Installation Guide for BELL Lighting models including: 09066V2 Spectrum Emergency 6 in 1 Exit Blade, 09066V2, Spectrum Emergency 6 in 1 Exit Blade, Emergency 6 in 1 Exit Blade, in 1 Exit Blade, Exit Blade, Blade
Installation Instructions: 09066V2 Important Information We recommend that luminaires are installed by a qualifi ed electrician ensuring the installation complies
09067V2 - Reversible Left & Right Legend for the 6 in 1 Emergency Exit Blade V2 - BELL Lighting
09068V2 - Down Legend for the 6 in 1 Emergency Exit Blade V2 - BELL Lighting
File Info : application/pdf, 3 Pages, 3.39MB
DocumentDocumentInstallation Instructions: 09066V2 unit:mm Read these instructions before installation and retain for future reference 262 Date 1.3.2024 26.2 Revision 1 In di ca to r Test This equipment should be installed by a competent electrician Test button Important Information Installation We recommend that luminaires are installed by a qualified electrician ensuring the installation complies with current IEE wiring regulations BS7671:2018 & local building control. · All tests should be carried out in accordance to EN 50172:2004. · BELL will not accept responsibility for any claims arising from poor installation. 1. Ensure the AC supply is switched off. 2. Separate the base from the LED head. 3. Insert AC supply wires into the connector, as sIhDteiomweCnosndioebnsy the arrPoEwT . Embedded Connections AC:L BS Sling N CN2 Wall mounting Battery 4. Insert the plug with the AC supply wires into the socket on the LED head as sMhDo-CHwANnGEbR-1y0Cthe aErRrDoV-wPJ2. IDteimeCnosMdiDoT-eCensHstANJGPE7R-10A PET Line 5. Select the product mode using the Dial SwitAcchIcmea(sSgseTosr/ieBsS' ). 6. Push the switch to the left to switch the product mode to Self-test mode (ST). AC:L Length:1.5m N CN2 ST BS Dial switch ST Accessories' Battery Images Test Line 7. Push the switch to the right to switch thIeDteimperConosddiouencs t mode PtoETBasic (Manual)Emmboeddede(dBS). Sling Wall mounting · The light source of this luminaire is not replaceable, when the light source reaches end of life, the whole luminaire must be replaced. Important User Advice unit:mm · The ambient room temperature s2h62ould not 26.2 8. For Maintained operation, ensure then shorting plug is connected to the CN2 MD-CHANcGoERn-1n0CectorE.RDV-PJ2 9. For Non-maintained operation, removAecctehsesosriheso' rting plug from the CN2 connector. Images 10. Insert the battery ensuring correct polarity. Length:1.5m In di ca to r Test MD-CHANGER-10A exceed 35°C. · Ensure that there is adequate free air ventilation around the fitting. Recess Mounted unit:mm 1. Once the Ac su2p62ply plug is co2n6n.2ected, push together the base and LED IndicatorTest head. Test button Mounting Options 2. Clip the base/LED head into the recess unit. 32 282 1 · Always switch off mains supply before installing. unit:mm 262 26.2 Specification Connections 1. Supply Voltage: 220-240VAC 5A0C/:NL60Hz CN2 BS 2. Ambient Room Temperature: 0 to 35°C 3. Insulation Class: II Test JP7 Line 4. Ingress Protection: IP20 AC:L N CN2 ST BS Dial switch 5. 6 in 1 instalClaotnionnecmtioodnseSTs 6. Dimensions (LxDxWAC)::L 262x173CxN226mm N Test Line Battery 7. Battery ReBcSharge Time: 24 hours 8. Wattage: 1W Test JP7 Line 9. 10. EBmatteerrgyeinncsytadlluerda:tLiAoiCFn:NLe:PmOo4re3.t2hCVaNn62 S0D3Tia0lhsmwoBitScuAhrhs Ba tte ry ST 11. Visual Distance: 25m Test Line 3. Push the recess unit clips upwards and insert into the ceiling, hole size 282x32mm Test button In di ca to r Test Battery Battery Ceiling MCoounnnetecdtioTnesst button Mounting Options 1. Using the waAllCp:Llugs andCsNc2rews proviBdaettedry, affix the base to the ceiling. 2. Once the AC suNpply plug is connected, push the LED head into the base. BS Test JP7 Line AC:L N CN2 ST BS Dial switch Battery 1.2 SuspenSsTion Mounted Test Line 1. Slide the suspension cables into the base. 3 Ceiling Mounted 4 2. Using the wall plugs and screws provided, affix the suspension cables to the ceiling. 