Instruction Manual for ELTEC models including: CYBOX AP 3, CYBOX RT 3, Wireless Access Point 5G LTE Router

CYBOX AP 3 - westermo.net.au

II CYBOX AP 3 | CYBOX RT 3 L L es LIST OF CHANGES ISSUE CHANGE DESCRIPTION DATE 1.0 Initial Release 2021-03-30 1.1 Chapter correction 2021-03-31

CYBOX AP 3


File Info : application/pdf, 19 Pages, 929.39KB

PDF preview unavailable. Download the PDF instead.

CyBox AP3 RT3 Installation-Manual en
es
CYBOX AP 3
WIRELESS ACCESS POINT
CYBOX RT 3
5G | LTE ROUTER
INSTALLATION MANUAL
Revision: 1.3 | Date: 10.05.2021

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

LIST OF CHANGES

ISSUE 1.0 1.1 1.2 1.3

CHANGE DESCRIPTION Initial Release Chapter correction Mechanical drawing correction Adaption of safety information and chapter mounting

DATE 2021-03-30 2021-03-31 2021-04-27 2021-05-10

II

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

DISCLAIMER
Copyright © 2021 ELTEC Elektronik AG. The information, data, and figures in this document including respective references have been verified and found to be legitimate. In particular in the event of error they may, therefore, be changed at any time without prior notice. The complete risk inherent in the utilization of this document or in the results of its utilization shall be with the user; to this end, ELTEC Elektronik AG shall not accept any liability. Regardless of the applicability of respective copyrights, no portion of this document shall be copied, forwarded or stored in a data reception system or entered into such systems without the express prior written consent of ELTEC Elektronik AG, regardless of how such acts are performed and what system is used (electronic, mechanic, photocopying, recording, etc.). All product and company names are registered trademarks of the respective companies. Our General Business, Delivery, Offer, and Payment Terms and Conditions shall otherwise apply.
SAFETY INFORMATION
Electrical safety
WARNING The device can be operated with voltages over 75 V DC. Incorrect handling risks causing a fatal electrical shock.
Before connecting the power supply, connect the device to protective earth.
General advice  Only qualified personnel is allowed to install, operate and maintain the devices.  Please take safety precautions against electrostatic discharge (ESD).  Access to the devices may only be granted to qualified personnel.  To prevent the risk of electric shock, turn off the external power supply and remove the power
supply cable from the electrical outlet before handling or disassembling the system.  When adding or removing devices to or from the system, ensure that the power cables for the
devices are unplugged before the signal cables are connected.  Make sure that your power supply is set to the correct voltage in your area. If you are not sure about
the voltage of the electrical outlet you are using, contact your local power company.  If the power supply is broken, do not try to fix it by yourself. Contact a qualified service technician or
your retailer.

III

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

Operation safety

WARNING The device can become very hot during operation (> 80 ° C). Make sure it is protected from accidental contact. The device must be installed so that it is not accessible to children.

To prevent burns, switch off the device and allow to cool down for half an hour before disassembling or working on it.

 Before installing the device and connecting cables to it, carefully read the related manuals.  Before using the device, make sure all cables are correctly connected and the power cables are not
damaged. If you detect any damage, contact your dealer immediately.  Avoid dust, humidity, and temperature extremes. Do not place the product in any area where it may
become wet.  Place the product on a stable surface.  If you encounter technical problems with the product, contact a qualified service technician or your
retailer.
Radio Frequency Exposure Statement At least 20 cm separation distance between the antenna and the user's body must be maintained at all times.

RECYCLING
Please recycle packaging environmentally friendly: Packaging materials are recyclable. Please do not dispose packaging into domestic waste but recycle it.

Please recycle old or redundant devices environmentally friendly:
Old devices contain valuable recyclable materials that should be reutilized. Therefore please dispose old devices at collection points which are suitable.

EU DECLARATION OF CONFORMITY
ELTEC Elektronik AG herewith declares that the device is compliant to the basic requirements of the directive 2014/53/EU. The full text of the EU declaration of conformity is available in the Download Center at www.eltec.com.

