Instruction Manual for luminii models including: PDC-96-24 PDC Pure DC Power Supply, PDC-96-24, PDC Pure DC Power Supply

Install Guides

Power Supplies - Luminii

Leto 11 S – Luminii

install-guides

Linear – Luminii


File Info : application/pdf, 2 Pages, 195.84KB

PDC instructions
PDC Pure DC Power Supply - Installation Instructions
Model PDC-96-24
Please read all instructions prior to installation and keep for future reference! This power supply is to be installed in accordance with Article 450 of the National Electrical Code. The power supply must be installed in a well ventilated area and free from explosive gases and vapors. Proper operation requires the free flow of air. As this power supply is hardwired, it should be installed by a qualified electrician. UL class 2 recognized

REV1.3 03082022
1 / 2

7777 Merrimac Ave Niles, IL 60714 T 224.333.6033 F 224.757.7557 info@luminii.com www.luminii.com

MODELS MAX Load A. Length B . Width C . Depth Net Weight

PDC-96-24 96 watts 8.25" 4.10" 1.56" 2.20 lbs

1

Before installing, check the label and ensure the power supply has

the proper input voltage, output voltage, and wattage for the job.

Check the wire markings to ensure they match the wiring diagram

below. Refer to table above for the maximum loads!

3" min.

3" min.

3" min.

1.1 Power supply can be mounted vertically or horizontally. With a minimum of 3" clearance around power supply to provide proper air circulation.

3

mount

driver housing

2
2.1
screw

cover

screw driver housing

screw

2.1 Remove the three Phillips screws from the top of the driver housing and pull the cover off to expose the driver wires.

mount
3.1 Insert the 120-277 VAC power into the driver housing from the electrical panel. Followed by bringing the 24V DC low voltage wires from the LEDs into the driver housing. In addition, connect the Triac / Phase dimmer at input if applicable. Refer to diagram on page 2 to make all the proper wiring connections.
*LUMINII RESERVES THE RIGHTS TO CHANGE SPECIFICATION & INSTRUCTION WITHOUT NOTICE

PDC Pure DC Power Supply - Installation Instructions
Model PDC-96-24
Please read all instructions prior to installation and keep for future reference! This power supply is to be installed in accordance with Article 450 of the National Electrical Code. The power supply must be installed in a well ventilated area and free from explosive gases and vapors. Proper operation requires the free flow of air. As this power supply is hardwired, it should be installed by a qualified electrician. UL class 2 recognized

REV1.3 03082022
2 / 2

7777 Merrimac Ave Niles, IL 60714 T 224.333.6033 F 224.757.7557 info@luminii.com www.luminii.com

4

NOTE: This unit needs to perform load calibration when use for the first time or load changed. Please run the unit with dimmer

at max level for 10 seconds. During load calibration, output of the unit will delay for 2 - 3 seconds.

Neutral Live

+

Ground

Triac / Phase dimmer

-

(if applicable)

5

5.1 Insert the wire nut connections in the driver housing and close housing cover. Secure by tightening the three screws.

*LUMINII RESERVES THE RIGHTS TO CHANGE SPECIFICATION & INSTRUCTION WITHOUT NOTICE



References

Adobe PDF Library 16.0.5 Adobe InDesign 17.1 (Windows)