3. Once the AC supply plug is connected, push the LED head into the base. 2 Mounting Options 3 32 282 1 2 3 3 1.2 4 12. Deep Discharge Protection DDP 13. Maintained or Non-maintained Operation 3 1.2 4 Embedded MD-CHANGER-10C Ceiling Mounted Sling ERDV-PJ2 Length:1.5m 32 Technical Helpline +44 (0)1924 893380 www.belllighting.co.uk British Electric Lamps Ltd BELL House, Foxbridge Way, Normanton Industrial Estate Normanton, West Yorkshire. WF6 1TN T: +44 (0)1924 893380 F: +44 (0)1924 894320 E: sales@belllighting.co.uk www.belllighting.co.uk Connections AC:L N BS AC:L N ST CN2 Battery Test JP7 Line CN2 ST BS Dial switch Battery Test Line Installation Instructions: 09066V2 Read these instructions before installation and retain for future reference This equipment should be installed by a competent electrician Perpendicular Mounted 1. Slide the triangular wall mount onto one end of the base. 2. Feed the AC supply wires through the wall mount, and using the wall plugs and screws provided, affix the mount to the wall. 3 1.2 4 3. Once the AC supply plug is connected, push the LED head into the base. Parallel Mounted 1. Slide the triangular wall mounts onto both ends of the base. 2. Using the wall plugs and screws provided, affix the mounts to the wall. 3. Once the AC supply plug is connected, push the LED head into the base. 3 Date 1.3.2024 Revision 1 Wall Mounted 1. Slide the triangular wall mount onto the centre of the base. 2. Using the wall plugs and screws provided, affix the mount to the wall. 3. Once the AC supply plug is connected, push the LED head into the base B AT T E RY Light Guide Mounting 1. Slide the light guide plate into the LED head. 2. Remove the protective film from the PET directional film. BATTERY 3. Adhere the PET directional film onto the light guide plate L N Technical Helpline +44 (0)1924 893380 Test Switch In di ca tor www.belllighting.co.uk -+ B AT T E RY BATTERY B AT T E RY BATTERY Emergency lamps1 Emergency lamps2 L N Test Switch In di ca tor Emergency lamps1 Emergency lamps2 -+ L N Test Switch In di ca tor British Electric Lamps Ltd BELL House, Foxbridge Way, Normanton Industrial Estate Emergency lamps1 Emergency lamps2 Normanton, West Yorkshire. WF6 1TN -+ T: +44 (0)1924 893380 F: +44 (0)1924 894320 E: sales@belllighting.co.uk www.belllighting.co.uk Installation Instructions: 09066V2 Read these instructions before installation and retain for future reference This equipment should be installed by a competent electrician Functionality of the test switch · A short press (1s) on the button starts a function test lasting 5 seconds. · Holding down the button (>10s) resets the timer (System reset) Functional test Self-test Mode · The functional test lasts for 5 seconds and occurs every 7 days, to check the functionality of the emergency unit, the batteries and LED module. Duration test Self-test Mode · 24 hours after installation, a 3-hour duration test is performed. · 3 hour duration tests are performed every 180 - 182 days to check the battery capacity. · The indicator will be slow flashing Green for 5 days once the duration test has been carried out successfully. Indicator LED System status is by the bi-colour indicator LED. LED Indication Permanent Green Fast flashing Green (0 .25s on 0 .25s off) Slow flashing Green (1s on 1s off) Permanent Red Fast flashing Red (0 .25s on 0 .25s off) Slow flashing Red (1s on 1s off) Green and Red off Status Standby, System OK Function test underway Duration test underway Lamp failure Battery capacity failure Battery fault Battery Operation Description Mains operation, battery is charged Function test underway Duration test underway Open Circuit or Short circuit or LED failure Battery failed duration test Incorrect battery voltage or Short circuit or OpenCircuit Emergency mode: Mains disconnected or Mains failure Please note: · Fault status: If an error is detected, the indicator LED switches to RED. Once the error has been corrected, afteruren-itc:monmnecting the battery with the mains power disconnected, the indicator LED will switch back to GREEN when mains power is re-applied . 97.8 · Battery failed duration test: After an exchange of the battery and holding down the button (>10S) to reset the timer, the indicator LED will switch to GREEN unit:mm 97.8 · Always select the desired test mode before applying the power. Do not switch test mode whilst the lu9m7.i8naire is powered. · If Self-test mode is selected, additional Manual tests are not required and if performed, will cause premature failure of the battery. Date 1.3.2024 Revision 1 97.8 This product may contain substances that can be hazardous to the environment if not disposed of properly. Electrical and electronic equipment should never be disposed of with genera9l7h.8ousehold waste but must be separated for its correct treatment and recovery. Where possible recycle your packaging. 97.8 LED IP20 LED IP20 LiFePO4 97.8 97.8 Connections LiFePO4 Connections Technical Helpline +44 (0)1924 893380 www.belllighting.co.uk British Electric Lamps Ltd BELL House, Foxbridge Way, Normanton Industrial Estate Normanton, West Yorkshire. WF6 1TN T: +44 (0)1924 893380 F: +44 (0)1924 894320 E: sales@belllighting.co.uk www.belllighting.co.uk