Geberit Duofix Installation Manual

Brand: Geberit

Product Data

Product Specifications

Concealed tank and bowl carrier, wall-hung two-hole toilet bowl and actuator plate. Geberit Model No. 111.012.00.1. The tank and carrier system shall fit within a minimum 5 1/2" (140) deep wall with studs placed 19 3/4" (500) apart. Water supply shall be 1/2" copper, with a minimum water pressure of 35 PSI. The bowl shall be an IAMPO listed 1.6 gallon (6 l) per flush wall-hung bowl. The carrier shall have adjustable height for a 15" (381) to 19" (483) bowl rim height. Actuator plates shall be die-cast zinc, plastic, or stainless steel and plated to preserve material integrity.

UPC Certified

Features

Dimensions

A technical drawing illustrating the physical dimensions of the Geberit Duofix system. It shows measurements for width (e.g., 19 3/4"), height (e.g., 29 3/4"), depth (e.g., 5 1/2"), and distances between mounting points. Key labels include 'FRH' (Finished Rim Height) and 'FF' (Finished Floor).

Material Determination

Recommended material for wall surface construction:

ℹ️ Wall thickness not to exceed 3".

Options

Vertical discharge elbow 3" DWV standard:

Warranty

Installation

Installation Requirements

To install the tank and carrier, a 2 x 6" wood frame or metal frame construction is required. Studs must be placed 19 3/4" apart (clearance) where the carrier will be positioned inside the wall.

Bowl Finished Rim Height (FRH)

Remove the carrier and installation hardware from its box. Determine the FRH for the wall-hung bowl and adjust the carrier height in accordance with the requirement. Dimensions can be taken from the bowl or carrier specification sheet. Be sure to allow for finished floor and sole plate height.

Discharge Elbow Installation

Diagrams illustrating the connection of the discharge elbow. Shows different angles and configurations for horizontal left, horizontal right, and vertical discharge pipes, with corresponding measurement ranges (e.g., 3 1/2" to 4 3/4" and 3 1/8" to 5 3/16").

Diagrams 1-4: Illustrate the process of connecting the discharge elbow, showing pipe insertion, seal fitting, and measurement marking.

Tank and Carrier Installation

  1. Locate carrier supporting studs and reinforce with additional nails. Ensure rough-in for the carrier is plumb and square. Wall framework must be affixed to the floor and ceiling for maximum support.
  2. Position carrier unit in the prepared opening. Carrier face plate must be flush with the front of the surrounding studs to ensure maximum support for the wall sheeting (applied later). With the carrier still in place, mark all anchor and bolt hole locations on the sole plate and studs. Mark the location for the 3" DWV discharge pipe.
  3. Pull out carrier from framework and drill six (6) pilot holes (3/16") for the supplied lag screws where marked on the sole plate. Also drill six (6) bolt holes (5/16") where marked on both studs. Use a hole saw and bore a 4" hole through the sole plate and floor for the discharge stop-out pipe.
  4. Install 3" DWV waste pipe through the floor and connect to the waste line (e.g., PVC, copper, cast iron).
  5. Set carrier unit sideways back into the framework and bolt in place with hardware provided.
  6. Complete waste elbow connection with the 3" DWV shielded coupling (D - provided) to the waste pipe.
  7. Install two (2) 1/2" x 6" fixture support rods with plastic sleeves (A), yellow pipe caps (B), and mud guard (C) for protection during wall surface construction.

Diagram illustrating the tank and carrier installation process, showing mounting to studs, drilling, waste pipe installation, and elbow connection. Key components are labeled A, B, C, and D.

Diagram showing fixture support rods, pipe caps, and mud guard being installed.

Visual indicators showing a range of 0° to 45°.

ℹ️ For finishing the installation of the bowl and actuator plate, see detailed instructions.

Water Supply Installation

  1. Diagram 1: Shows the carrier unit with water supply connection points highlighted, indicated by numbered circles [part 1] and [part 2].
  2. Diagram 2: Close-up of the NPT 1/2" elbow and fill valve components.
  3. Diagram 3: Illustrates connecting the water supply pipe and elbow to the carrier unit. Parts indicated by numbered circles [part 1] and [part 2].
  4. Diagram 4: Shows further connection of the water supply pipe, with a rotational arrow indicating tightening.

Mud Guard Installation

  1. Diagram 1: Shows the placement of the mud guard and insulation pad. Parts indicated by numbered circles [part 1] and [part 2].
  2. Diagram 2: Shows the mud guard and insulation pad fitted into place.

