Then pull the base plate of communication board out . ②. ①. EV-Charger User Manual. 7.2 kW - 22 kW.
26 feb 2022 — - Insert the expansion bolts. - Drill holes with φ 6 drill. - Depth: at least 45 mm. - Align the bracket and the cable hook ...
Installation Steps STEP 1: Remove the screw from the EV-Charger with the cross screwdriver. Then remove the back bracket away carefully. EV-Charger 7.2 kW-22 kW STEP 2: Fix the back bracket and the cable hook (only for type P) to the wall. - Mark the position of the holes. - Drill holes with 6 drill. - Depth: at least 45 mm. - Insert the expansion bolts. - Align the bracket and the cable hook(only for type P) with the holes, and screw the self tapping screws with the cross screwdriver. Packing List EV-Charger EV-Charger User Manual 7.2 kW - 22 kW Copyright Declaration The copyright of this manual belongs to SolaX Power Network Technology (Zhejiang) Co., Ltd. Any corporation or individual should not plagiarize, par tially or fully copy it (including software, etc.), and no reproduction or distribution of it in any form or by any means shall be allowed. All rights reser ved. SolaX Power Network Technology (Zhejiang) Co.,Ltd. reser ves the right of final interpretation. Manual Expansion bolt (3 for type S, 6 for type P) Self tapping screw & Gasket (3 for type S, 6 for type P) EV-Charger 7.2 kW-22 kW Quick Installation Guide European terminal (3 for single phase; 5 for three phase) CT (single phase) CT(three phase) RJ 45 terminal adapter Cable hook(for type P) (torque:1.5~2 N·m) STEP 3: Hang the EV-Charger on the wall for trial, then estimate the required length of input cable (three-core or ve-core, 13-18 mm) and communication cable. After that, take the EV-Charger down. STEP 4: Unscrew the EV-Charger's rear cover with the cross screwdriver and take it down. Then undo the fastening heads and take the waterproof materials away as shown below. STEP 5: Unscrew the countersunk screw of the base plate of communication board with the cross screwdriver. Then pull the base plate of communication board out . Installation Steps STEP 6: Insert the prepared communication cable through the waterproof connector in sequence (If the cable is self-made, also insert the wires into the RJ45 terminals and then use crimping pliers to press them tightly). STEP 7: Strip the outer sheath of the input cable for a length of 70 mm, ensuring all the wires can reach the terminal blocks with a little excessive length. Use the stripping pliers to strip approx. 12 mm of insulation from the end of all the coloured wires as below. Then crimp the European terminal with the wire crimper. STEP 8: Insert the input cable through the waterproof connector in sequence. 12 mm 70 mm strip length L1 L2 L3 70 mm STEP 11: Push the rear cover to appropriate position of the cables and screw the self tapping screws with the cross screwdriver. Then tighten the waterproof fastening head. (torque: 2~2.5 N·m) STEP 12: Hang the EV-Charger up carefully and steady the EV-Charger with the self tapping screw and the cross screwdriver. For type P, connect the charging gun with the EV-Charger and hang the connecting cable on the hook. Outer Sheath STEP 9: Insert the wires into the terminal blocks, then block the terminal with the straight screwdriver. STEP 10: Press the spring upward and push the base plate of communication board in. Then screw the countersunk screw. (torque: 2~2.5 N·m) 4 mm (torque:1~1.2 N·m) (torque:0.8~1.5 N·m) CT Connection Diagram: PV array CT & WiFi Connection Three-phase Inverter WiFi Connection Step 1: Use your smart phone to scan below QR code or search for the keyword "SolaXCloud" in browser to download the Monitoring App. AC breaker other home Load L1 L2 L3 N PE Electricity meter, bidirectional Electrical grid Notice: The arrow on the CT must point at the public grid. L line Public grid electricity CT IOS Google Step 2: Create a new account on the Monitoring App. Step 3: Login and turn to Account page in the app. Then click "Wi-Fi Connection" and follow the instructions to complete the process. -Steay the CT on the public grid. -Insert the other end of the communication cable and the terminal of CT on each side of the adapter. grid EV-Charger NOTE! · Do not place the CT on the N Wire or the PE wire. · Do not place the CT on the N and L wire simultaneously. · Do not place the CT on the non-insulated wires. · When using the three-phase CT, please clip the CT clamps on the corresponding phases. 614.00742.00Corel PDF Engine Version 22.1.1.523