IV

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

CONTACT
ELTEC Elektronik AG Galileo-Galilei-Straße 11 55129 Mainz Germany

Fon Fax Email www

+49 6131 918 100 +49 6131 918 195 info@eltec.com www.eltec.com

es

V

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

CONTENTS

1 ABOUT THIS DOCUMENT

1

2 OVERVIEW

2

2.1 Products

2

3 HARDWARE

3

3.1 Device Connectors

3

3.1.1 Power Supply Connectors

3

3.1.2 Ethernet Interfaces

3

3.1.3 Antenna Connectors

4

3.2 Power Supply

5

3.2.1 Power Input

5

3.2.2 Power over Ethernet (PoE+)

5

3.3 M12 Service Interface (USB and Serial Port)

5

3.4 Front Panel and Module-to-Antenna Connections

6

3.4.1 Assignment Front Panel Labelling ­ Software

6

3.5 LED Indicators

7

3.5.1 Power LED Status

7

3.5.2 Fail LED Status

7

3.5.3 Module 1 LED Status

7

3.5.4 Module 2 LED Status

7

3.5.5 LAN LED (100 M | 1000 M) Status

8

3.6 Reset Switch

8

3.7 SIM Cards

8

4 MOUNTING 4.1 Connecting an Earthing Cable

10 Fehler! Textmarke nicht definiert.

4.2 Electrical Connection

Fehler! Textmarke nicht definiert.

VI

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

LIST OF TABLES

Table 1 Pin Assignment of Power Supply Connector (PWR)

3

Table 2 Pin Assignment of M12 Ethernet Connectors (LAN1/2)

3

Table 3 Pin Assignment of M12 Service Connector

5

Table 4 Overview Front Panel Antenna Description

6

Table 5 Power LED Status

7

Table 6 Fail LED Status

7

Table 7 Module 1 LED Status

7

Table 8 Module 2 LED Status

7

Table 9 LAN LED Status

8

Table 10 Reset Switch Behavior

8

VII

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

LIST OF FIGURES

Figure 1 Picture of CyBox AP 3-W

2

Figure 2 Picture of CyBox RT 3-W

2

Figure 3 Front Panel Overview

6

Figure 4 SIM Slot Assignment per Modem of the CyBox RT 3

9

Figure 5 Dimensions of the CyBox AP 3 and CyBox RT 3 HousingFehler! Textmarke nicht definiert.

Figure 6 Earth Cable Mounting on Earth Stud

Fehler! Textmarke nicht definiert.

VIII

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

1 ABOUT THIS DOCUMENT
This installation manual is intended only for system developers and integrators; it is not intended for end users.
It describes the hardware functions of the product, connection of peripheral devices and integration into a system. Additional information on special applications and the configuration of the product is available in a separate configuration manual which can be downloaded from the Download Center at www.eltec.com.

1

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

2 OVERVIEW
2.1 PRODUCTS
This installation manual comprises all information to set-up the following products.

Figure 1 Picture of CyBox AP 3-W

Figure 2 Picture of CyBox RT 3-W

2

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

3 HARDWARE
3.1 DEVICE CONNECTORS
3.1.1 POWER SUPPLY CONNECTORS The electrical power can be supplied to the device using the A-coded M12 power connector, labeled PWR. Table 1 shows the pin-assignment of the power supply connector.

PIN

SIGNAL NAME DESCRIPTION

1

+VIN

Supply voltage, positive terminal

2

+VIN

Supply voltage, positive terminal

3

-VIN

Supply voltage, negative terminal

4

-VIN

Supply voltage, negative terminal

Table 1 Pin Assignment of Power Supply Connector (PWR)

3.1.2 ETHERNET INTERFACES
The two LAN-ports of the CyBox AP 3 and CyBox RT 3 are utilizing M12 X-coded conncetors with the pinassignment as shown in Table 2. Mating connectors are available from several manufacturers.

PIN

1

2

8 1

3

7

2

4

6

3

54

5

6

7

8

SIGNAL NAME D1+ D1D2+ D2D4+ D4D3D3+

DESCRIPTION First data line plus First data line minus Second data line plus Second data line minus Fourth data line plus Fourth data line minus Third data line minus Third data line plus

Table 2 Pin Assignment of M12 Ethernet Connectors (LAN1/2)

3

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

3.1.3 ANTENNA CONNECTORS The QLS antenna connectors are located at the bottom part of the front panel. Besides the GNSS connector each radio interface connector is labeled from A1 to A4. Their functionalities depend on the CyBox model (see 3.4.1 Assignment Front Panel Labelling ­ Software).
When connecting an antenna to the QLS connector, make sure that you hear a `click' sound confirming proper mounting. To remove an antenna, it has to be gently pulled from the basis of the connector with one hand, while the other hand is holding the antenna. Alternatively, a screwdriver can be used as a lever arm at the basis of the antenna to facilitate the removal, as illustrated below.

