Installation Guide for QuickBOLT models including: 17963, 17660, 17963 17660 Black Split Top QB2, 17963 17660, Black Split Top QB2, Split Top QB2, Top QB2, QB2
QuickBOLT 17963 4-inch Multi Roof Mount QB2 Kit w/ 4-inch Microflashing & Black Split Top Stainless Steel Low Profile L-Foot
AHJ CONDENSED PERMIT PACKAGE 2024 Version 5 17963 17660 BLACK SPLIT TOP QB2 WITH 4" MICROFLASHING® FOR ASPHALT, EPDM, & TPO ROOFS PATENT # 8448407 A DIVISION OF QUICKSCREWS INTERNATIONAL CORP INSTALL INSTRUCTIONS QB2 (17962) 1 RECOMMENDED MATERIALS · Tools to locate and mark rafter · Drill with a 15/64" drill bit · MFG approved sealant (optional) 2 · 1/2" Nut Setter INSTALLATION INSTRUCTIONS 1. Locate and mark the rafter 2. Predrill the hole 3 3. Optional: Fill the predrilled hole with MFG approved sealant 4. Optional: Place a ring of sealant around the bottom of the Microflashing® washer 5. Place the Microflashing® 6. Insert the Bolt into the L-Foot 7. Drive the Bolt until the Microflashing® is compressed 4 To compress Microflashing® properly with QB2 use a 150 minimum torque lbs/inch The Bolt will compress the Microflashing® and when fully compressed the L-Foot will not rotate. 5 6 7 7Adobe InDesign 19.4 (Macintosh) Adobe PDF Library 17.0