Albeo® LED Luminaire Modular High & Low Bay Lighting (ABV3-Series)
Installation Guide ALB062
Features
- 5 year warranty
- Damp location rated
Before You Begin
Before You Begin: Read these instructions completely and carefully.
Warnings
WARNING!
Risk of Electric Shock
Turn power off before inspection, installation or removal.
Properly ground electrical enclosure.
Risk of Fire
Follow all NEC and local codes.
Use only UL or IEC approved wire for input/output connections. Minimum size 18 AWG.
FCC & IC Compliance
This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: (1) This device may not cause harmful interference, and (2) this device must accept any interference received, including interference that may cause undesired operation. CAN ICES-005 (A) / NMB-005 (A).
This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules. These limits are designed to provide reasonable protection against harmful interference when the equipment is operated in a commercial environment. This equipment generates, uses, and can radiate radio frequency energy and, if not installed and used in accordance with the instruction manual, may cause harmful interference to radio communications. Operation of this equipment in a residential area is likely to cause harmful interference in which case the user will be required to correct the interference at his own expense.
Save These Instructions
Use only in the manner intended by the manufacturer. If you have any questions, contact the manufacturer.
NOTE: Contact the manufacturer for details and limitations when seeking to incorporate this product with an emergency system other than Battery Backup.
Prepare Electrical Wiring
Electrical Requirements
The LED driver must be supplied with 120-480 VAC, 50/60 Hz per product label and connected to an individual properly grounded branch circuit, protected by a 15 or 20 ampere circuit breaker.
Grounding Instructions
The grounding and bonding of the overall system shall be done in accordance with National Electric Code (NEC) Article 600 and local codes.
Installation Steps
Step 1: Prepare Fixture
Open the fixture housing. For 347/480v models, follow specific steps for opening the box. For 120/277V models, access the knock-out plate for wiring.
Step 2: Wire Routing
Route the supply wires through the knock-out plate into the fixture housing. Ensure wires are not pinched.
Step 3: Electrical Connections
Connect the wires according to the voltage and dimming requirements. Refer to the following color codes:
Voltage | Line (L) | Neutral (N) | Ground | +DIM | -DIM |
---|---|---|---|---|---|
120/277V | Black (1) | White (2) | Green (3) | Violet/White Stripe | Pink |
347/480V | Red (1) | Black (2) | Green (3) | Violet/White Stripe | Pink |
347/480V (Factory Installed Cable) | Black (1) | White (2) | Green (3) | Violet/White Stripe | Pink |
Step 4: Mounting Bracket Installation
Determine mounting locations. The mounting bracket can be installed at various spacings, indicated by dimensions 7.85", 21.40", and 34.95". Attach the mounting bracket to the ceiling structure.
Step 5: Attach Fixture to Bracket
Secure the fixture to the installed mounting bracket using the provided hardware.
Step 6: Suspend Fixture
Use safety cables to suspend the fixture from the mounting structure before fully securing it.
Step 7: Inverted Mounting
The fixture supports inverted mounting configurations. Follow specific diagrams for inverted installation.
Troubleshooting
Symptom | Solution |
---|---|
Luminaire will not turn on |
|