length is required. The cable's AWG should be between 17-18, and its strands must be 100% copper.

Models: WF01 64, 66 V2 Series 19 Inch Wall Mount CabinetsWF01 64, 66 V2 Series, 19 Inch Wall Mount Cabinets, Wall Mount Cabinets, Mount Cabinets, Cabinets

File Info : application/pdf, 12 Pages, 3.89MB

PDF preview unavailable. Download the PDF instead.

instrukcja-obslugi-LANBERG-WF01-6406-10S

References

PDFium PDFium

Related Documents

Preview Lanberg 19" Rack Cabinets with Panel LCD GREY User Manual
User manual for Lanberg 19" Rack cabinets with panel LCD GREY, including assembly instructions, safety precautions, and technical specifications.
Preview Lanberg FF01-SL Series Cabinet Technical Specifications
Technical drawing and specifications for the Lanberg FF01-SL series cabinet, including dimensions and depth measurements for rail-to-rail and rail-to-back door configurations.
Preview Lanberg SC01 Series Server Chassis User Manual
Comprehensive user manual for Lanberg SC01 series 19-inch server chassis, covering installation, assembly, safety, and specifications for models SC01-4504-08B, SC01-4504-10B, SC01-5504-08B, and SC01-3504-10B.
Preview Lanberg HDMI Switch SWV-HDMI-0003 / 0005 User Manual
Comprehensive user manual for the Lanberg HDMI Switch (models SWV-HDMI-0003 and SWV-HDMI-0005), detailing features, specifications, installation, and safety precautions. Supports HDMI 2.0b and 4K resolution.
Preview Lanberg Smart WiFi Plug SM01-WP10 User Manual
User manual for the Lanberg Smart WiFi Plug SM01-WP10, detailing setup, features, and troubleshooting for smart home integration.
Preview Lanberg SMART Wi-Fi Power Strip: User Manual and Setup Guide
Comprehensive user manual for the Lanberg SMART Wi-Fi Power Strip (SM01-WPS34), detailing setup, app integration with TuyaSmart, safety precautions, product specifications, and warranty information.
Preview Lanberg Cables, Adapters, and Accessories Catalog 2020
Explore the comprehensive Lanberg catalog for 2020, featuring a wide range of cables, adapters, and related accessories. Discover products for various connectivity needs, including USB, HDMI, DisplayPort, and more.