Installation Guide for QuickBOLT models including: 17963, 17660, 17963 17660 Black Split Top QB2, 17963 17660, Black Split Top QB2, Split Top QB2, Top QB2, QB2

View Installation Manual

QuickBOLT 17963 4-inch Multi Roof Mount QB2 Kit w/ 4-inch Microflashing & Black Split Top Stainless Steel Low Profile L-Foot

PDF preview unavailable. Download the PDF instead.

17963 Installation Manual
AHJ CONDENSED PERMIT PACKAGE 2024

Version 5

17963 17660
BLACK SPLIT TOP QB2 WITH 4" MICROFLASHING®
FOR ASPHALT, EPDM, & TPO ROOFS
PATENT # 8448407

A DIVISION OF QUICKSCREWS INTERNATIONAL CORP

INSTALL INSTRUCTIONS

QB2 (17962)

1
RECOMMENDED MATERIALS

· Tools to locate and mark rafter

· Drill with a 15/64" drill bit

· MFG approved sealant (optional)

2

· 1/2" Nut Setter

INSTALLATION INSTRUCTIONS

1. Locate and mark the rafter

2. Predrill the hole

3

3. Optional: Fill the predrilled hole with MFG approved sealant 4. Optional: Place a ring of sealant around the bottom of the

Microflashing® washer

5. Place the Microflashing®

6. Insert the Bolt into the L-Foot

7. Drive the Bolt until the Microflashing® is compressed

4

To compress Microflashing® properly with QB2 use a 150 minimum torque lbs/inch

The Bolt will compress the Microflashing® and when fully compressed the L-Foot will not rotate.
5

6

7
7


Adobe InDesign 19.4 (Macintosh) Adobe PDF Library 17.0