SUN2000-(50KTL-JPM0, 50KTL-JPM1, 63KTL-JPM0) Quick Guide

Issue: 05

Part Number: 31500ADX

Date: 2021-09-14

NOTICE

The information in this document is subject to change without notice. Every effort has been made in the preparation of this document to ensure accuracy of the contents, but all statements, information, and recommendations in this document do not constitute a warranty of any kind, express or implied.

1 Product Overview

Front View

(1) PV connection indicator

(2) Grid-tied indicator

(3) Communication indicator

(4) Alarm/Maintenance indicator

(5) Maintenance compartment door

(6) Host panel cover

Indicator Description

Indicator Status Description
PV connection indicator Steady green At least one PV string is properly connected, and the DC input voltage of the corresponding MPPT circuit is higher than or equal to 200 V.
Off The SUN2000 disconnects from all PV strings, or the DC input voltage of each MPPT circuit is less than 200 V.
Grid-tied indicator Steady green The SUN2000 has connected to the power grid.
Off The SUN2000 does not connect to the power grid.
Communication indicator Blinking green (on for 0.2s and then off for 0.2s) The SUN2000 receives data over RS485 communication.
Off The SUN2000 has not received data over RS485 communication for 10 seconds.
Alarm/Maintenance indicator Blinking red at long intervals (on for 1s and then off for 4s) A warning alarm is generated.
Blinking red at short intervals (on for 0.5s and then off for 0.5s) A minor alarm is generated.
Steady red A major alarm is generated.
Blinking green at long intervals (on for 1s and then off for 1s) Local maintenance is in progress.
Blinking green at short intervals (on for 0.125s and then off for 0.125s) Local maintenance fails.
Steady green Local maintenance succeeds.

Ports

The diagram shows the ports on the SUN2000 unit. The ports are numbered 1 through 8.

(1) Cable gland (COM1, COM2, and COM3)

(2) DC switch 1 (DC SWITCH 1)

(3) DC input terminals (controlled by DC SWITCH 1)

(4) DC input terminals (controlled by DC SWITCH 2)

(5) DC switch 2 (DC SWITCH 2)

(6) Cable gland (AC OUTPUT)

(7) Cable gland (RESERVE)

(8) USB port (USB)

SUN2000 Dimensions

The dimensions of the SUN2000 unit are approximately 1075 mm x 555 mm x 300 mm.

Mounting Bracket Dimensions

The mounting bracket has dimensions of approximately 890 mm in width, with specific hole placements indicated for mounting.

2 Installation Requirements

2.1 Installation Angle

The device should be installed at an angle not exceeding 15 degrees.

2.2 Installation Space

Maintain a minimum clearance of 300 mm around the device. Specifically, a clearance of at least 1000 mm is required above the device, and at least 200 mm below the device. For ease of installation and maintenance, it is recommended that the bottom clearance be between 300 mm and 730 mm.

3 Installing the SUN2000

NOTE:

The installation process involves attaching the mounting bracket, securing the SUN2000 unit to the bracket using M12 bolts (45 N·m torque), and then securing the unit with M6 bolts (5 N·m torque).

NOTE: You are advised to apply anti-rust paint on the hole positions for protection.

4 Installing Cables

4.1 Installation Preparations

NOTE:

No. Name Model/Specifications Description
1 Ground cable 16 mm² outdoor copper cable If you connect the ground cable to the ground point on the enclosure, prepare the ground cable. If you connect the ground cable to the ground point on the enclosure, use a three-core cable (U, V, and W). If you connect the ground cable to the ground point in the maintenance compartment, use a four-core cable (U, V, W, and PE). There is no need to prepare the ground cable.
2 AC output power cable 38 mm² outdoor copper cable When using outdoor copper cables for AC connection, select copper wiring terminals. For requirements on the cables and terminals of other materials, see the user manual.
3 OT terminal M8 N/A
4 DC input power cable PV cable that meets the 1100 V standard N/A
5 RS485 communications cable (terminal block) Communications cable with a conductor cross-sectional area of 1 mm² and outer diameter of 14-18 mm A terminal block is recommended for connecting the RS485 communications cable.
5 RS485 communications cable (RJ45 network port) CAT 5E outdoor shielded network cable with an outer diameter less than 9 mm and internal resistance not greater than 1.5 ohms/10 m, as well as shielded RJ45 connectors N/A
6 Cable tie N/A N/A

4.2 Installing the Ground Cable

NOTE:

The ground cable is connected to the PE terminal using an M8 bolt with a torque of 8 N·m.