STEP 1
Place the screwdriver between the connector and the access point

STEP 2
Rotate and/or push the screwdriver while pulling the antenna

4

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

3.2 POWER SUPPLY
3.2.1 POWER INPUT The CyBox AP 3 and CyBox RT 3 can be powered by a DC power source connected to the internal power supply and I/O connector, shown in Table 1 . The nominal input voltage can vary between 24 V and 110 VDC.
3.2.2 POWER OVER ETHERNET (POE+) The CyBox AP 3 and CyBox RT 3 are designed to be supplied via the Ethernet uplink, as class 4 powered device, according to IEEE 802.3at. In this case the supply voltage is provided remotely over the injector. Important: The Power-over-Ethernet option is applicable on certain devices only.

3.3 M12 SERVICE INTERFACE (USB AND SERIAL PORT)
The CyBox AP 3 and CyBox RT 3 are equipped with a USB and serial port. The USB port can be used to attach a memory device to update the firmware or to configure the device. Note that the USB port is a dedicated maintenance port. It is not designed to be used while the device is in operation inside rolling stock equipment. Table 3 shows the pin-assignment of the service connector.

PIN

1

2

8 1

3

7

6

24

5

3 4

5

6

7

8

SIGNAL NAME USB-VCC USB-DUSB-D+ USB-GND n.c. RS323-TX RS232-RX RS232-GND

Table 3 Pin Assignment of M12 Service Connector

DESCRIPTION USB positive power supply voltage USB negative data line USB positive data line USB negative power supply voltage Not connected Console port transmit data Console port receive data Console port ground

5

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

3.4 FRONT PANEL AND MODULE-TO-ANTENNA CONNECTIONS
The figure below provides an overview of the front panel.

Figure 3 Front Panel Overview

3.4.1 ASSIGNMENT FRONT PANEL LABELLING ­ SOFTWARE  The ports and LEDs "LAN 1" and "LAN 2" correspond respectively to the interfaces "eth0" and "eth1"  The LEDs "Module 1" and "Module 2" refer to WLAN and/or 5G/LTE modules  WLAN modules are called "radio" within the software  5G/LTE modules are called "modem" within the software
 The purpose of the antennas depends on the modules inserted in your Cybox model

CYBOX MODELS
Single WLAN Dual WLAN
5G/LTE + WLAN
Single 5G/LTE Dual 5G/LTE

LED  SOFTWARE CORRELATION
Module 1  Radio 0
Module 1  Radio 0 Module 2  Radio 1 Module 1  Modem 0 Module 2  Radio 0 Module 1  Modem 0
Module 1  Modem 0 Module 2  Modem 0

A1
WLAN0 ant. 1
WLAN0 ant. 1
5G/LTE0 ant. 1
5G/LTE0 ant. 1
5G/LTE0 ant. 1

A2
WLAN0 ant. 2
WLAN0 ant. 2
5G/LTE0 ant. 2
5G/LTE0 ant. 2
5G/LTE0 ant. 2

A3
WLAN0 ant. 3
WLAN0 ant. 3
5G/LTE0 ant. 3
5G/LTE0 ant. 3
5G/LTE0 ant. 3

ANTENNAS

A4

A5

WLAN0 not ant. 4 used

WLAN0 WLAN1 ant. 4 ant. 1

5G/LTE0 WLAN0 ant. 4 ant. 1

5G/LTE0 not ant. 4 used

5G/LTE0 5G/LTE1 ant. 4 ant. 1

A6
not used
WLAN1 ant. 2
WLAN0 ant. 2
not used
5G/LTE1 ant. 2

A7
not used
WLAN1 ant. 3
WLAN0 ant. 3
not used
5G/LTE1 ant. 3

A8
not used
WLAN1 ant. 4
WLAN0 ant. 4
not used
5G/LTE1 ant. 4

Table 4 Overview Front Panel Antenna Description

6

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

3.5 LED INDICATORS
The LEDs on the front panel of CyBox AP 3 and CyBox RT 3 provide quick indication of the device status.

3.5.1 POWER LED STATUS

LED COLOR Green Green

STATE On Off

Table 5 Power LED Status

DESCRIPTION Device is receiving correct input power Device is not powered

3.5.2 FAIL LED STATUS

LED COLOR Green Green Green Green Red Red

STATE On Off Blink Toggle G/R On Off

Table 6 Fail LED Status

DESCRIPTION Normal operation Device is booting | self-testing Device is resetting to factory settings Emergency system booted Software | Configuration error Normal operation

3.5.3 MODULE 1 LED STATUS

LED COLOR Green Green Green

STATE On Blink Off

Table 7 Module 1 LED Status

DESCRIPTION Indicates module 1 is in use Indicates data transfer on module 1 Indicates module 1 is inactive

3.5.4 MODULE 2 LED STATUS

LED COLOR Green Green Green

STATE On Blink Off

Table 8 Module 2 LED Status

DESCRIPTION Indicates module 2 is in use Indicates data transfer on module 2 Indicates module 2 is inactive