Bowl Installation

  1. Remove yellow protection plugs and seals from pipes.
  2. Insert discharge pipe into the pipe hub in the wall. Place a straight edge flush against the wall and mark a line on the pipe. Fit finned rubber seal onto flush pipe. Repeat same procedure for discharge pipe.
  3. Place discharge pipe with gasket into waste outlet of bowl. Also place flush pipe with fin gasket into inlet of bowl. Then mark a second line on both pipes.
  4. Install wall surface material such as high density Gypsum / green Board, Cement Board, Tile Backer Board with optional ceramic tile finish surface as the most suitable materials. Provide cut outs for the protruding parts like inlet and outlet pipes and the rectangular access box.
  5. Add dimension X and 1/8". Using that dimension, mark a line on the pipe measuring from the hub side. Cut off the pipe at the line with a pipe cutter.
  6. Add dimension Y and 1/8". Using that dimension, mark a line on the pipe measuring from the hub side. Cut off the pipe at the line with a pipe cutter.
  7. Bevel the sharp edges as shown to assure a smooth insertion into the pipe hubs in the wall.
  8. Install both seals into the pipes in the wall. Lubricate seals with appropriate rubber seal lubricant.
  9. Remove protective sleeves from mounting rods. Determine protruding rod length for bowl installation. Install both pipes into the hubs in the wall.
  10. Place bowl onto rods. Attach cap washer with nose up and facing forwards onto rods. Install washer and hex nuts, hand tighten. Level bowl. Tighten hex nuts. Snap on the bolt caps. Cut off insulation pad if mounted.
  11. Seal gap around bowl with silicone.

Diagrams illustrating the removal of protective plugs and seals from pipes.

Diagram showing insertion of discharge and flush pipes into the wall hub, fitting seals, and marking cut lines.

Diagram illustrating the installation of wall surface materials and the need for cutouts.

Diagrams showing pipe cutting based on dimensions X and Y, adding 1/8" (3 mm) and marking cut lines.

Diagram illustrating beveling pipe edges for smooth insertion.

Diagram showing installation of seals into wall pipes and lubrication.

Diagram depicting installation of pipes into wall hubs after preparing mounting rods.

Diagrams showing the wall-hung bowl being placed onto mounting rods, secured with washers and nuts, leveled, and finished with bolt caps.

Diagram illustrating the application of silicone sealant around the bowl.

⚠️ CAUTION: High torque forces. WC ceramic appliance may break. ► Do not overtighten hex nuts.

ℹ️ Sound insulation pad is optional or required.

Contact Information

Geberit
2100 Clearwater Drive, Des Plaines, IL 60018-5999
Phone: (847) 803 5000 | Fax: 847/803-5454
For Technical Assistance: 800 / TEC-TRUE (800-832-8783)
www.geberit.us

Geberit International AG
Schachenstrasse 77, CH-8645 Jona
T +41 55 221 63 00 | F +41 55 221 63 16
documentation@geberit.com
www.geberit.com

PDF preview unavailable. Download the PDF instead.

geberit-111.012-installation-sheet

Related Documents

Preview Geberit Duofix Installation Manual: Step-by-Step Guide
This installation manual provides detailed, step-by-step instructions for the Geberit Duofix concealed cistern system. It covers frame mounting, pipe connections, and final adjustments, with clear diagrams and multilingual text. Essential for plumbers and DIY installers.
Preview Geberit Duofix Installation Manual: Model 111.798.00.1
Comprehensive installation manual for the Geberit Duofix concealed cistern system, model 111.798.00.1. Includes product specifications, installation dimensions, material requirements, and step-by-step assembly instructions for various wall types and configurations, including compatibility with Geberit AquaClean models.
Preview Geberit Installation System: Duofix Carrier & Sigma Tank for Wall-Hung Toilets
Technical specifications, features, warranty, and compatibility list for the Geberit Duofix carrier system and Sigma concealed tank, designed for 1.6/0.8 GPF and 1.28/0.8 GPF wall-hung toilets. Includes ADA and WaterSense compliance details.
Preview Geberit Duofix Element for Wall-Hung WC 112cm with Delta Concealed Cistern & Delta25 Flush Plate
Comprehensive product overview of the Geberit Duofix element for wall-hung WCs. Features include a 112cm frame, 12cm Delta concealed cistern, and Delta25 flush plate. Details application purposes, characteristics, technical data, scope of delivery, and accessories.
Preview Geberit Duofix Installation Manual: Concealed Cistern System
Comprehensive installation manual for the Geberit Duofix in-wall carrier system. Includes product specifications, water quality and temperature guidelines, material recommendations, maintenance advice, and detailed step-by-step installation instructions for professional plumbers and installers.
Preview Geberit Duofix Installation Manual
Comprehensive installation guide for the Geberit Duofix concealed cistern frame, detailing assembly steps, dimensions, and mounting instructions for bathroom installations.
Preview Geberit Installation System for Wall-Hung Toilets: Specifications and Compatibility
Comprehensive guide to the Geberit Duofix carrier system and Sigma concealed tank for 1.6/0.8 GPF and 1.28/0.8 GPF wall-hung toilets. Details product specifications, features, warranty, compliance, and lists compatible toilet bowl models from various brands.
Preview Geberit Duofix Installation Manual
Comprehensive installation manual for the Geberit Duofix element, providing step-by-step instructions for mounting and assembly of concealed cistern systems. Includes technical details, dimensions, and visual guides.