4.3 Opening the Maintenance Compartment Door

WARNING:

1. Loosen the two screws on the maintenance compartment door using a security torx wrench.

2. Open the maintenance compartment door and install the support bar.

3. Remove the cover and hang it on the hook of the enclosure door.

NOTE: If the screws on the enclosure door are lost, obtain spare screws from the fitting bag bound to the inductor cover at the bottom of the enclosure.

4.4 Installing AC Output Power Cables

1. Remove the sealing nut and rubber liner from the AC OUTPUT cable gland.

2. Route the cable through the cable gland.

NOTICE:

The diagram shows how to select the correct rubber fitting based on the cable diameter (D).

3. Remove an appropriate length of the jacket and insulation layer from the AC output power cable using a wire stripper. (Ensure that the jacket is in the maintenance compartment.)

a. Three-core cable (excluding the ground cable)

b. Four-core cable (including the ground cable)

4. Crimp an OT terminal.

5. Connect the AC output power cable to the terminal block, and then tighten the nut using a torque wrench that has an extension rod.

NOTICE:

6. Tighten the thread-lock sealing nut.

7. Clear debris from the maintenance compartment.

4.5 Installing DC Input Power Cables

Selecting DC Input Terminals

NOTE:

WARNING: Ensure that the PV module output is well insulated to ground.

The diagram shows the DC input terminals numbered 1 to 12, corresponding to MPPT1 through MPPT6.

The connection involves using Amphenol Helios H4 PV connectors. Crimp the metal contacts using H4TC0003 or H4TC0002 crimping tool. Insert the crimped terminals into the appropriate positive and negative connectors. Connect the positive and negative connectors to the DC input terminals. Ensure secure connections by pulling the cables.

NOTICE:

Use a multimeter to measure the DC voltage. Ensure that the locking nut is secured.

NOTICE:

4.6 Installing the RS485 Communications Cable

NOTICE:

Terminal Block Connection (Recommended)

1. Remove an appropriate length of the jacket and core wire insulation layer from the communications cable using a wire stripper.

2. Route the cable through the cable gland.

3. Remove the cable terminal base from the terminal block. Connect the communications cable to the terminal base.

No. Port Definition Description
1 RS485A IN RS485A, RS485 differential signal+
2 RS485A OUT RS485A, RS485 differential signal+
3 RS485B IN RS485B, RS485 differential signal-
4 RS485B OUT RS485B, RS485 differential signal-

4. Install the terminal base on the terminal block, and connect the shield layer to the ground point.

NOTE:

5. Bind the communications cable.

6. Tighten the thread-lock sealing nut and seal the cable gland.

RJ45 Network Port Connection

1. Prepare an RJ45 connector.

2. Route the cable through the cable gland.

3. Insert the RJ45 connector into the RJ45 network port in the SUN2000 maintenance compartment.

4. Bind the communications cable.

NOTE: Tie the communication cables with the cables on internal side of the maintenance compartment.

5. Tighten the thread-lock sealing nut and seal the cable gland.

5 Verifying the Installation

Check the following items to verify the installation:

Yes No N/A
1. The SUN2000 is installed correctly and securely.
2. The DC switches and downstream AC switch are OFF.
3. All ground cables are connected securely, without open circuits or short circuits.
4. AC output power cables are connected correctly and securely, without open circuits or short circuits.
5. DC input power cables are connected correctly and securely, without open circuits or short circuits.
6. The RS485 communications cable is connected correctly and securely.
7. Check that all used cable glands at the bottom of the enclosure are sealed, and that the thread-lock sealing nut is tightened.
8. The AC terminal cover is reinstalled.
9. The maintenance compartment door is closed and the door screws are tightened.
10. Unused DC input terminals are sealed.
11. Unused USB ports are plugged with watertight caps.
12. Unused cable glands are plugged and the thread-lock sealing nuts are tightened.

6 Powering On the System

NOTICE: Before turning on the AC switch between the SUN2000 and the power grid, use a multimeter to check that the AC voltage is within the specified range.

  1. Turn on the AC switch between the SUN2000 and the power grid.
  2. Turn on the DC switches at the SUN2000 bottom.

7 SUN2000 App

NOTE:

The app allows for WLAN or Bluetooth connection, or USB data cable connection. The app interface includes sections for Login Page, Select Connection Mode, Select User, and Quick Settings.