7

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

3.5.5 LAN LED (100 M | 1000 M) STATUS

LED COLOR Green Green Green

STATE On Blink Off

DESCRIPTION 100 Mbit/s (resp. 1000 Mbit/s) link established Indicates 100 Mbit/s (resp. 1000 Mbit/s) data transfer No 100 Mbit/s (resp. 1000 Mbit/s) link

Table 9 LAN LED Status

3.6 RESET SWITCH
The CyBox AP 3 and CyBox RT 3 is equipped with a hidden reset switch behind the front panel, close to the top-right corner. The button is accessible with a straightened paper clip pushed through the little hole on the front panel. The effect of pressing the reset switch depends on the duration of its activation, as indicated in Table 10 below. The timing behavior is only valid, if the device has completly booted (after approx. 1 min). While the device is booting or executing U-Boot, pushing the button will always reset the device.
The following table describes the functions of the reset switch.

HOLD TIME < 2 seconds 2-5 seconds > 5 seconds

FAIL LED BEHAVIOR Off Off Green blinking

ACTION Reset after release No action Remove custom configuration then reset

Table 10 Reset Switch Behavior

3.7 SIM CARDS

The Cybox RT 3 provides 4 SIM slots per 5G/LTE modem. Only one slot per modem can be active at any time. To install SIM cards, the back panel of the CyBox RT 3 has to be removed using a suitable torx 10 screwdriver. After installing the SIM cards, the back panel must be closed and the screws tightened to a maximum torque of 0.55 Nm. The indexing of SIM slots is software dependent and can be selected via an SNMP command or using the web interface.

Note:

Switching between SIM slots takes about 30 seconds, slot 1 being preselected at power up. If you plan to use only one SIM card for a given 5G/LTE modem, it is advisable to use slot 1 to avoid slot switching delay during the boot phase.

8

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

The drawing in Figure 4 shows the SIM slot assignment per modem.

Figure 4 SIM Slot Assignment per Modem of the CyBox RT 3

Important:

Do not change the SIM cards when the device is powered since there is a danger of touching the main voltage when the device is open.

9

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

4 MOUNTING
When mounting the CyBox AP 3 and CyBox RT 3, please take into account the following aspects:  Do not install the device close to any sources of heat, such as radiators or heat registers.  Keep the device away from any liquids and avoid exposure to dripping or splashing. The protection
class of the housing is IP40.  Keep a free space of at least 150 mm around the housing to ensure adequate heat dissipation
capabilities.  For optimal heat dissipation, the connectors should face down.  The housing provides four mounting cutouts to install the device in horizontal or vertical orientation
on a flat and stable surface.  For fixation use M6 screws of sufficient length with additional M6 washers.
The drawing in Figure 5 shows the outer dimensions of the housing, including the position of the mounting cutouts.

Distance of mounting points: > W + washer diameter

Figure 5 Dimensions of the CyBox AP 3 and CyBox RT 3 Housing 10

INSTALLATION MANUAL

CYBOX AP 3 | CYBOX RT 3

es

4.1 CONNECTING AN EARTHING CABLE
A M6 earthing stud on the front panel of the device (also refer to Figure 3) for protective earth connection is essential for the device security. Carry out the following steps to connect an earthing cable:
 Use an earthing cable with a cross-section of at least 2.5 mm² and a wire end sleeve with eyelet suitable for a 6 mm threaded bolt.
 Mount the earth cable as shown in Figure 6.  Fasten the cable by tightening the nut to the required torque (recommended according to EN60947-
1 are 3 Nm).

Figure 6 Earth Cable Mounting on Earth Stud
4.2 ELECTRICAL CONNECTION
1. Make sure the device is properly grounded. 2. Establish a connection to the network by plugging a M12 patch cable to one of the front panel M12
connectors. Each LAN port may be used, if the access point is supplied by a local power supply through the power supply connector. When using PoE+, the connector labeled LAN1 must be used. 3. Connect the desired number of antennas to the device. Each radio/modem can use up to four antennas for maximal performance. 4. In case of using a local power supply, the appropriate wiring (see Table 1 ) must be established to connect the power line to the device. 5. Make sure that the voltage of the power supply conforms to the voltage on the type plate. 6. Ensure that the power supply is grounded correctly and that the power cable is intact and undamaged. Do not switch on the system if there are damages on the power cable or plug. 7. Use power cables which are approved for the power supply in your country. 8. The device itself has no on/off switch, it starts as soon as it is supplied with power.
11


Microsoft Word 2013 Microsoft Word 2013