NOTICE:

8 Grid Codes

The table lists supported grid codes for different SUN2000 models.

No. Grid Code Description SUN2000-50KTL-JPM0 SUN2000-50KTL-JPM1 SUN2000-63KTL-JPM0
1 Japan standard (50Hz) Japan power grid (MV480-50 Hz) Supported Supported Supported
2 Japan standard (60Hz) Japan power grid (MV480-60 Hz) Supported Supported Supported
3 Japan standard (MV420-50Hz) Japan power grid (MV420-50 Hz) Supported N/A N/A
4 Japan standard (MV420-60Hz) Japan power grid (MV420-60 Hz) N/A Supported N/A
5 Japan standard (MV440-50Hz) Japan power grid (MV440-50 Hz) Supported Supported Supported
6 Japan standard (MV440-60Hz) Japan power grid (MV420-60 Hz) Supported Supported Supported

NOTE: The grid codes are subject to change. The listed codes are for your reference only.

Models: 50KTL-JPM0, 50KTL-JPM1, 63KTL-JPM0, SUN2000-50KTL-JPM0 Three-Phase Power Conditioner, Three-Phase Power Conditioner, Power Conditioner, Conditioner

File Info : application/pdf, 17 Pages, 1.95MB

PDF preview unavailable. Download the PDF instead.

SUN2000-(50KTL-JPM0, 50KTL-JPM1, 63KTL-JPM0) Quick Guide Microsoft PowerPoint 2013 Microsoft PowerPoint 2013

Related Documents

Preview Huawei C&I Inverter PV Warranty Policy (Oversea) - Official Document
Official C&I Inverter Photovoltaic (PV) Warranty Policy from Huawei. Details service scope, warranty periods, storage conditions, service content, and disclaimers for Huawei's C&I PV solutions.
Preview Huawei SDongleA-03 Smart Dongle (4G) Quick Guide
A quick guide for the Huawei SDongleA-03 Smart Dongle (4G), detailing its communication scenarios, installation, commissioning, LED indicators, performance parameters, and frequency bands for various regions. This document provides essential information for setting up and operating the SDongleA-03 with Huawei inverters and management systems.
Preview Huawei SUN2000-(50KTL-ZHM3, 50KTL-M3) User Manual: Installation, Operation, and Maintenance
Comprehensive user manual for Huawei SUN2000-50KTL-ZHM3 and SUN2000-50KTL-M3 solar inverters, detailing installation, electrical connections, commissioning, maintenance, troubleshooting, and technical specifications for safe and efficient operation.
Preview Huawei SUN2000 Inverter and Networking Devices Installation and Troubleshooting Guide
Comprehensive guide to installing and troubleshooting Huawei SUN2000 series solar inverters, Smart Dongles, SmartLoggers, and DTSU666-H smart power sensors. Includes video links, document references, and technical specifications.
Preview Huawei SUN2000 Series Solar Inverter Certificate of Conformity
Official Certificate of Conformity for Huawei SUN2000 series solar inverters, confirming compliance with CEI 0-16:2022 standards. Includes detailed technical specifications for models SUN2000-17KTL-M3 through SUN2000-50KTL-M3.
Preview HUAWEI SUN2000-(2KTL-5KTL)-L1 User Manual: Installation, Operation, and Maintenance Guide
Comprehensive user manual for the HUAWEI SUN2000-(2KTL-5KTL)-L1 series of single-phase grid-tied solar inverters. Covers installation, electrical connection, commissioning, maintenance, and troubleshooting for residential PV systems.
Preview Huawei SUN2000-(3KTL-10KTL)-M1 User Manual: Installation, Operation, and Maintenance Guide
Detailed user manual for Huawei SUN2000 series solar inverters (3KTL-M1 to 10KTL-M1). Covers installation, electrical connections, commissioning, maintenance, troubleshooting, and technical specifications for residential and small-scale PV systems. Includes information on Smart PV optimizers.
Preview Huawei SUN2000-(3KTL-10KTL)-M1 User Manual: Installation, Operation, and Maintenance Guide for PV Systems
Official user manual for Huawei SUN2000 series grid-tied PV string inverters (models SUN2000-3KTL-M1 through SUN2000-10KTL-M1). This guide details installation, electrical connections, commissioning, maintenance, and troubleshooting for solar power systems.